메뉴 건너뛰기




Volumn 24, Issue 2, 2005, Pages 79-92

An approach using petri nets and improved heuristic search for manufacturing system scheduling

Author keywords

Flexible manufacturing systems; Heuristic search; Petri nets; Scheduling

Indexed keywords

COMPUTATIONAL TESTS; HEURISTIC SEARCH; NODE-PRUNING STRATEGY; SCHEDULING PROBLEMS;

EID: 33745764008     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0278-6125(05)80009-3     Document Type: Article
Times cited : (59)

References (26)
  • 2
    • 0037103437 scopus 로고    scopus 로고
    • Deadlock-free scheduling in flexible manufacturing systems using Petri-nets
    • Abdallah I.B., ElMaraghy H.A., and ElMekkawy T.Y. Deadlock-free scheduling in flexible manufacturing systems using Petri-nets. Int'l Journal of Production Research v40 n12 (2002) 2733-2756
    • (2002) Int'l Journal of Production Research , vol.v40 , Issue.n12 , pp. 2733-2756
    • Abdallah, I.B.1    ElMaraghy, H.A.2    ElMekkawy, T.Y.3
  • 3
    • 77957905785 scopus 로고
    • The shifting bottleneck procedure forjob shop scheduling. Management science research
    • Carnegie Mellon Univ., Pittsburgh
    • Adams J., Balas E., and Zawack D. The shifting bottleneck procedure forjob shop scheduling. Management science research. Report No. MSRR-525 (R) (1987), Carnegie Mellon Univ., Pittsburgh
    • (1987) Report No. MSRR-525 (R)
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 4
    • 0026126118 scopus 로고
    • A computational study of the job-shop scheduling problem
    • Applegate D. A computational study of the job-shop scheduling problem. ORSA Journal on Computing v3 n2 (1991) 149-156
    • (1991) ORSA Journal on Computing , vol.v3 , Issue.n2 , pp. 149-156
    • Applegate, D.1
  • 7
    • 0142165718 scopus 로고    scopus 로고
    • Efficient search of Petri nets for deadlock-free scheduling in FMS using heuristic functions
    • ElMekkawy T.Y., and ElMaraghy H.A. Efficient search of Petri nets for deadlock-free scheduling in FMS using heuristic functions. Int'l Journal of Computer Integrated Mfg. v16 n1 (2003) 14-24
    • (2003) Int'l Journal of Computer Integrated Mfg. , vol.v16 , Issue.n1 , pp. 14-24
    • ElMekkawy, T.Y.1    ElMaraghy, H.A.2
  • 8
  • 9
    • 0032596136 scopus 로고    scopus 로고
    • Job-shop scheduling - using component packing and simulated annealing approach
    • Hussain M., and Joshi S. Job-shop scheduling - using component packing and simulated annealing approach. Int'l Journal of Production Research v3 n16 (1999) 3711-3723
    • (1999) Int'l Journal of Production Research , vol.v3 , Issue.n16 , pp. 3711-3723
    • Hussain, M.1    Joshi, S.2
  • 10
    • 0032044470 scopus 로고    scopus 로고
    • A heuristic search approach using approximate solutions to Petri net state equations for scheduling flexible manufacturing systems
    • Jeng M.D., and Chen S.C. A heuristic search approach using approximate solutions to Petri net state equations for scheduling flexible manufacturing systems. Int'l Journal of Flexible Mfg. Systems v10 n2 (1998) 139-162
    • (1998) Int'l Journal of Flexible Mfg. Systems , vol.v10 , Issue.n2 , pp. 139-162
    • Jeng, M.D.1    Chen, S.C.2
  • 12
    • 0028413979 scopus 로고
    • Scheduling flexible manufacturing systems using Petri nets and heuristic search
    • Lee D.Y., and DiCesare F. Scheduling flexible manufacturing systems using Petri nets and heuristic search. IEEE Trans. on Robotics and Automation v10 n2 (1994) 123-131
    • (1994) IEEE Trans. on Robotics and Automation , vol.v10 , Issue.n2 , pp. 123-131
    • Lee, D.Y.1    DiCesare, F.2
  • 13
    • 84994414032 scopus 로고    scopus 로고
