메뉴 건너뛰기




Volumn 11, Issue 3, 1998, Pages 384-393

Scheduling of semiconductor test facility via petri nets and hybrid heuristic search

Author keywords

Heuristic search; Hybrid strategy; Petri net; Scheduling; Semiconductor test

Indexed keywords

ALGORITHMS; HEURISTIC METHODS; PETRI NETS; SCHEDULING; SEMICONDUCTOR DEVICE MODELS;

EID: 0032138965     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/66.705373     Document Type: Article
Times cited : (149)

References (22)
  • 1
    • 0000165767 scopus 로고
    • An algorithm for solving the job-shop problem
    • J. Carlier and E. Pinson, "An algorithm for solving the job-shop problem," Manag. Sci., vol. 35, no. 2, pp. 164-176, 1989.
    • (1989) Manag. Sci. , vol.35 , Issue.2 , pp. 164-176
    • Carlier, J.1    Pinson, E.2
  • 3
    • 0342323208 scopus 로고    scopus 로고
    • Scheduling for IC sort and test facilities with precedence constraints via Lagrangian relaxation
    • T.-R. Chen and T. C. Hsia, "Scheduling for IC sort and test facilities with precedence constraints via Lagrangian relaxation," J. Manufact. Syst., vol. 16, no. 2, pp. 117-128, 1997.
    • (1997) J. Manufact. Syst. , vol.16 , Issue.2 , pp. 117-128
    • Chen, T.-R.1    Hsia, T.C.2
  • 4
    • 0029357906 scopus 로고
    • Scheduling for IC sort and test with preemptiveness via Lagrangian relaxation
    • Aug.
    • T.-R. Chen, T. S. Chang, C. W. Chen, and J. Kao, "Scheduling for IC sort and test with preemptiveness via Lagrangian relaxation," IEEE Trans. Syst., Man, Cybern., vol. 25, pp. 1249-1256, Aug. 1995.
    • (1995) IEEE Trans. Syst., Man, Cybern. , vol.25 , pp. 1249-1256
    • Chen, T.-R.1    Chang, T.S.2    Chen, C.W.3    Kao, J.4
  • 6
    • 0027308051 scopus 로고
    • A review of synthesis techniques for Petri nets with applications to automated manufacturing systems
    • Jan./Feb.
    • M. D. Jeng and F. DiCesare, "A review of synthesis techniques for Petri nets with applications to automated manufacturing systems," IEEE Trans. Syst., Man, Cybern., vol. 23, pp. 301-312, Jan./Feb. 1993.
    • (1993) IEEE Trans. Syst., Man, Cybern. , vol.23 , pp. 301-312
    • Jeng, M.D.1    DiCesare, F.2
  • 7
    • 0031360262 scopus 로고    scopus 로고
    • Scheduling FMS with due dates based on Petri net state equations
    • Orlando, FL, Oct. 12-15
    • M. D. Jeng, R. W. Jaw, and P. L. Hung, "Scheduling FMS with due dates based on Petri net state equations," 1997 IEEE Int. Conf. Systems, Man, and Cybernetics, Orlando, FL, Oct. 12-15, 1997, pp. 2724-2729.
    • (1997) 1997 IEEE Int. Conf. Systems, Man, and Cybernetics , pp. 2724-2729
    • Jeng, M.D.1    Jaw, R.W.2    Hung, P.L.3
  • 8
    • 0004381187 scopus 로고
    • Synthesis of place/transition nets for simulation and control of manufacturing systems
    • Zürich, Switzerland, Aug.
    • B. H. Krogh and C. L. Beck, "Synthesis of place/transition nets for simulation and control of manufacturing systems," in Proc. IFIP Symp. Large Systems, Zürich, Switzerland, Aug. 1986, pp. 1-6.
    • (1986) Proc. IFIP Symp. Large Systems , pp. 1-6
    • Krogh, B.H.1    Beck, C.L.2
  • 9
    • 0028413979 scopus 로고
    • Scheduling FMS using Petri nets and heuristic search
    • Apr.
    • D. Y. Lee and F. DiCesare, "Scheduling FMS using Petri nets and heuristic search," IEEE Trans. Robot. Automat., vol. 10, pp. 123-132, Apr. 1994.
    • (1994) IEEE Trans. Robot. Automat. , vol.10 , pp. 123-132
    • Lee, D.Y.1    DiCesare, F.2
  • 10
    • 0026898494 scopus 로고
    • Efficient algorithms for scheduling semiconductor burn-in operations
