-
1
-
-
84876823885
-
State of the art in construction simulation
-
Washington, D.C.
-
AbouRizk, S.M., Halpin, D.W., and Lutz, J. 1992. State of the art in construction simulation. Proceedings of the Winter Simulation Conference, Washington, D.C., pp. 1271-1277.
-
(1992)
Proceedings of the Winter Simulation Conference
, pp. 1271-1277
-
-
Abourizk, S.M.1
Halpin, D.W.2
Lutz, J.3
-
2
-
-
33749203024
-
Peace River bridge plans and specifications
-
Bridge Engineering Branch, Edmonton, Alta.
-
ATU. 1989. Peace River bridge plans and specifications. Alberta Transportation and Utilities, Bridge Engineering Branch, Edmonton, Alta.
-
(1989)
Alberta Transportation and Utilities
-
-
-
3
-
-
0345040904
-
Construction management game-deterministic model
-
Au, T., Bostleman, R., and Parti, E. 1969. Construction management game-deterministic model. ASCE Journal of the Construction Division, 95(CO1): 25-38.
-
(1969)
ASCE Journal of the Construction Division
, vol.95
, Issue.CO1
, pp. 25-38
-
-
Au, T.1
Bostleman, R.2
Parti, E.3
-
4
-
-
33749201250
-
Computerized decision making in construction
-
Georgia Institute of Technology, Atlanta, Ga.
-
Dabbas, M. 1981. Computerized decision making in construction. Ph.D. thesis, Department of Civil Engineering, Georgia Institute of Technology, Atlanta, Ga.
-
(1981)
Ph.D. Thesis, Department of Civil Engineering
-
-
Dabbas, M.1
-
6
-
-
0010053548
-
An investigation of the use of simulation networks for modeling construction operations
-
University of Illinois, Urbana-Champaign, Ill.
-
Halpin, D.W. 1973. An investigation of the use of simulation networks for modeling construction operations. Ph.D. thesis, Depart-ment of Civil Engineering, University of Illinois, Urbana-Champaign, Ill.
-
(1973)
Ph.D. Thesis, Depart-ment of Civil Engineering
-
-
Halpin, D.W.1
-
7
-
-
0017539255
-
CYCLONE: Method for modeling of job site processes
-
Halpin, D.W. 1977. CYCLONE: method for modeling of job site processes. ASCE Journal of the Construction Division, 103(3): 489-499.
-
(1977)
ASCE Journal of the Construction Division
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
11
-
-
33749154481
-
Precedence and arrow networking techniques for construction
-
Harris, R.B. 1978. Precedence and arrow networking techniques for construction. John Wiley & Sons, New York.
-
(1978)
John Wiley & Sons, New York.
-
-
Harris, R.B.1
-
12
-
-
0343046793
-
Knowledge-based simulation of construction plans
-
American Society of Civil Engineers, Dallas, Tex.
-
Odeh, A.M., Tommelein, I.D., and Carr, R.I. 1992. Knowledge-based simulation of construction plans. Proceedings of the 8th Conference on Computing in Civil Engineering, American Society of Civil Engineers, Dallas, Tex., pp. 1042-1049.
-
(1992)
Proceedings of the
, vol.8
, pp. 1042-1049
-
-
Odeh, A.M.1
Tommelein, I.D.2
Carr, R.I.3
-
14
-
-
0012255826
-
Simulation based planning method for construction
-
Sawhney, A. 1994. Simulation based planning method for construction. Ph.D. thesis, Department of Civil Engineering, University of Alberta, Edmonton, Alta.
-
(1994)
Ph.D. Thesis, Department of Civil Engineering, University of Alberta, Edmonton, Alta.
-
-
Sawhney, A.1
-
16
-
-
0003880227
-
A simulation approach to the selection of construction equipment
-
Teicholz, P. 1963. A simulation approach to the selection of construction equipment. Construction Institute, Stanford University, Palo Alto, Calif, Technical Report 26.
-
(1963)
Construction Institute, Stanford University, Palo Alto, Calif, Technical Report
, pp. 26
-
-
Teicholz, P.1
|