-
1
-
-
0033871635
-
Scheduling no-wait robotic cells with two and three machines
-
[CSA]
-
Agnetis, A. (2000) Scheduling no-wait robotic cells with two and three machines European Journal of Operational Research, 123, pp. 303-314. http://www.csa.com/htbin/linkabst.cgi?issn=0377-2217&vol=123&iss= &firstpage=303 [CSA]
-
(2000)
European Journal of Operational Research
, vol.123
, pp. 303-314
-
-
Agnetis, A.1
-
2
-
-
0013112614
-
Final results on the one-cycle conjecture in robotic cells
-
Grenoble: Laboratoire LEIBNIZ, Institut IMAG. Internal note
-
Brauner, N. and Finke, G. (1997) Final results on the one-cycle conjecture in robotic cells. Grenoble: Laboratoire LEIBNIZ, Institut IMAG. Internal note
-
(1997)
-
-
Brauner, N.1
Finke, G.2
-
3
-
-
0002804434
-
On a conjecture in robotic cells: New simplified proof for the three-machine case
-
[CSA]
-
Brauner, N. and Finke, G. (1999a) On a conjecture in robotic cells: New simplified proof for the three-machine case INFOR, 37, pp. 20-36. http://www.csa.com/htbin/linkabst.cgi?issn=0812-9304&vol=37&iss= &firstpage=20 [CSA]
-
(1999)
INFOR
, vol.37
, pp. 20-36
-
-
Brauner, N.1
Finke, G.2
-
4
-
-
0003570730
-
On Cycles and Permutations in Robotic Cells
-
Grenoble: Laboratoire LEIBNIZ, Institut IMAG. Technical Report RR 1010-I
-
Brauner, N. and Finke, G. (1999b) On Cycles and Permutations in Robotic Cells. Grenoble: Laboratoire LEIBNIZ, Institut IMAG. Technical Report RR 1010-I
-
(1999)
-
-
Brauner, N.1
Finke, G.2
-
5
-
-
0036476753
-
Multicyclic hoist scheduling with constant processing times
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=1042-296X&vol= 18&iss=1&firstpage=69 [CSA]
-
Che, A. and Chu, C. and Chu, F. (2002) Multicyclic hoist scheduling with constant processing times IEEE Transactions on Robotics and Automation, 18(1), pp. 69-80. http://dx.doi.org/10.1109%2F70.988976 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=1042-296X&vol=18&iss= 1&firstpage=69 [CSA]
-
(2002)
IEEE Transactions on Robotics and Automation
, vol.18
, Issue.1
, pp. 69-80
-
-
Che, A.1
Chu, C.2
Chu, F.3
-
6
-
-
0032000755
-
Cyclic scheduling with time window constraints
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=1042-296X&vol= 14&iss=1&firstpage=144 [CSA]
-
Chen, H. and Chu, C. and Proth, J. (1998) Cyclic scheduling with time window constraints IEEE Transactions on Robotics and Automation, 14(1), pp. 144-152. http://dx.doi.org/10.1109%2F70.660860 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=1042-296X&vol=14&iss= 1&firstpage=144 [CSA]
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, Issue.1
, pp. 144-152
-
-
Chen, H.1
Chu, C.2
Proth, J.3
-
7
-
-
0034367676
-
Cyclic scheduling in robotic flowshops
-
[CSA]
-
Crama, Y. and Kats, V. and Van de Klundert, J. and Levner, E. (2000) Cyclic scheduling in robotic flowshops Annals of Operations Research: Mathematics of Industrial Systems, 96, pp. 97-124. http://www.csa.com/ htbin/linkabst.cgi?issn=&vol=96&iss=1&firstpage=97 [CSA]
-
(2000)
Annals of Operations Research: Mathematics of Industrial Systems
, vol.96
, pp. 97-124
-
-
Crama, Y.1
Kats, V.2
Van de Klundert, J.3
Levner, E.4
-
8
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
[CSA]
-
Crama, Y. and Van de Klundert, J. (1997) Cyclic scheduling of identical parts in a robotic cell Operations Research, 6, pp. 952-965. http://www.csa.com/htbin/linkabst.cgi?issn=0030-364X&vol=6&iss= &firstpage=952 [CSA]
