메뉴 건너뛰기




Volumn 1, Issue 1, 2006, Pages 123-140

Delivering green buildings: Process improvements for sustainable construction

Author keywords

High performance; Improvement; Model; Process; Sustainable building

Indexed keywords


EID: 33646746735     PISSN: 15526100     EISSN: 19434618     Source Type: Journal    
DOI: 10.3992/jgb.1.1.123     Document Type: Article
Times cited : (86)

References (37)
  • 1
    • 69949101125 scopus 로고    scopus 로고
    • Lean project delivery system
    • Lean Construction Institute, Ketchum, ID
    • Ballard, G. (2000). ''Lean project delivery system.'' LCI White Paper #8, Lean Construction Institute, Ketchum, ID.
    • (2000) LCI White Paper #8
    • Ballard, G.1
  • 2
    • 77953222466 scopus 로고    scopus 로고
    • Implementation Results of the Sustainable Construction Field Guide at the Pentagon
    • Report to the Pentagon Renovation Program Arlington, VA
    • Dahl, P. K. and Horman, M. J. (2004). ''Implementation Results of the Sustainable Construction Field Guide at the Pentagon,'' Report to the Pentagon Renovation Program, Arlington, VA.
    • (2004)
    • Dahl, P.K.1    Horman, M.J.2
  • 3
    • 27644487287 scopus 로고    scopus 로고
    • The Design/ Build/Operate Project Delivery Method: A How to Seminar for Industries and Municipalities
    • Boston, Massachusetts
    • Doran, P., Koutalidis, C., and Lau, P. (2000). ''The Design/Build/Operate Project Delivery Method: A How to Seminar for Industries and Municipalities.'' Enviro Expo 2000, Boston, Massachusetts.
    • (2000) Enviro Expo 2000
    • Doran, P.1    Koutalidis, C.2    Lau, P.3
  • 4
    • 63049111426 scopus 로고    scopus 로고
    • GSA LEED cost study: Final report
    • GSA. GSA, Washington, DC
    • GSA. (2004). ''GSA LEED cost study: final report.'' Contract No. GS-11P-99-MAD-0565, GSA, Washington, DC.
    • (2004) Contract No. GS-11P-99-MAD-0565
  • 5
    • 77953206343 scopus 로고    scopus 로고
    • Scalable Characteristics of High Performance Green Delivery
    • April 9, University Park, PA
    • Harding, N. (2005). ''Scalable Characteristics of High Performance Green Delivery.'' Mindbend Symposium, April 9, University Park, PA.
    • (2005) Mindbend Symposium
    • Harding, N.1
  • 6
    • 12344255065 scopus 로고    scopus 로고
    • Quantifying levels of wasted time in construction with meta-analysis
    • Horman, M.J. and Kenley, R. (2005). ''Quantifying levels of wasted time in construction with meta-analysis.'' Journal of Construction Engineering and Management, 131(1): 52-61.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 52-61
    • Horman, M.J.1    Kenley, R.2
  • 10
    • 33748777879 scopus 로고    scopus 로고
    • Delivering sustainability: Mapping Toyota Motor Sales' Corporate Facility Delivery Process
    • M.S. Thesis, Architectural Engineering, The Pennsylvania State University, University Park, PA
    • Lapinski, A. R. (2005). ''Delivering sustainability: Mapping Toyota Motor Sales' corporate facility delivery process.'' M.S. Thesis, Architectural Engineering, The Pennsylvania State University, University Park, PA.
    • (2005)
    • Lapinski, A.R.1
  • 11
    • 77953187226 scopus 로고    scopus 로고
    • High Performance Building Project Delivery
    • April 9, University Park, PA
    • Korkmaz, S. (2005). ''High Performance Building Project Delivery.'' Mindbend Symposium, April 9, University Park, PA.
    • (2005) Mindbend Symposium
    • Korkmaz, S.1
  • 13
    • 77953225746 scopus 로고    scopus 로고
    • LEED registered project list
    • LEED. (Jun, 24, 2005)
    • LEED. (2004). ''LEED registered project list.'' (Jun, 24, 2005).
    • (2004)
  • 16
    • 77953199652 scopus 로고    scopus 로고
    • High Performance Building Design Process Model
    • April 5-7, San Diego, CA
    • Magent, C. S., Riley, D. R. and Horman, M. J. (2005). ''High Performance Building Design Process Model.'' ASCE Construction Research Congress, April 5-7, San Diego, CA: 424-428.
