메뉴 건너뛰기




Volumn 29, Issue 5, 2006, Pages 577-583

The impact of release times, lot size, and scheduling policy in an A&T facility

Author keywords

ANOVA; Lot size; Release time; Scheduling policy; Simulation

Indexed keywords

COMPUTER SIMULATION; DATA REDUCTION; HEURISTIC METHODS; PRODUCTION CONTROL;

EID: 33745698706     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-005-2520-5     Document Type: Article
Times cited : (2)

References (7)
  • 2
    • 1642352034 scopus 로고    scopus 로고
    • A case study on the multistage IC final testing scheduling problem with reentry
    • Pearn WL, Chung SH, Chen AY, Yang MH (2004) A case study on the multistage IC final testing scheduling problem with reentry. Int J Prod Ecoon 88(3):257-267
    • (2004) Int J Prod Ecoon , vol.88 , Issue.3 , pp. 257-267
    • Pearn, W.L.1    Chung, S.H.2    Chen, A.Y.3    Yang, M.H.4
  • 4
    • 0030291549 scopus 로고    scopus 로고
    • The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop
    • Tsubone H, Ohba M, Uetake T (1996) The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop. Int J Prod Res 34(11):3037-3053
    • (1996) Int J Prod Res , vol.34 , Issue.11 , pp. 3037-3053
    • Tsubone, H.1    Ohba, M.2    Uetake, T.3
  • 5
    • 0034628952 scopus 로고    scopus 로고
    • Scheduling unbalanced cellular manufacturing systems with lot splitting
    • Lockwood WT, Mahmoodi F, Ruben RA, Mosier CT (2000) Scheduling unbalanced cellular manufacturing systems with lot splitting. Int J Prod Res 38(4):951-965
    • (2000) Int J Prod Res , vol.38 , Issue.4 , pp. 951-965
    • Lockwood, W.T.1    Mahmoodi, F.2    Ruben, R.A.3    Mosier, C.T.4
  • 6
    • 0000062028 scopus 로고
    • An n job, one machine sequencing algorithm for minimizing the number of late jobs
    • Moore JM (1968) An n job, one machine sequencing algorithm for minimizing the number of late jobs. Manage Sci 15(1): 102-109
    • (1968) Manage Sci , vol.15 , Issue.1 , pp. 102-109
    • Moore, J.M.1
  • 7
    • 0021120944 scopus 로고
    • On scheduling unit-length jobs with multiple release time/deadline intervals
    • Simons B, Sipser M (1982) On scheduling unit-length jobs with multiple release time/deadline intervals. Oper Res 32(1):80-88
    • (1982) Oper Res , vol.32 , Issue.1 , pp. 80-88
    • Simons, B.1    Sipser, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.