-
(1997)
Operations Research
, vol.6
, pp. 952-965
-
-
Crama, Y.1
Van de Klundert, J.2
-
9
-
-
0002604088
-
Cyclic scheduling in 3-machine robotic flowshops
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=1094-6136&vol= 2&iss=&firstpage=35 [CSA]
-
Crama, Y. and Van de Klundert, J. (1999) Cyclic scheduling in 3-machine robotic flowshops Journal of Scheduling, 2, pp. 35-54. http://dx.doi.org/ 10.1002%2F%28SICI%291099-1425%28199901%2F02%292%3A1%3C35%3A%3AAID-JOS15% 3E3.0.CO%3B2-J [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=1094 -6136&vol=2&iss=&firstpage=35 [CSA]
-
(1999)
Journal of Scheduling
, vol.2
, pp. 35-54
-
-
Crama, Y.1
Van de Klundert, J.2
-
10
-
-
28244489538
-
Dominance of cyclic solutions and some open problems in scheduling bufferless robotic cells
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0036-1445&vol= 47&iss=4&firstpage=709 [CSA]
-
Dawande, M. and Geismar, N. and Sethi, S. (2005) Dominance of cyclic solutions and some open problems in scheduling bufferless robotic cells SIAM Review, 47(4), pp. 709-721. http://dx.doi.org/ 10.1137%2FS003614450444138X [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0036-1445&vol=47&iss=4&firstpage=709 [CSA]
-
(2005)
SIAM Review
, vol.47
, Issue.4
, pp. 709-721
-
-
Dawande, M.1
Geismar, N.2
Sethi, S.3
-
11
-
-
23944522312
-
Sequencing and scheduling in robotics cells: Recent developments
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=1094-6136&vol= 8&iss=5&firstpage=387 [CSA]
-
Dawande, M. and Geismar, H. and Sethi, S. and Sriskandarajah, C. (2005) Sequencing and scheduling in robotics cells: Recent developments Journal of Scheduling, 8(5), pp. 387-426. http://dx.doi.org/ 10.1007%2Fs10951-005-2861-9 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=1094-6136&vol=8&iss=5&firstpage=387 [CSA]
-
(2005)
Journal of Scheduling
, vol.8
, Issue.5
, pp. 387-426
-
-
Dawande, M.1
Geismar, H.2
Sethi, S.3
Sriskandarajah, C.4
-
12
-
-
0036769403
-
On throughput maximization in constant travel-time robotic cells
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=&vol=4&iss= 5&firstpage=296 [CSA]
-
Dawande, M. and Sriskandarajah, C. and Sethi, S. (2002) On throughput maximization in constant travel-time robotic cells Manufacturing Service Operations Management, 4(4), pp. 296-312. http://dx.doi.org/ 10.1287%2Fmsom.4.4.296.5731 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=&vol=4&iss=5&firstpage=296 [CSA]
-
(2002)
Manufacturing Service Operations Management
, vol.4
, Issue.4
, pp. 296-312
-
-
Dawande, M.1
Sriskandarajah, C.2
Sethi, S.3
-
13
-
-
4043145060
-
Robotic cells with parallel machines: Throughput maximization in constant travel-time cells
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=1094-6136&vol= 7&iss=&firstpage=375 [CSA]
-
Geismar, H. and Dawande, M. and Sriskandarajah, C. (2004) Robotic cells with parallel machines: Throughput maximization in constant travel-time cells Journal of Scheduling, 7, pp. 375-395. http://dx.doi.org/ 10.1023%2FB%3AJOSH.0000036861.28456.5d [CROSSREF] http://www.csa.com/ htbin/linkabst.cgi?issn=1094-6136&vol=7&iss=&firstpage=375 [CSA]
-
(2004)
Journal of Scheduling
, vol.7
, pp. 375-395
-
-
Geismar, H.1
Dawande, M.2
Sriskandarajah, C.3
-
14
-
-
9644308134
-
Approximation algorithms for k-unit cyclic solutions in robotic cells
