메뉴 건너뛰기




Volumn 56, Issue 12, 2006, Pages 1649-1661

Uncertainty analysis of integrated gasification combined cycle systems based on frame 7H versus 7F gas turbines

Author keywords

[No Author keywords available]

Indexed keywords

COAL; DECISION MAKING; FEEDSTOCKS; GASIFICATION; INTEGRATED CONTROL; PARTICULATE EMISSIONS; POWER GENERATION;

EID: 33845944471     PISSN: 10962247     EISSN: 21622906     Source Type: Journal    
DOI: 10.1080/10473289.2006.10464570     Document Type: Article
Times cited : (10)

References (38)
  • 1
    • 10844280435 scopus 로고    scopus 로고
    • Final Report, Prepared by Science Applications International Corporation for the U.S. Department of Energy: Washington DC, December, (accessed 2006)
    • Ratafia-Brown, J.; Manfredo, L.; Hoffmann, J.; Ramezan, M. Major Environmental Aspects of Gasification-Based Power Generation Technologies. Final Report, Prepared by Science Applications International Corporation for the U.S. Department of Energy: Washington DC, December 2002; available at http://www.netl.doe.gov/technologies/coalpower/gasification/pubs/pdf/final%20env.pdf (accessed 2006).
    • (2002) Major Environmental Aspects of Gasification-Based Power Generation Technologies
    • Ratafia-Brown, J.1    Manfredo, L.2    Hoffmann, J.3    Ramezan, M.4
  • 2
    • 10644255656 scopus 로고    scopus 로고
    • Operation Experience and Improvement Opportunities for Coal-Based IGCC Plants
    • Holt, N. Operation Experience and Improvement Opportunities for Coal-Based IGCC Plants; Mater. High Temp. 2003, 20, 1-6.
    • (2003) Mater. High Temp , vol.20 , pp. 1-6
    • Holt, N.1
  • 3
    • 0033881677 scopus 로고    scopus 로고
    • Comparison between Two Gas Turbine Solutions to Increase Combined Power Plant Efficiency
    • Carcasci, C.; Facchini, B. Comparison between Two Gas Turbine Solutions to Increase Combined Power Plant Efficiency; Energy Conversion Manage. 2000, 41, 757-773.
    • (2000) Energy Conversion Manage , vol.41 , pp. 757-773
    • Carcasci, C.1    Facchini, B.2
  • 4
    • 0031259174 scopus 로고    scopus 로고
    • Optimal Design of Advanced Power Systems under Uncertainty
    • Diwekar, U.M.; Rubin, E.A.; Frey, H.C. Optimal Design of Advanced Power Systems under Uncertainty; Energy Conversion Manage. 1997, 38, 1725-1735.
    • (1997) Energy Conversion Manage , vol.38 , pp. 1725-1735
    • Diwekar, U.M.1    Rubin, E.A.2    Frey, H.C.3
  • 5
    • 15944377126 scopus 로고    scopus 로고
    • IGCC Power Plants-EPRI Design & Cost Studies
    • San Francisco, CA, Gasification Technologies Council: Washington, DC
    • Holt, N. IGCC Power Plants-EPRI Design & Cost Studies. In 1998 Gasification Technologies Conference; San Francisco, CA, 1998; Gasification Technologies Council: Washington, DC.
    • (1998) 1998 Gasification Technologies Conference
    • Holt, N.1
  • 8
    • 33845926811 scopus 로고    scopus 로고
    • Baglan Bay Begins Service
    • Staff report. Baglan Bay Begins Service; Power 2003, 147, 7.
    • (2003) Power , vol.147 , pp. 7
  • 11
    • 0026933915 scopus 로고
    • Integration of Coal Utilization and Environmental Control in Integrated Gasification Combined Cycle Systems
    • Frey, H.C.; Rubin, E.S. Integration of Coal Utilization and Environmental Control in Integrated Gasification Combined Cycle Systems; Environ. Sci. Technol. 1992, 26, 1982-1990.
    • (1992) Environ. Sci. Technol , vol.26 , pp. 1982-1990
    • Frey, H.C.1    Rubin, E.S.2
  • 12
    • 0028413599 scopus 로고
    • Modeling Uncertainties in Advanced Technologies: Application to a Coal Gasification System with Hot-Gas Cleanup
    • Frey, H.C.; Rubin, E.S.; Diwekar, U.M. Modeling Uncertainties in Advanced Technologies: Application to a Coal Gasification System with Hot-Gas Cleanup; Energy 1994, 19, 449-463.
    • (1994) Energy , vol.19 , pp. 449-463
    • Frey, H.C.1    Rubin, E.S.2    Diwekar, U.M.3
  • 14
    • 10644266503 scopus 로고    scopus 로고
    • Uncertainty Evaluation in Capital Cost Projection
    • McKetta, J.J., Ed.; Marcel Dekker: New York, NY
    • Frey, H.C.; Rubin, E.S. Uncertainty Evaluation in Capital Cost Projection. In Encyclopedia of Chemical Processing and Design; McKetta, J.J., Ed.; Marcel Dekker: New York, NY, 1997, Vol. 59, pp 480-494.
    • (1997) Encyclopedia of Chemical Processing and Design , vol.59 , pp. 480-494
    • Frey, H.C.1    Rubin, E.S.2
  • 15
    • 0026868636 scopus 로고
