메뉴 건너뛰기




Volumn 9, Issue 3, 2006, Pages 255-278

Duty-period-based network model for crew rescheduling in European airlines

Author keywords

Column generation; Crew recovery; Crew scheduling; Disruption management; Irregular operations; Operational crew scheduling; Rescheduling; Transportation

Indexed keywords

AIR TRAFFIC CONTROL; CONSTRAINT THEORY; COST EFFECTIVENESS; RESOURCE ALLOCATION; SCHEDULING;

EID: 33646572493     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-006-6780-1     Document Type: Article
Times cited : (48)

References (27)
  • 1
    • 0002159168 scopus 로고
    • Recent advances in crew-pairing optimization at American Airlines
    • Anbil, R., E. Gelman, B. Patty, and R. Tanga, "Recent advances in crew-pairing optimization at American Airlines", Interfaces, vol. 21, no. 1, pp. 62-74, 1991.
    • (1991) Interfaces , vol.21 , Issue.1 , pp. 62-74
    • Anbil, R.1    Gelman, E.2    Patty, B.3    Tanga, R.4
  • 2
    • 0035480369 scopus 로고    scopus 로고
    • Optimizing aircraft routings in response to grounding and delays
    • Bard. J.F., G. Yu, and M.F. Argüello, "Optimizing aircraft routings in response to grounding and delays", IIE Transactions, vol. 33, pp. 931-947, 2001.
    • (2001) IIE Transactions , vol.33 , pp. 931-947
    • Bard, J.F.1    Yu, G.2    Argüello, M.F.3
  • 3
    • 0026923017 scopus 로고
    • Very large scale linear programming: A case study in combining interior point and simplex methods
    • Bixby, R.E., J.W. Gregory, I.J. Lustig, R.E. Marsten, and D.F. Shanno. "Very large scale linear programming: A case study in combining interior point and simplex methods", Operations Research, vol. 40, no. 5, pp. 885-897, 1992.
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 885-897
    • Bixby, R.E.1    Gregory, J.W.2    Lustig, I.J.3    Marsten, R.E.4    Shanno, D.F.5
  • 4
    • 0040747349 scopus 로고    scopus 로고
    • FedEx generates bid lines using simulated annealing
    • Campbell, K.W., R.B. Durfee, and G.S. Hines, "FedEx generates bid lines using simulated annealing", Interfaces, vol. 27, no. 2, pp. 1-16, 1997.
    • (1997) Interfaces , vol.27 , Issue.2 , pp. 1-16
    • Campbell, K.W.1    Durfee, R.B.2    Hines, G.S.3
  • 5
    • 0032051384 scopus 로고    scopus 로고
    • Irregular airline operations: A review of the state-of-the-practice in airline operations control centers
    • Clarke. M.D.D., "Irregular airline operations: A review of the state-of-the-practice in airline operations control centers". Journal of Air Transport Management, vol. 4, no. 2, pp. 67-76, 1998.
    • (1998) Journal of Air Transport Management , vol.4 , Issue.2 , pp. 67-76
    • Clarke, M.D.D.1
  • 7
    • 0031219842 scopus 로고    scopus 로고
    • Flight attendant rostering for short-haul airline operations
    • Day, P.R., and D.M. Ryan. "Flight attendant rostering for short-haul airline operations", Operations Research, vol. 45, no. 5, pp. 649-661, 1997.
    • (1997) Operations Research , vol.45 , Issue.5 , pp. 649-661
    • Day, P.R.1    Ryan, D.M.2
  • 10
    • 0032637840 scopus 로고    scopus 로고
    • A column generation approach for large-scale aircrew rostering problems
    • 1999
    • Gamache, M., F. Soumis, and G. Marquis (1999), "A column generation approach for large-scale aircrew rostering problems", Operations Research, vol. 47, no. 2, pp. 247-262, 1999.
    • (1999) Operations Research , vol.47 , Issue.2 , pp. 247-262
    • Gamache, M.1    Soumis, F.2    Marquis, G.3
  • 12
    • 0027614308 scopus 로고
    • Solving airline crew scheduling problems by branch-and-cut
    • Hoffman. K.L., and M. Padberg, "Solving airline crew scheduling problems by branch-and-cut", Management Science, vol. 39, no. 6, pp. 657-682, 1993.
