-
1
-
-
0000165767
-
An algorithm for solving the job-shop problem
-
Carlier, J. and Pinsion, E., "An Algorithm for Solving the Job-Shop Problem," Management Science, Vol. 35, No. 2, pp. 164-176 (1989).
-
(1989)
Management Science
, vol.35
, Issue.2
, pp. 164-176
-
-
Carlier, J.1
Pinsion, E.2
-
2
-
-
0029527310
-
A heuristic approach based on the state equations of petri nets for FMS scheduling
-
Taipei, Taiwan
-
Chen, S.C. and Jeng, M.D., "A Heuristic Approach Based on the State Equations of Petri Nets for FMS Scheduling," Proceedings of the 1995 IEEE Industrial Automation and Control Conference, Taipei, Taiwan, pp. 275-281 (1995a).
-
(1995)
Proceedings of the 1995 IEEE Industrial Automation and Control Conference
, pp. 275-281
-
-
Chen, S.C.1
Jeng, M.D.2
-
3
-
-
0029505655
-
FMS scheduling using backtracking-free heuristic search based on petri net state equations
-
Vancouver, Canada
-
Chen, S.C. and Jeng, M.D., "FMS Scheduling Using Backtracking-Free Heuristic Search Based on Petri Net State Equations," Proceedings of the 1995 IEEE International Conference on Systems, Man, and Cybernetics, Vancouver, Canada, pp. 2153-2158 (1995b).
-
(1995)
Proceedings of the 1995 IEEE International Conference on Systems, Man, and Cybernetics
, pp. 2153-2158
-
-
Chen, S.C.1
Jeng, M.D.2
-
5
-
-
0024122470
-
Integer linear programming neural networks for job-shop scheduling
-
San Diego, CA
-
Foo, Yoon-Pin Simon and Takefuji, Yoshiyasu, "Integer Linear Programming Neural Networks for Job-Shop Scheduling," Proceedings of the IEEE International Conference on Neural Networks, San Diego, CA, Vol. 2, pp. 341-348 (1988).
-
(1988)
Proceedings of the IEEE International Conference on Neural Networks
, vol.2
, pp. 341-348
-
-
Foo, Y.-P.S.1
Takefuji, Y.2
-
7
-
-
0343036733
-
Integration of scheduling and control using petri nets for manufacturing automation
-
Taipei, Taiwan
-
Jeng, M.D. and Chen, S.C., "Integration of Scheduling and Control Using Petri Nets for Manufacturing Automation," Proceedings of the Third International Conference on Automation Technology, Taipei, Taiwan, pp. 223-228 (1994).
-
(1994)
Proceedings of the Third International Conference on Automation Technology
, pp. 223-228
-
-
Jeng, M.D.1
Chen, S.C.2
-
8
-
-
0030653167
-
Petri nets for formulation of aperiodic scheduling problems in FMSs
-
Los Angeles, CA
-
Jeng, M.D. and Lin, C.S., "Petri Nets for Formulation of Aperiodic Scheduling Problems in FMSs," Proceedings of IEEE International Conference on Emerging Technologies and Factory Automation, Los Angeles, CA, pp. 375-380 (1997).
-
(1997)
Proceedings of IEEE International Conference on Emerging Technologies and Factory Automation
, pp. 375-380
-
-
Jeng, M.D.1
Lin, C.S.2
-
10
-
-
0003697056
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Kruse, R.L., Leung, B.P., and Tondo, C.L., Data Structures and Program in C, Prentice-Hall, Englewood Cliffs, NJ (1991).
-
(1991)
Data Structures and Program in C
-
-
Kruse, R.L.1
Leung, B.P.2
Tondo, C.L.3
-
11
-
-
0028698360
-
Integrated scheduling of flexible manufacturing system employing automated guided vehicles
-
Lee, D.Y. and DiCesare, F., "Integrated Scheduling of Flexible Manufacturing System Employing Automated Guided Vehicles," IEEE Transactions on Industrial Electronics, Vol. 41, No. 6, pp. 602-608 (1994a).
-
(1994)
IEEE Transactions on Industrial Electronics
, vol.41
, Issue.6
, pp. 602-608
-
-
Lee, D.Y.1
DiCesare, F.2
-
12
-
-
0028413979
-
Scheduling flexible manufacturing system using petri nets and heuristic search
-
Lee, D.Y. and DiCesare, F., "Scheduling Flexible Manufacturing System Using Petri Nets and Heuristic Search," IEEE Transactions on Robotics and Automation, Vol. 10, No. 2, pp. 123-132 (1994b).
