-
1
-
-
0030125115
-
Optimal shift scheduling with multiple break windows
-
Aykin, T. (1996). " Optimal shift scheduling with multiple break windows.. " Manage. Sci., 42 (4), 591-602.
-
(1996)
Manage. Sci.
, vol.42
, Issue.4
, pp. 591-602
-
-
Aykin, T.1
-
3
-
-
9344245047
-
-
GAMS Development Corporation, Washington, D.C.
-
Brooke, A., Kendrick, D., Meeraus, A., and Raman, R. (1998). GAMS: A user's guide. GAMS Development Corporation, Washington, D.C.
-
(1998)
GAMS: A User's Guide.
-
-
Brooke, A.1
Kendrick, D.2
Meeraus, A.3
Raman, R.4
-
5
-
-
0032207685
-
Multiskilled labor utilization strategies in construction
-
Burleson, R., Haas, C., Tucker, R., and Stanley, A. (1998). " Multiskilled labor utilization strategies in construction.. " J. Constr. Eng. Manage., 124 (6), 480-489.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 480-489
-
-
Burleson, R.1
Haas, C.2
Tucker, R.3
Stanley, A.4
-
6
-
-
0009973347
-
-
Business Roundtable (BRT).
-
Business Roundtable (BRT). (1983). " More construction for the money.. " Construction Industry Cost Effectiveness Project, Summary Rep., The Business Roundtable, Houston.
-
(1983)
More Construction for the Money
-
-
-
7
-
-
0032656506
-
Cross-utilization of workers whose capabilities differ
-
Campbell, G. M. (1999). " Cross-utilization of workers whose capabilities differ.. " Manage. Sci., 45 (5), 722-732.
-
(1999)
Manage. Sci.
, vol.45
, Issue.5
, pp. 722-732
-
-
Campbell, G.M.1
-
9
-
-
33750095142
-
-
Construction Users Roundtable (CURT).
-
Construction Users Roundtable (CURT). (1954). " CURT work force development survey results.. " The Construction User Round Table, Cincinnati.
-
(1954)
CURT Work Force Development Survey Results
-
-
-
10
-
-
0000722156
-
A comment on Edie's traffic delays at toll booths
-
Dantzig, G. B. (1954). " A comment on Edie's traffic delays at toll booths.. " J. Oper. Res. Soc. Am., 2 (3), 339-341.
-
(1954)
J. Oper. Res. Soc. Am.
, vol.2
, Issue.3
, pp. 339-341
-
-
Dantzig, G.B.1
-
11
-
-
0000722157
-
Traffic delays at toll booths
-
Edie, L. C. (1954). " Traffic delays at toll booths.. " J. Oper. Res. Soc. Am., 2 (2), 107-138.
-
(1954)
J. Oper. Res. Soc. Am.
, vol.2
, Issue.2
, pp. 107-138
-
-
Edie, L.C.1
-
12
-
-
0038279149
-
Construction skills training for the next millenium
-
Gann, D., and Senker, D. (1998). " Construction skills training for the next millenium.. " Constr. Manage. Econom., 16, 569-580.
-
(1998)
Constr. Manage. Econom.
, vol.16
, pp. 569-580
-
-
Gann, D.1
Senker, D.2
-
13
-
-
84859681642
-
-
General Algebraic Modeling System (GAMS).
-
General Algebraic Modeling System (GAMS). (2004). " Sales: Commercial price list.. " 〈 http://www.gams.com/sales/commercialp.htm 〉 (Dec., 2004).
-
(2004)
Sales: Commercial Price List
-
-
-
14
-
-
3242662050
-
Assignment and allocation optimization of a partially multiskilled workforce
-
Gomar, J., Haas, C. T., and Morton, D. P. (2002). " Assignment and allocation optimization of a partially multiskilled workforce.. " J. Constr. Eng. Manage., 128 (2), 103-109.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.2
, pp. 103-109
-
-
Gomar, J.1
Haas, C.T.2
Morton, D.P.3
-
15
-
-
4143072349
-
UK construction skills shortage response strategies and an analysis of industry perceptions
-
Mackenzie, S., Kilpatrick, A. R., and Akintoye, A. (2000). " UK construction skills shortage response strategies and an analysis of industry perceptions.. " Constr. Manage. Econom., 18, 853-862.
-
(2000)
Constr. Manage. Econom.
, vol.18
, pp. 853-862
-
-
MacKenzie, S.1
Kilpatrick, A.R.2
Akintoye, A.3
-
16
-
-
0029271523
-
Job characteristics: Union-nonunion differences
-
Maloney, W., and McFillen, J. (1995). " Job characteristics: Union-nonunion differences.. " J. of Construction Engineering and Project Management, ASCE, 121 (1), 43-54.
-
(1995)
J. of Construction Engineering and Project Management
, vol.121
, Issue.1
, pp. 43-54
-
-
Maloney, W.1
McFillen, J.2
-
18
-
-
0029634840
-
Technical analysis of employment potential of a national public works programme
-
Philips, S. D., McCutcheon, R. T., Emery, S. J., Little, R., and Kwesiga, M. B. (1995). " Technical analysis of employment potential of a national public works programme.. " J. of the South African Institution of Civil Engineers, 37 (3), 18-24.
-
(1995)
J. of the South African Institution of Civil Engineers
, vol.37
, Issue.3
, pp. 18-24
-
-
Philips, S.D.1
McCutcheon, R.T.2
Emery, S.J.3
Little, R.4
Kwesiga, M.B.5
-
20
-
-
1642518589
-
Agent-based modeling and simulation in construction
-
S.Chick, P. J.Sanchez, D.Ferrin, and D. J.Morris, eds., New Orleans.
-
Sawhney, A., Walsh, K., and Mulky, A. (2003). " Agent-based modeling and simulation in construction.. " Proc., 2003 Winter Simulation Conf., S. Chick, P. J. Sanchez, D. Ferrin, and, D. J. Morris, eds., New Orleans.
-
(2003)
Proc., 2003 Winter Simulation Conf.
-
-
Sawhney, A.1
Walsh, K.2
Mulky, A.3
-
22
-
-
0028531966
-
Mathematical models for developing a flexible workforce
-
Stewart, B. D., Webster, D. B., Ahmad, S., and Matson, J. O. (1994). " Mathematical models for developing a flexible workforce.. " J. of Production Economics, 36, 243-254.
-
(1994)
J. of Production Economics
, vol.36
, pp. 243-254
-
-
Stewart, B.D.1
Webster, D.B.2
Ahmad, S.3
Matson, J.O.4
-
24
-
-
33750121257
-
-
3, Center for Construction Industry Studies, Univ. of Texas at Austin, Austin, Tex.
-
Tucker, R. L., Haas, C. T., Glover, R. W., Alemany, C., Carey, L. A., Rodriguez, A., and Shields, D. (1999). " Key workforce challenges facing the American construction industry: An interim assessment.. " Rep. No. 3, Center for Construction Industry Studies, Univ. of Texas at Austin, Austin, Tex.
-
(1999)
Key Workforce Challenges Facing the American Construction Industry: An Interim Assessment
-
-
Tucker, R.L.1
Haas, C.T.2
Glover, R.W.3
Alemany, C.4
Carey, L.A.5
Rodriguez, A.6
Shields, D.7
|