메뉴 건너뛰기




Volumn 12, Issue 4, 1998, Pages 149-155

Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION LANGUAGES; MATHEMATICAL MODELS; MATHEMATICAL PROGRAMMING; PRODUCTION ENGINEERING; SCHEDULING; STRATEGIC PLANNING;

EID: 0032443047     PISSN: 09208119     EISSN: None     Source Type: Trade Journal    
DOI: 10.1080/09208118908944038     Document Type: Article
Times cited : (46)

References (15)
  • 1
    • 0344679948 scopus 로고    scopus 로고
    • Personal communication, Combinatorics, Bently, SWA, Australia
    • Jim Butler, personal communication, Combinatorics, Bently, SWA, Australia.
    • Butler, J.1
  • 2
    • 0025573858 scopus 로고
    • An application of integer programming and simulation to production planning for a stratiform ore body
    • Chanda, E.C.K., An application of integer programming and simulation to production planning for a stratiform ore body, Mining Science and Tech., v. 11, pp. 165-172, 1990a.
    • (1990) Mining Science and Tech. , vol.11 , pp. 165-172
    • Chanda, E.C.K.1
  • 3
    • 0025600653 scopus 로고
    • An application of goal programming to production planning in the crushed stone industry
    • Chanda, E.C.K., An application of goal programming to production planning in the crushed stone industry, Int. J. Surface Mining, Reclamation and Environment, v. 4, (1990b), 125-129.
    • (1990) Int. J. Surface Mining, Reclamation and Environment , vol.4 , pp. 125-129
    • Chanda, E.C.K.1
  • 4
    • 0000688427 scopus 로고
    • Optimal blending of mine production using goal programming and interactive graphics systems
    • Chanda, E.C.K. and Dagdelen, K., Optimal blending of mine production using goal programming and interactive graphics systems, Int. J. Surface Mining, Reclamation and Environment, v. 9, (1995), 203-208.
    • (1995) Int. J. Surface Mining, Reclamation and Environment , vol.9 , pp. 203-208
    • Chanda, E.C.K.1    Dagdelen, K.2
  • 5
    • 0022100066 scopus 로고
    • Computer-aided short-term mine planning
    • Franklin, P.J., Computer-aided short-term mine planning, CIM Bull., v. 78, n. 879, (1985), 49-52.
    • (1985) CIM Bull. , vol.78 , Issue.879 , pp. 49-52
    • Franklin, P.J.1
  • 6
    • 0023399309 scopus 로고
    • Optimization of short- and long-range production scheduling
    • Fytas, K., Pelley, C. and Calder, P., Optimization of short- and long-range production scheduling, CIM Bull., v. 80, n. 904, (1987), 55-61.
    • (1987) CIM Bull. , vol.80 , Issue.904 , pp. 55-61
    • Fytas, K.1    Pelley, C.2    Calder, P.3
  • 7
    • 0012299968 scopus 로고
    • Heuristic approaches for mine planning and production scheduling
    • Gershon, M., Heuristic approaches for mine planning and production scheduling, Int. J. Mining and Geological Eng., v. 5, (1987), 1-13.
    • (1987) Int. J. Mining and Geological Eng. , vol.5 , pp. 1-13
    • Gershon, M.1
  • 8
    • 0345110870 scopus 로고
    • Short term mine planning and grade control practice at the Mesquite mine
    • Feb.
    • Grady, L., Holm, V., Mitts, R. and Brumit, P., Short term mine planning and grade control practice at the Mesquite mine, Mining Eng., v. 42, Feb. 1990, 187-191.
    • (1990) Mining Eng. , vol.42 , pp. 187-191
    • Grady, L.1    Holm, V.2    Mitts, R.3    Brumit, P.4
  • 10
    • 0024982760 scopus 로고
    • Mine activity and resource scheduling with the use of three-dimensional component modelling
    • Holding, S.W., Stokes, M.A., Mine activity and resource scheduling with the use of three-dimensional component modelling, Trans. Sec. A, Mining Ind., v. 99, n. A53, (1990).
    • (1990) Trans. Sec. A, Mining Ind. , vol.99 , Issue.A53
    • Holding, S.W.1    Stokes, M.A.2
  • 11
    • 0030084094 scopus 로고    scopus 로고
    • Scheduling using optimization and blending
    • Lapworth, A.D., Scheduling using optimization and blending, The Mining Magazine, v.174, n.2 (1996), 105-106.
    • (1996) The Mining Magazine , vol.174 , Issue.2 , pp. 105-106
    • Lapworth, A.D.1
  • 13
    • 0029210149 scopus 로고
    • (1994) "mine production scheduling for optimization of plant recovery in surface phosphate operations,"
    • Smith, M. L., and Tao, W. Y. (1994) "Mine Production Scheduling for Optimization of Plant Recovery in Surface Phosphate Operations," International Journal of Surface Mining, v.9, 1994, 41-46
    • (1994) International Journal of Surface Mining , vol.9 , pp. 41-46
    • Smith, M.L.1    Tao, W.Y.2
  • 15
    • 0038055258 scopus 로고    scopus 로고
    • Using MILP to optimize period fix costs in complex mine sequencing and scheduling problems
    • ed. Ramani, R.V., Littleton, Co. , SME, Penn. State, Univ. Park, PA, Sept. 16-20
    • th Proc. Appl. Comp. & Oper. Res. in Mineral Ind. (APCOM), ed. Ramani, R.V., Littleton, Co. , SME, (1996), Penn. State, Univ. Park, PA, Sept. 16-20.
    • (1996) th Proc. Appl. Comp. & Oper. Res. in Mineral Ind. (APCOM)
    • Winkler, B.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.