-
(1994)
IEEE Transactions on Robotics and Automation
, vol.10
, Issue.2
, pp. 123-132
-
-
Lee, D.Y.1
DiCesare, F.2
-
13
-
-
0025850145
-
Scheduling with neural networks for flexible manufacturing systems
-
Sacramento, CA
-
Lo, Z.P. and Bavarian, B., "Scheduling with Neural Networks for Flexible Manufacturing Systems," Proceedings of the IEEE International Conference on Robotics and Automation, Sacramento, CA, pp. 818-823 (1991).
-
(1991)
Proceedings of the IEEE International Conference on Robotics and Automation
, pp. 818-823
-
-
Lo, Z.P.1
Bavarian, B.2
-
14
-
-
0025595665
-
Schedule generation and reconfiguration for parallel machines
-
Luh, P.B., Hoitomt, D.J., Max, E., and Pattipati, K.R., "Schedule Generation and Reconfiguration for Parallel Machines," IEEE Transactions on Robotics and Automation, Vol. 6, No. 6, pp. 687-696 (1990).
-
(1990)
IEEE Transactions on Robotics and Automation
, vol.6
, Issue.6
, pp. 687-696
-
-
Luh, P.B.1
Hoitomt, D.J.2
Max, E.3
Pattipati, K.R.4
-
15
-
-
0027625736
-
Scheduling of manufacturing systems using the lagrangian relaxation technique
-
Luh, P.B. and Hoitomt, D.J., "Scheduling of Manufacturing Systems Using the Lagrangian Relaxation Technique," IEEE Transactions on Automatic Control, Vol. AC-38, No. 7 (1993).
-
(1993)
IEEE Transactions on Automatic Control
, vol.AC-38
, Issue.7
-
-
Luh, P.B.1
Hoitomt, D.J.2
-
16
-
-
0024645936
-
Petri nets: Properties, analysis and applications
-
Murata, T., "Petri Nets: Properties, Analysis and Applications," Proceedings of the IEEE, Vol. 77, No. 4, pp. 541-580 (1989).
-
(1989)
Proceedings of the IEEE
, vol.77
, Issue.4
, pp. 541-580
-
-
Murata, T.1
-
18
-
-
0003054955
-
A survey of scheduling rules
-
Panwalker, S.S. and Iskander, W., "A Survey of Scheduling Rules," Operations Research, Vol. 25, No. 1, pp. 45-61 (1977).
-
(1977)
Operations Research
, vol.25
, Issue.1
, pp. 45-61
-
-
Panwalker, S.S.1
Iskander, W.2
-
21
-
-
0028413569
-
A No-wait flowshop scheduling heuristic to minimize makespan
-
Rajendran, C., "A No-Wait Flowshop Scheduling Heuristic to Minimize Makespan," Journal of the Operations Research Society, Vol. 45, No. 4, pp. 472-478 (1994).
-
(1994)
Journal of the Operations Research Society
, vol.45
, Issue.4
, pp. 472-478
-
-
Rajendran, C.1
-
22
-
-
0026156030
-
Algebraic, mathematical programming, and network models of the deterministic job-shop scheduling problem
-
Rogers, R.V. and White, K.P., "Algebraic, Mathematical Programming, and Network Models of the Deterministic Job-Shop Scheduling Problem," IEEE Transactions on Systems, Man, and Cybernetics, Vol. SMC-21, No. 3, pp. 693-697 (1991).
-
(1991)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.SMC-21
, Issue.3
, pp. 693-697
-
-
Rogers, R.V.1
White, K.P.2
-
23
-
-
0025797863
-
A timed petri net and beam search based on-line FMS scheduling system with routing flexibility
-
Sacramento, CA
-
Shih, H. and Sekiguchi, T., "A Timed Petri Net and Beam Search Based On-Line FMS Scheduling System with Routing Flexibility," Proceedings of the IEEE International Conference on Robotics and Automation, Sacramento, CA, pp. 2548-2553 (1991).
-
(1991)
Proceedings of the IEEE International Conference on Robotics and Automation
, pp. 2548-2553
-
-
Shih, H.1
Sekiguchi, T.2
-
24
-
-
0001153857
-
Petri nets and flexible manufacturing
-
Springer-Verlag, Berlin
-
Silva, M. and Valette, R., "Petri Nets and Flexible Manufacturing," in Advances in Petri Nets, Springer-Verlag, Berlin, pp. 374-417 (1989).
-
(1989)
Advances in Petri Nets
, pp. 374-417
-
-
Silva, M.1
Valette, R.2
-
25
-
-
0027872654
-
Two stage heuristic procedure for scheduling job shops
-
Vancheeswaran, R. and Townsend, M.A., "Two Stage Heuristic Procedure for Scheduling Job Shops," Journal of Manufacturing Systems, Vol. 12, No. 4 (1993).
-
(1993)
Journal of Manufacturing Systems
, vol.12
, Issue.4
-
-
Vancheeswaran, R.1
Townsend, M.A.2
|