메뉴 건너뛰기




Volumn 33, Issue 3, 2006, Pages 219-226

Quantifying effects of accidents by fuzzy-logic- and simulation-based analysis

Author keywords

Effect of accidents; Fuzzy logic; Probability of accidents; Productivity; Simulation

Indexed keywords

ACCIDENTS; COMPUTER SIMULATION; FUZZY SETS; PIPELINE LAYING; PROBABILITY; PRODUCTIVITY; SAFETY FACTOR;

EID: 33745585328     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/L05-026     Document Type: Article
Times cited : (12)

References (20)
  • 2
    • 0024941238 scopus 로고
    • Safety assessment methodology for construction operations
    • Edited by A.H.S. Ang, M. Shinozuka, and G.I. Schueller. American Society of Civil Engineers, New York
    • Ayyub, B.M., and Eldukair, Z.A. 1990. Safety assessment methodology for construction operations. In Structural safety and reliability. Edited by A.H.S. Ang, M. Shinozuka, and G.I. Schueller. American Society of Civil Engineers, New York. pp. 771-777.
    • (1990) Structural Safety and Reliability , pp. 771-777
    • Ayyub, B.M.1    Eldukair, Z.A.2
  • 3
    • 33745605265 scopus 로고    scopus 로고
    • Census of fatal occupational injuries (CFOI) - Revised data, 7 June
    • Bureau of Labor Statistics. Bureau of Labor Statistics, US Department of Labor, Washington, D.C
    • Bureau of Labor Statistics. 2004a. Census of fatal occupational injuries (CFOI)-revised data, 7 June. Bureau of Labor Statistics, US Department of Labor, Washington, D.C.
    • (2004)
  • 4
    • 33745590212 scopus 로고    scopus 로고
    • Occupational employment and wages, 2001. Occupational employment statistics (OES)
    • Bureau of Labor Statistics. Bureau of Labor Statistics (BLS), US Department of Labor, Washington, D.C
    • Bureau of Labor Statistics. 2004b. Occupational employment and wages, 2001. Occupational employment statistics (OES). Bureau of Labor Statistics (BLS), US Department of Labor, Washington, D.C.
    • (2004)
  • 5
    • 33745627847 scopus 로고
    • Division of Construction Engineering and Management, Purdue University, West Lafayette, Ind
    • Halpin, D.W. 1990. MicroCYCLONE. Version 2.7 user's manual. Division of Construction Engineering and Management, Purdue University, West Lafayette, Ind.
    • (1990) MicroCYCLONE. Version 2.7 User's Manual
    • Halpin, D.W.1
  • 6
    • 0003402124 scopus 로고
    • Planning and analysis of construction operations
    • Wiley Interscience, New York, N.Y
    • Halpin, D.W., and Riggs, L,S. 1992. Planning and analysis of construction operations. Wiley Interscience, New York, N.Y.
    • (1992)
    • Halpin, D.W.1    Riggs, L.S.2
  • 7
    • 0042988039 scopus 로고
    • Indirect costs of construction accidents
    • Construction Industry Institute, Austin, Tex. Source Document 67
    • Hinze, J. 1991. Indirect costs of construction accidents. Construction Industry Institute, Austin, Tex. Source Document 67.
    • (1991)
    • Hinze, J.1
  • 8
    • 0011743473 scopus 로고    scopus 로고
    • Construction safety
    • Prentice-Hall, Inc., Upper Saddle River, N.J
    • Hinze, J. 1997. Construction safety. Prentice-Hall, Inc., Upper Saddle River, N.J.
    • (1997)
    • Hinze, J.1
  • 10
    • 18144377150 scopus 로고    scopus 로고
    • Construction site safety: A guide for managing contractors
    • Lewis Publishers, Inc., Boca Raton, Fla
    • Hislop, R.D. 1999. Construction site safety: a guide for managing contractors. Lewis Publishers, Inc., Boca Raton, Fla.
    • (1999)
    • Hislop, R.D.1
  • 11
    • 33745584859 scopus 로고    scopus 로고
    • Repair work at Miller Park will cost at least $50 million
    • [online] 23, Aug. 1999. Available from [updated 23 August 1999]
    • Lamke, K.R. 1999. Repair work at Miller Park will cost at least $50 million (online]. Milwaukee Journal Sentinel, 23, Aug. 1999. Available from http://www.jsonline.com/news/metro/aug99/stad24082399.asp [updated 23 August 19991].
    • (1999) Milwaukee Journal Sentinel
    • Lamke, K.R.1
  • 13
    • 33745600640 scopus 로고    scopus 로고
    • Excavation and trenching safety: Existing standards and challenges
    • Hong Kong, 7-10 May 2002. Edited by S. Rowlinson. Department of Real Estate and Construction, University of Hong Kong, Hong Kong
    • Lew, J., Abraham, D., Wirahadikusumah, R., Irizarry, J., and Arboleda, C. 2002. Excavation and trenching safety: existing standards and challenges. In Implementation of Safety and Health on Construction Sites: Proceedings of CIB W099 Conference, Hong Kong, 7-10 May 2002. Edited by S. Rowlinson. Department of Real Estate and Construction, University of Hong Kong, Hong Kong. pp. 103-109.
    • (2002) Implementation of Safety and Health on Construction Sites: Proceedings of CIB W099 Conference , pp. 103-109
    • Lew, J.1    Abraham, D.2    Wirahadikusumah, R.3    Irizarry, J.4    Arboleda, C.5
  • 17
    • 0004164013 scopus 로고    scopus 로고
    • Fuzzy and neural approaches in engineering
    • John Wiley & Sons, Inc., New York, N.Y
    • Tsoukalas, L.H., and Uhrig, R.E. 1997. Fuzzy and neural approaches in engineering. John Wiley & Sons, Inc., New York, N.Y.
    • (1997)
    • Tsoukalas, L.H.1    Uhrig, R.E.2
  • 20


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.