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0377-2217&vol= 162&iss=&firstpage=291 [CSA]
-
Geismar, H. and Dawande, M. and Sriskandarajah, C. (2005) Approximation algorithms for k-unit cyclic solutions in robotic cells European Journal of Operational Research, 162, pp. 291-309. http://dx.doi.org/ 10.1016%2Fj.ejor.2003.09.013 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0377-2217&vol=162&iss=&firstpage=291 [CSA]
-
(2005)
European Journal of Operational Research
, vol.162
, pp. 291-309
-
-
Geismar, H.1
Dawande, M.2
Sriskandarajah, C.3
-
15
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
[CSA]
-
Hall, N. and Sriskandarajah, C. (1996) A survey of machine scheduling problems with blocking and no-wait in process Operations Research, 44(3), pp. 510-525. http://www.csa.com/htbin/linkabst.cgi?issn= 0030-364X&vol=44&iss=3&firstpage=510 [CSA]
-
(1996)
Operations Research
, vol.44
, Issue.3
, pp. 510-525
-
-
Hall, N.1
Sriskandarajah, C.2
-
16
-
-
0033727025
-
Evaluating the impact of process changes on cluster tool performance
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0894-6507&vol= 13&iss=&firstpage=181 [CSA]
-
Herrmann, J. and Chandrasekaran, N. and Conaghan, B. and Nguyen, M. and Rubloff, G. and Shi, R. (2000) Evaluating the impact of process changes on cluster tool performance IEEE Transactions on Semiconductor Manufacturing, 13, pp. 181-192. http://dx.doi.org/10.1109%2F66.843634 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0894-6507&vol= 13&iss=&firstpage=181 [CSA]
-
(2000)
IEEE Transactions on Semiconductor Manufacturing
, vol.13
, pp. 181-192
-
-
Herrmann, J.1
Chandrasekaran, N.2
Conaghan, B.3
Nguyen, M.4
Rubloff, G.5
Shi, R.6
-
17
-
-
0028396353
-
Determining optimal cyclic hoist schedules in a single-hoist electroplating line
-
[CSA]
-
Lei, L. and Wang, T. (1994) Determining optimal cyclic hoist schedules in a single-hoist electroplating line IIE Transactions, 26(2), pp. 25-33. http://www.csa.com/htbin/linkabst.cgi?issn=0740-817X&vol= 26&iss=2&firstpage=25 [CSA]
-
(1994)
IIE Transactions
, vol.26
, Issue.2
, pp. 25-33
-
-
Lei, L.1
Wang, T.2
-
18
-
-
0031095268
-
An improved algorithm for cyclic flowshop scheduling in a robotic cell
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0377-2217&vol= 97&iss=&firstpage=500 [CSA]
-
Levner, E. and Kats, V. and Levit, V. (1997) An improved algorithm for cyclic flowshop scheduling in a robotic cell European Journal of Operational Research, 97, pp. 500-508. http://dx.doi.org/ 10.1016%2FS0377-2217%2896%2900272-X [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0377-2217&vol=97&iss=&firstpage=500 [CSA]
-
(1997)
European Journal of Operational Research
, vol.97
, pp. 500-508
-
-
Levner, E.1
Kats, V.2
Levit, V.3
-
20
-
-
0000222016
-
Sequencing of parts and robot moves in a robotic cell
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0920-6299&vol= 4&iss=&firstpage=331 [CSA]
-
Sethi, S. and Sriskandarajah, C. and Sorger, G. and Blazewicz, J. and Kubiak, W. (1992) Sequencing of parts and robot moves in a robotic cell International Journal of Flexible Manufacturing Systems, 4, pp. 331-358. http://dx.doi.org/10.1007%2FBF01324886 [CROSSREF] http://www.csa.com/ htbin/linkabst.cgi?issn=0920-6299&vol=4&iss=&firstpage=331 [CSA]
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 331-358
-
-
Sethi, S.1
Sriskandarajah, C.2
Sorger, G.3
Blazewiez, J.4
Kubiak, W.5
|