메뉴 건너뛰기




Volumn 131, Issue 2, 2005, Pages 187-194

Time-cost relationships in Australian building construction projects

Author keywords

Australia; Construction industry; Costs; Project management; Time factors: Least squares method

Indexed keywords

COSTS; FORECASTING; LEAST SQUARES APPROXIMATIONS; MATHEMATICAL MODELS; PROJECT MANAGEMENT; REGRESSION ANALYSIS;

EID: 12744250283     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:2(187)     Document Type: Review
Times cited : (95)

References (27)
  • 2
    • 0002232162 scopus 로고
    • Contract time performance expectations and the reality
    • Bromilow, F. J. (1969). "Contract time performance expectations and the reality." Build. Forum, 1(3), 70-80.
    • (1969) Build. Forum , vol.1 , Issue.3 , pp. 70-80
    • Bromilow, F.J.1
  • 3
    • 0001916379 scopus 로고
    • AIQS survey of building contract time performance
    • Bromilow, F. J., Hinds, M. F., and Moody, N. F. (1980). "AIQS survey of building contract time performance." Build. Econ., 19, 79-82.
    • (1980) Build. Econ. , vol.19 , pp. 79-82
    • Bromilow, F.J.1    Hinds, M.F.2    Moody, N.F.3
  • 5
    • 4143115568 scopus 로고
    • Performance on site and the building client
    • Chartered Institute of Building, Ascot, U.K.
    • Bresnen, M. J., Haslam, C. O., Beardsworth, A. D., Bryman, A. E., and Hell, T. E. (1988). "Performance on site and the building client." Occasional Paper 42, Chartered Institute of Building, Ascot, U.K.
    • (1988) Occasional Paper , vol.42
    • Bresnen, M.J.1    Haslam, C.O.2    Beardsworth, A.D.3    Bryman, A.E.4    Hell, T.E.5
  • 6
    • 0242686371 scopus 로고
    • Evaluation of novation contract
    • Univ. of New South Wales (UNSW), New South Wales, Australia
    • Chan, A. P. C. (1994). "Evaluation of novation contract." Proc., National Construction and Management Conf., Univ. of New South Wales (UNSW), New South Wales, Australia, 383-396.
    • (1994) Proc., National Construction and Management Conf. , pp. 383-396
    • Chan, A.P.C.1
  • 11
    • 12744266272 scopus 로고    scopus 로고
    • Experiencing a renovation; A practical guide for principals
    • National Association of School Principals, Washington, D.C.
    • Earthman, G., and Draeger, (2001). "Experiencing a renovation; A practical guide for principals." Publication No. 2100201. National Association of School Principals, Washington, D.C.
    • (2001) Publication No. 2100201
    • Earthman, G.1    Draeger2
  • 13
    • 0040941588 scopus 로고
    • Construction changes and change orders: Their magnitude and impact
    • Construction Industry Institute, The Univ. of Texas at Austin, Austin, Tex
    • Hester, W. T., Kuprenas, J. A., and Chang, T. C. (1991). "Construction changes and change orders: Their magnitude and impact." Source Document 66, Construction Industry Institute, The Univ. of Texas at Austin, Austin, Tex.
    • (1991) Source Document , vol.66
    • Hester, W.T.1    Kuprenas, J.A.2    Chang, T.C.3
  • 14
    • 11344268966 scopus 로고
    • Quantitative impacts of project change
    • Construction Industry Institute, The Univ. of Texas at Austin, Austin, Tex
    • Ibbs, C. W., and Allen, W. E. (1995). "Quantitative impacts of project change." Source Document 108, Construction Industry Institute, The Univ. of Texas at Austin, Austin, Tex.
    • (1995) Source Document , vol.108
    • Ibbs, C.W.1    Allen, W.E.2
  • 16
    • 0035576563 scopus 로고    scopus 로고
    • The predictive ability of Bromilow's time-cost model: A comment
    • Kenley, R. (2001). "The predictive ability of Bromilow's time-cost model: A comment." Civ. Eng. Pract., 19(8), 759-764.
    • (2001) Civ. Eng. Pract. , vol.19 , Issue.8 , pp. 759-764
    • Kenley, R.1
  • 17
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • Love, P. E. D. (2002). "Influence of project type and procurement method on rework costs in building construction projects." J. Constr. Eng. Manage., 128(1), 18-29.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 18
    • 0035281795 scopus 로고    scopus 로고
    • The predictive ability of Bromilow's time-cost model
    • Ng, T., Mak, M. M. Y., Skitmore, M., and Varnam, M. (2001). "The predictive ability of Bromilow's time-cost model." Civ. Eng. Pract., 19(2), 165-173.
    • (2001) Civ. Eng. Pract. , vol.19 , Issue.2 , pp. 165-173
    • Ng, T.1    Mak, M.M.Y.2    Skitmore, M.3    Varnam, M.4
  • 21
    • 12744252620 scopus 로고    scopus 로고
    • Australian project-time analysis: Statistical analysis of intertemporal trends
    • Skitmore, M., and Ng, T. (2001). "Australian project-time analysis: Statistical analysis of intertemporal trends." Civ. Eng. Pract., 19(5), 455-458.
    • (2001) Civ. Eng. Pract. , vol.19 , Issue.5 , pp. 455-458
    • Skitmore, M.1    Ng, T.2
  • 27
    • 0347142667 scopus 로고    scopus 로고
    • Developing a cost-time model for estimating construction durations of sewerage projects in Perth, Western Australia
    • Yousef, G., and Baccarini D. (2001). "Developing a cost-time model for estimating construction durations of sewerage projects in Perth, Western Australia." J. Constr. Res., 2(2), 213-220.
    • (2001) J. Constr. Res. , vol.2 , Issue.2 , pp. 213-220
    • Yousef, G.1    Baccarini, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.