    • (2005) ASCE Construction Research Congress , pp. 424-428
    • Magent, C.S.1    Riley, D.R.2    Horman, M.J.3
  • 18
    • 84873160112 scopus 로고    scopus 로고
    • National Institute of Building Sciences. (2005), (Jun. 23, 2005)
    • National Institute of Building Sciences. (2005). ''Whole Building Design Guide.'' http://www.wbdg.org/ (Jun. 23, 2005).
    • Whole Building Design Guide
  • 20
    • 77953207667 scopus 로고    scopus 로고
    • The Alignment of Sustainability and Constructability: A Continuous Value Enhancement Process
    • Ph.D. Dissertation, Architectural Engineering, The Pennsylvania State University, University Park, PA
    • Pulaski, M. H. (2005). ''The Alignment of Sustainability and Constructability: A Continuous Value Enhancement Process,'' Ph.D. Dissertation, Architectural Engineering, The Pennsylvania State University, University Park, PA.
    • (2005)
    • Pulaski, M.H.1
  • 25
    • 27644533025 scopus 로고    scopus 로고
    • Sustainable metrics: A design process model for high performance buildings
    • Toronto, CA
    • Riley, D., Magent, C. and Horman, M. (2004). ''Sustainable metrics: a design process model for high performance buildings.'' CIB World Building Congress, Toronto, CA.
    • (2004) CIB World Building Congress
    • Riley, D.1    Magent, C.2    Horman, M.3
  • 27
    • 69949089284 scopus 로고    scopus 로고
    • Lean and green: The role of design-build mechanical competencies in the design and construction of green buildings
    • April 5-7. San Diego, CA
    • Riley, D. R., Sanvido, V. E., Horman, M. J., McLaughlin, M., and Kerr, D. (2005). ''Lean and green: the role of design-build mechanical competencies in the design and construction of green buildings.'' ASCE Construction Research Congress, April 57, San Diego, CA: 116-120.
    • (2005) ASCE Construction Research Congress , pp. 116-120
    • Riley, D.R.1    Sanvido, V.E.2    Horman, M.J.3    McLaughlin, M.4    Kerr, D.5
  • 30
    • 0010075840 scopus 로고    scopus 로고
    • Project delivery systems: CM at risk, design-build, design-bid-build
    • CII, Austin, TX
    • Sanvido, V. E., and Konchar, M. D. (1997). ''Project delivery systems: CM at risk, design-build, design-bid-build.'' Technical Report No. 133, CII, Austin, TX.
    • (1997) Technical Report No. 133
    • Sanvido, V.E.1    Konchar, M.D.2
  • 33
    • 2442477648 scopus 로고    scopus 로고
    • Learning to lead at Toyota
    • May
    • Spear, S. (2004). ''Learning to lead at Toyota.'' Harvard Business Review, May: 78-86.
    • (2004) Harvard Business Review , pp. 78-86
    • Spear, S.1
  • 34
    • 0002623534 scopus 로고    scopus 로고
    • Decoding the DNA of the Toyota production system
    • September-October
    • Spear, S. and Bowen, K. (1999). ''Decoding the DNA of the Toyota production system.'' Harvard Business Review, September-October: 96-106.
    • (1999) Harvard Business Review , pp. 96-106
    • Spear, S.1    Bowen, K.2
  • 35
    • 34250899663 scopus 로고    scopus 로고
    • High performance buildings
    • U.S. DOE. (Dec. 28, 2004)
    • U.S. DOE. (2003). ''High performance buildings.'' (Dec. 28, 2004).
    • (2003)
  • 36
    • 27644597747 scopus 로고    scopus 로고
    • Sustainable Federal Facilities: A guide to integrating value engineering, life cycle costing, and sustainable development
    • U.S. Federal Facilities Council, National Academy Press. Washington, DC
    • U.S. Federal Facilities Council. (2001). ''Sustainable Federal Facilities: a guide to integrating value engineering, life cycle costing, and sustainable development.'' Federal Facilities Technical Report No. 142. National Academy Press. Washington, DC.
    • (2001) Federal Facilities Technical Report No. 142


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.