    • Evaluation of Advanced Coal Gasification Com-bined-Cycle Systems under Uncertainty
    • Frey, H.C.; Rubin, E.S. Evaluation of Advanced Coal Gasification Com-bined-Cycle Systems under Uncertainty; Ind. Eng. Chem. Res. 1992, 31, 1299-1307.
    • (1992) Ind. Eng. Chem. Res , vol.31 , pp. 1299-1307
    • Frey, H.C.1    Rubin, E.S.2
  • 18
    • 4444222535 scopus 로고    scopus 로고
    • Contract No. DE-AC01-94FE62747; prepared by Parsons Infrastructure and Technology for the U.S. Department of Energy, Office of Fossil Energy: Washington, DC
    • Buchanan, T.L.; DeLallo, M.R.; Goldstein, H.N.; Grubbs, G.W.; Whites, J.S. Market-Based Advanced Coal Power Systems; Contract No. DE-AC01-94FE62747; prepared by Parsons Infrastructure and Technology for the U.S. Department of Energy, Office of Fossil Energy: Washington, DC, 1998.
    • (1998) Market-Based Advanced Coal Power Systems
    • Buchanan, T.L.1    Delallo, M.R.2    Goldstein, H.N.3    Grubbs, G.W.4    Whites, J.S.5
  • 20
    • 6144244451 scopus 로고
    • Prepared by Massachusetts Institute of Technology for U.S. Department of Energy, Morgantown Energy Technology Center: Morgantown, WV, Revised 1987
    • MIT. ASPEN User Manual, Vol. 1 and 2; Prepared by Massachusetts Institute of Technology for U.S. Department of Energy, Morgantown Energy Technology Center: Morgantown, WV, 1982, Revised 1987.
    • (1982) ASPEN User Manual , vol.1-2
  • 22
    • 0026104519 scopus 로고
    • Stochastic Modeling of Chemical Processes
    • Diwekar, U.M.; Rubin, E.S. Stochastic Modeling of Chemical Processes; Comput. Chem. Eng. 1991, 15, 105-114.
    • (1991) Comput. Chem. Eng , vol.15 , pp. 105-114
    • Diwekar, U.M.1    Rubin, E.S.2
  • 23
    • 33644864377 scopus 로고    scopus 로고
    • Contract No. DE-AC26-99FT40342; Prepared by Bechtel Corp., Global Energy Inc., and Nexant Inc. for the U.S. Department of Energy, National Energy Technology Laboratory: Morgantown, WV
    • Bechtel Corp.; Global Energy Inc.; Nexant Inc. Gasification Plant Cost and Performance Optimization: Task 1 Topical Report, IGCC Plant Cost Optimization; Contract No. DE-AC26-99FT40342; Prepared by Bechtel Corp., Global Energy Inc., and Nexant Inc. for the U.S. Department of Energy, National Energy Technology Laboratory: Morgantown, WV, 2002.
    • (2002) Gasification Plant Cost and Performance Optimization: Task 1 Topical Report, IGCC Plant Cost Optimization
  • 29
    • 30244497969 scopus 로고    scopus 로고
    • Uncertainty in Full Fuel Cycle Costs
    • Hope, C. Uncertainty in Full Fuel Cycle Costs; Energy Conversion Manage. 1996, 37, 825-830.
    • (1996) Energy Conversion Manage , vol.37 , pp. 825-830
    • Hope, C.1
  • 31
    • 0036080354 scopus 로고    scopus 로고
    • Illustration of Sampling-Based Methods for Uncertainty and Sensitivity Analysis
    • Helton, J.C.; Davis, F.J. Illustration of Sampling-Based Methods for Uncertainty and Sensitivity Analysis; Risk Anal. 2002, 22, 591-622.
    • (2002) Risk Anal , vol.22 , pp. 591-622
    • Helton, J.C.1    Davis, F.J.2
  • 32
    • 0036085488 scopus 로고    scopus 로고
    • Identification and Review of Sensitivity Analysis Methods;
    • Frey, H.C; Patil, S.R. Identification and Review of Sensitivity Analysis Methods; Risk Anal. 2002, 22, 553-578.
    • (2002) Risk Anal , vol.22 , pp. 553-578
    • Frey, H.C.1    Patil, S.R.2
  • 33
    • 0003658949 scopus 로고    scopus 로고
    • SAS Institute Inc.: Cary, NC, (accessed 2003)
    • SAS OnlineDoc 1999. SAS Version 8.1, SAS Institute Inc.: Cary, NC; available at http://v8doc.sas.com/sashtml/welcome.htm (accessed 2003).
    • (1999) SAS Version 8.1
  • 37
    • 77953960529 scopus 로고    scopus 로고
    • EPA454-K-05-001; U.S. Environmental Protection Agency: Washington, DC
    • x Budget Trading Program, 2004; EPA454-K-05-001; U.S. Environmental Protection Agency: Washington, DC, 2005.
    • (2005) X Budget Trading Program, 2004
  • 38
    • 2942623841 scopus 로고    scopus 로고
    • Optimizing Compliance Cost for Coal-Fired Electric Generating Facilities in a Multipollutant Control Environment
    • Baltimore, MD, March 30 to April 1
    • Staudt, J.E. Optimizing Compliance Cost for Coal-Fired Electric Generating Facilities in a Multipollutant Control Environment. In Proceedings ASME Power 2004; ASME Power Conference; Baltimore, MD, March 30 to April 1, 2004.
    • (2004) Proceedings ASME Power 2004; ASME Power Conference
    • Staudt, J.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.