    • C. Y. Lee, R. Uzsoy, and L. A. Martin-Vega, "Efficient algorithms for scheduling semiconductor burn-in operations," Oper. Res, vol. 40, no. 4, pp. 764-795, 1992.
    • (1992) Oper. Res , vol.40 , Issue.4 , pp. 764-795
    • Lee, C.Y.1    Uzsoy, R.2    Martin-Vega, L.A.3
  • 11
    • 0027625736 scopus 로고
    • Scheduling of manufacturing systems using the Lagrangian relaxation technique
    • July
    • P. B. Luh and D. J. Hoitomt, "Scheduling of manufacturing systems using the Lagrangian relaxation technique," IEEE Trans. Automat. Contr., vol. 38, pp. 1066-1079, July 1993.
    • (1993) IEEE Trans. Automat. Contr. , vol.38 , pp. 1066-1079
    • Luh, P.B.1    Hoitomt, D.J.2
  • 12
    • 0000098618 scopus 로고
    • A Petri net approach to the modeling and analysis of flexible manufacturing systems
    • Y. Narahari and N. Viswanadham, "A Petri net approach to the modeling and analysis of flexible manufacturing systems," Annu. Oper. Res., vol. 3, pp. 449-472, 1985.
    • (1985) Annu. Oper. Res. , vol.3 , pp. 449-472
    • Narahari, Y.1    Viswanadham, N.2
  • 14
    • 0026889665 scopus 로고
    • Truncation of Petri net models for simplifying computation of optimum scheduling problems
    • L. Shen, Q. Chen, and J. Luh, "Truncation of Petri net models for simplifying computation of optimum scheduling problems," Comput. Indust., vol. 20, pp. 25-43, 1992.
    • (1992) Comput. Indust. , vol.20 , pp. 25-43
    • Shen, L.1    Chen, Q.2    Luh, J.3
  • 15
    • 0028727015 scopus 로고
    • A Petri net based approach to modeling and scheduling for an FMS and a Case Study
    • T.-H. Sun, C.-W. Cheng, and L.-C. Fu, "A Petri net based approach to modeling and scheduling for an FMS and a Case Study," IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 593-601, 1994.
    • (1994) IEEE Trans. Ind. Electron. , vol.41 , Issue.6 , pp. 593-601
    • Sun, T.-H.1    Cheng, C.-W.2    Fu, L.-C.3
  • 16
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning
    • R. Uzsoy, C. Y. Lee, and L. A. Martin-Vega, "A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning," IIE Trans. Sched. Logistics, vol. 24, no. 4, pp. 47-60, 1992.
    • (1992) IIE Trans. Sched. Logistics , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 17
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control
    • _, "A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control," IIE Trans. Sched. Logistics, vol. 26, no. 5, pp. 44-55, 1994.
    • (1994) IIE Trans. Sched. Logistics , vol.26 , Issue.5 , pp. 44-55
  • 19
    • 0029709086 scopus 로고    scopus 로고
    • A hybrid heuristic search algorithm for scheduling flexible manufacturing systems
    • Minneapolis, MN
    • H. H. Xiong, M. C. Zhou, and R. J. Caudill, "A hybrid heuristic search algorithm for scheduling flexible manufacturing systems," in Proc. 1996 IEEE Int. Conf. Robotics and Automation, Minneapolis, MN, 1996, pp. 2793-2797.
    • (1996) Proc. 1996 IEEE Int. Conf. Robotics and Automation , pp. 2793-2797
    • Xiong, H.H.1    Zhou, M.C.2    Caudill, R.J.3
  • 21
    • 0030654170 scopus 로고    scopus 로고
    • Deadlock-free scheduling of a flexible manufacturing systems using Petri net
    • Albuquerque, NM, Apr.
    • H. H. Xiong and M. C. Zhou, "Deadlock-free scheduling of a flexible manufacturing systems using Petri net," in 1997 IEEE Int. Conf. Robotics and Automation, Albuquerque, NM, Apr. 1997, pp. 132-137.
    • (1997) 1997 IEEE Int. Conf. Robotics and Automation , pp. 132-137
    • Xiong, H.H.1    Zhou, M.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.