    • Hierarchical Petri net modeling for system dynamics and control of manufacturing systems
    • Middlesborough, UK, June 25-27, 1997
    • Liu C., Ma Y., and Odrey N. Hierarchical Petri net modeling for system dynamics and control of manufacturing systems. Proc. of 7th FAIM Int'l Conf. Middlesborough, UK, June 25-27, 1997 (1997)
    • (1997) Proc. of 7th FAIM Int'l Conf.
    • Liu, C.1    Ma, Y.2    Odrey, N.3
  • 14
    • 17944366694 scopus 로고    scopus 로고
    • Petri net models and heuristic search for scheduling of manufacturing systems: a comparative study
    • Blacksburg, VA, Aug. 3-7, 2003
    • Mejia G., and Odrey N. Petri net models and heuristic search for scheduling of manufacturing systems: a comparative study. Proc. of ICPR Conf. Blacksburg, VA, Aug. 3-7, 2003 (2003)
    • (2003) Proc. of ICPR Conf.
    • Mejia, G.1    Odrey, N.2
  • 15
    • 0030290327 scopus 로고    scopus 로고
    • Petri net models of flexible and automated manufacturing systems: a survey
    • Moore K.E., and Gupta S.M. Petri net models of flexible and automated manufacturing systems: a survey. Int'l Journal of Production Research v34 n11 (1996) 3001-3035
    • (1996) Int'l Journal of Production Research , vol.v34 , Issue.n11 , pp. 3001-3035
    • Moore, K.E.1    Gupta, S.M.2
  • 17
    • 0024645936 scopus 로고
    • Petri nets: properties, analysis and applications
    • n4
    • n4. Murata T. Petri nets: properties, analysis and applications. Proc. of the IEEE v77 (1989) 541-580
    • (1989) Proc. of the IEEE , vol.v77 , pp. 541-580
    • Murata, T.1
  • 18
    • 0004168233 scopus 로고
    • Muth J.F., and Thompson G.L. (Eds), Prentice-Hall, Englewood Cliffs, NJ
    • In: Muth J.F., and Thompson G.L. (Eds). Industrial Scheduling (1963), Prentice-Hall, Englewood Cliffs, NJ
    • (1963) Industrial Scheduling
  • 20
    • 0036131852 scopus 로고    scopus 로고
    • Integrating Petri nets and hybrid heuristic search for the scheduling of FMS
    • Reyes-Mono A., Yu H., Kelleher G., and Lloyd S. Integrating Petri nets and hybrid heuristic search for the scheduling of FMS. Computers in Industry v47 n1 (2002) 123-138
    • (2002) Computers in Industry , vol.v47 , Issue.n1 , pp. 123-138
    • Reyes-Mono, A.1    Yu, H.2    Kelleher, G.3    Lloyd, S.4
  • 23
    • 0028727015 scopus 로고
    • A Petri net based approach to modeling and scheduling for an FMS and a case study
    • Sun T., Cheng W., and Fu L. A Petri net based approach to modeling and scheduling for an FMS and a case study. IEEE Trans. on Industrial Electronics v41 n6 (1994) 593-601
    • (1994) IEEE Trans. on Industrial Electronics , vol.v41 , Issue.n6 , pp. 593-601
    • Sun, T.1    Cheng, W.2    Fu, L.3
  • 24
    • 0029709086 scopus 로고    scopus 로고
    • A hybrid heuristic search algorithm for scheduling flexible manufacturing systems
    • Minneapolis, April 1996
    • Xiong H.H., and Zhou M.C. A hybrid heuristic search algorithm for scheduling flexible manufacturing systems. Proc. of 1996 IEEE Conf. on Robotics and Automation. Minneapolis, April 1996 (1996) 2793-2797
    • (1996) Proc. of 1996 IEEE Conf. on Robotics and Automation , pp. 2793-2797
    • Xiong, H.H.1    Zhou, M.C.2
  • 25
    • 0032138965 scopus 로고    scopus 로고
    • Scheduling of semi-conductor test facility via Petri nets and hybrid heuristic search
    • Xiong H.H., and Zhou M.C. Scheduling of semi-conductor test facility via Petri nets and hybrid heuristic search. IEEE Trans. on Semiconductor Mfg. v11 n3 (1998) 384-393
    • (1998) IEEE Trans. on Semiconductor Mfg. , vol.v11 , Issue.n3 , pp. 384-393
    • Xiong, H.H.1    Zhou, M.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.