    • (1993) Management Science , vol.39 , Issue.6 , pp. 657-682
    • Hoffman, K.L.1    Padberg, M.2
  • 13
    • 33646589783 scopus 로고
    • Airline irregular operations
    • D. Jenkins, and C.P. Ray (eds.), McGrawHill Aviation Week Group: New York
    • Irrgang, M.E., "Airline irregular operations" in D. Jenkins, and C.P. Ray (eds.), Handbook of airline economics (1st edition), McGrawHill Aviation Week Group: New York, pp. 349-365, 1995.
    • (1995) Handbook of Airline Economics (1st Edition) , pp. 349-365
    • Irrgang, M.E.1
  • 14
    • 0039466523 scopus 로고    scopus 로고
    • The problem of generating crew bidlines
    • Jarrah, A.I.Z., and J.T. Diamond. "The problem of generating crew bidlines". Interfaces, vol. 27, no. 4, pp. 49-64, 1997.
    • (1997) Interfaces , vol.27 , Issue.4 , pp. 49-64
    • Jarrah, A.I.Z.1    Diamond, J.T.2
  • 16
    • 0023994772 scopus 로고
    • A new approach for crew pairing problems by column generation with an application to air transportation
    • Lavoie, S., M. Minoux, and E. Odier, "A new approach for crew pairing problems by column generation with an application to air transportation", European Journal of Operational Research, vol. 35, pp. 45-58, 1988.
    • (1988) European Journal of Operational Research , vol.35 , pp. 45-58
    • Lavoie, S.1    Minoux, M.2    Odier, E.3
  • 18
    • 77950019682 scopus 로고    scopus 로고
    • Airline crew scheduling: From planning to operations
    • Carmen Systems AB. Göteborg, Sweden
    • Medard C.P., and N. Sawhney, "Airline crew scheduling: From planning to operations", Carmen Systems AB. Göteborg, Sweden, Carmen Research and Technology Report CRTR-0406, 2004.
    • (2004) Carmen Research and Technology Report , vol.CRTR-0406
    • Medard, C.P.1    Sawhney, N.2
  • 22
    • 0032142464 scopus 로고    scopus 로고
    • The operational airline crew scheduling problem
    • Stojković M., and M. Soumis, "The operational airline crew scheduling problem", Transportation Science, vol. 32, no. 3, pp. 232-245, 1998.
    • (1998) Transportation Science , vol.32 , Issue.3 , pp. 232-245
    • Stojković, M.1    Soumis, M.2
  • 24
    • 21844527216 scopus 로고
    • An algorithm for large scale 0-1 programming with application to airline crew scheduling
    • Wedelin, D., "An algorithm for large scale 0-1 programming with application to airline crew scheduling", Annals of Operations Research, vol. 57, pp. 283-301, 1995.
    • (1995) Annals of Operations Research , vol.57 , pp. 283-301
    • Wedelin, D.1
  • 25
    • 0008608682 scopus 로고    scopus 로고
    • Optimization model and algorithm for crew management during airline irregular operations
    • Wei, G., G. Yu, and M. Song, "Optimization model and algorithm for crew management during airline irregular operations", Journal of Combinatorial Optimization, vol. 1, no. 3, pp. 305-321, 1997.
    • (1997) Journal of Combinatorial Optimization , vol.1 , Issue.3 , pp. 305-321
    • Wei, G.1    Yu, G.2    Song, M.3
  • 26
    • 0031070860 scopus 로고    scopus 로고
    • Airline scheduling for the temporary closure of airports
    • Yan, S., and C.-G. Lin. "Airline scheduling for the temporary closure of airports", Transportation Science, vol. 31, no. 1, pp. 72-82, 1997.
    • (1997) Transportation Science , vol.31 , Issue.1 , pp. 72-82
    • Yan, S.1    Lin, C.-G.2
  • 27
    • 0037251369 scopus 로고    scopus 로고
    • A new era for crew recovery at Continental Airlines
    • Yu, G., M. Argüello, G. Song, S.M. McCowan, and A. White, "A new era for crew recovery at Continental Airlines", Interfaces, vol. 33, no. 1, pp. 5-22, 2003.
    • (2003) Interfaces , vol.33 , Issue.1 , pp. 5-22
    • Yu, G.1    Argüello, M.2    Song, G.3    McCowan, S.M.4    White, A.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.