-
1
-
-
0003520524
-
A survey of scheduling in multiprogrammed parallel systems
-
IBM Research Division, October
-
D. G. Feitelson. A survey of scheduling in multiprogrammed parallel systems. Technical Report RC 19790, IBM Research Division, October 1994.
-
(1994)
Technical Report
, vol.RC 19790
-
-
Feitelson, D.G.1
-
3
-
-
84867470373
-
-
Parallel Workload Archive. www.cs.huji.ac.il/labs/parallel/workload.
-
-
-
-
4
-
-
84867442107
-
-
IBM LoadLeveler. www-1.ibm.com/servers/eserver/ecatalog/us/software/4051.html.
-
-
-
-
6
-
-
32844466274
-
Attacking the bottlenecks in backfilling schedulers
-
P. Keleher, D. Zotkin, and D. Perkovic. Attacking the bottlenecks in backfilling schedulers. Cluster Computing: The Journal of Networks, Software Tools and Applications, 3(4):245-254, 2000.
-
(2000)
Cluster Computing: The Journal of Networks, Software Tools and Applications
, vol.3
, Issue.4
, pp. 245-254
-
-
Keleher, P.1
Zotkin, D.2
Perkovic, D.3
-
7
-
-
84974728067
-
Multiple-queue backfilling scheduling with priorities and reservations for parallel systems
-
D. G. Feitelson, L. Rudolph, and U. Schwiegelshohn, editors, Springer Verlag, LNCS 2537
-
B. Lawson and E. Smirni. Multiple-queue backfilling scheduling with priorities and reservations for parallel systems. In D. G. Feitelson, L. Rudolph, and U. Schwiegelshohn, editors, Job Scheduling Strategies for Parallel Processing, pages 72-87. Springer Verlag, 2002. LNCS 2537.
-
(2002)
Job Scheduling Strategies for Parallel Processing
, pp. 72-87
-
-
Lawson, B.1
Smirni, E.2
-
8
-
-
33746303842
-
Self-adaptive scheduler parameterization
-
University of Richmond, Richmond, VA, January
-
B. Lawson and E. Smirni. Self-adaptive scheduler parameterization. Technical Report TR-05-01, University of Richmond, Richmond, VA, January 2005.
-
(2005)
Technical Report
, vol.TR-05-01
-
-
Lawson, B.1
Smirni, E.2
-
9
-
-
33645445462
-
Self-adapting backfilling scheduling for parallel systems
-
Vancouver, B.C., August
-
B. Lawson, E. Smirni, and D. Puiu. Self-adapting backfilling scheduling for parallel systems. In Proceedings of the 2002 International Conference on Parallel Processing (ICPP 2002), pages 583-592, Vancouver, B.C., August 2002.
-
(2002)
Proceedings of the 2002 International Conference on Parallel Processing (ICPP 2002)
, pp. 583-592
-
-
Lawson, B.1
Smirni, E.2
Puiu, D.3
-
12
-
-
0035363047
-
Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfilling
-
June
-
A. Mualem and D. G. Feitelson. Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfilling. IEEE Transactions on Parallel and Distributed Systems, 12(6):529-543, June 2001.
-
(2001)
IEEE Transactions on Parallel and Distributed Systems
, vol.12
, Issue.6
, pp. 529-543
-
-
Mualem, A.1
Feitelson, D.G.2
-
13
-
-
84867442108
-
-
Portable Batch System, www.openpbs.org.
-
-
-
-
15
-
-
0032630744
-
Supporting priorities and improving utilization of the IBM SP2 scheduler using slack-based backfilling
-
April
-
D. Talby and D. Feitelson. Supporting priorities and improving utilization of the IBM SP2 scheduler using slack-based backfilling. In Proceedings of the 13th International Parallel Processing Symposium, pages 513-517, April 1999.
-
(1999)
Proceedings of the 13th International Parallel Processing Symposium
, pp. 513-517
-
-
Talby, D.1
Feitelson, D.2
-
16
-
-
0038639099
-
An integrated approach to parallel scheduling using gang-scheduling, backfilling, and migration
-
Y. Zhang, H. Franke, J. Moreira, and A. Sivasubramaniam. An integrated approach to parallel scheduling using gang-scheduling, backfilling, and migration. IEEE Trans. Parallel Distrib. Syst., 14(3):236-247, 2003.
-
(2003)
IEEE Trans. Parallel Distrib. Syst.
, vol.14
, Issue.3
, pp. 236-247
-
-
Zhang, Y.1
Franke, H.2
Moreira, J.3
Sivasubramaniam, A.4
|