메뉴 건너뛰기




Volumn 2002-January, Issue , 2002, Pages 583-592

Self-adapting backfilling scheduling for parallel systems

Author keywords

Computer science; Condition monitoring; Delay; Educational institutions; Fluctuations; Mathematics; Parallel processing; Performance analysis; Processor scheduling; Resource management

Indexed keywords

COMPUTER RESOURCE MANAGEMENT; COMPUTER SCIENCE; CONDITION MONITORING; MATHEMATICAL TECHNIQUES; PARALLEL PROCESSING SYSTEMS; QUEUEING THEORY;

EID: 33645445462     PISSN: 01903918     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICPP.2002.1040916     Document Type: Conference Paper
Times cited : (32)

References (13)
  • 2
    • 84896875210 scopus 로고    scopus 로고
    • Metrics for parallel job scheduling and their convergence
    • D. G. Feitelson and L. Rudolph, editors, Proceedings of the 7th Workshop on Job Scheduling Strategies for Parallel Processing, Springer-Verlag
    • D. G. Feitelson. Metrics for parallel job scheduling and their convergence. In D. G. Feitelson and L. Rudolph, editors, Proceedings of the 7th Workshop on Job Scheduling Strategies for Parallel Processing, volume 2221 of Lecture Notes in Computer Science, pages 188-206. Springer-Verlag, 2001.
    • (2001) Lecture Notes in Computer Science , vol.2221 , pp. 188-206
    • Feitelson, D.G.1
  • 8
    • 0035363047 scopus 로고    scopus 로고
    • Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfilling
    • June
    • A. Mu'alem and D. G. Feitelson. Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfilling. IEEE Transactions on Parallel and Distributed Systems, 12(6):529-543, June 2001.
    • (2001) IEEE Transactions on Parallel and Distributed Systems , vol.12 , Issue.6 , pp. 529-543
    • Mu'alem, A.1    Feitelson, D.G.2
  • 13
    • 0032630744 scopus 로고    scopus 로고
    • Supporting priorities and improving utilization of the IBM SP2 scheduler using slack-based backfilling
    • April
    • D. Talby and D. G. Feitelson. Supporting priorities and improving utilization of the IBM SP2 scheduler using slack-based backfilling. In Proceedings of the 13th International Parallel Processing Symposium, pages 513-517, April 1999.
    • (1999) Proceedings of the 13th International Parallel Processing Symposium , pp. 513-517
    • Talby, D.1    Feitelson, D.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.