메뉴 건너뛰기




Volumn , Issue , 2005, Pages 482-487

Dynamic scheduling with processing time uncertainty using the mixture of real-time scheduling and periodic optimization

Author keywords

Dynamic Job Shop; Genetic Algorithm; Priority Rule; Real time Scheduling; Rolling Scheduling; Scheduling

Indexed keywords

GENETIC ALGORITHMS; NUMERICAL METHODS; OPTIMIZATION; REAL TIME SYSTEMS; UNCERTAIN SYSTEMS;

EID: 33645317095     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (1)

References (22)
  • 1
    • 84989493292 scopus 로고
    • An experimental study of the effectiveness of rolling schedules in production planning
    • K.R.Baker, An experimental study of the effectiveness of rolling schedules in production planning, Decision Science, Vol.8, pp19-27, 1977.
    • (1977) Decision Science , vol.8 , pp. 19-27
    • Baker, K.R.1
  • 2
    • 0017468930 scopus 로고
    • Centralized scheduling priority implementation heuristics for a dynamic job shop model
    • P.T.Nelson, C.A.Holloway, R.M.-L.Wong, Centralized scheduling priority implementation heuristics for a dynamic job shop model, AIIE Transactions, Vol.9, No.1, pp95-102, 1977.
    • (1977) AIIE Transactions , vol.9 , Issue.1 , pp. 95-102
    • Nelson, P.T.1    Holloway, C.A.2    Wong, R.M.-L.3
  • 3
    • 0028406904 scopus 로고
    • A dynamic job shop scheduling framework: A backward approach
    • D.Sun, L.Lin, A dynamic job shop scheduling framework: a backward approach, International Journal of Production Research, Vol.32, No.4, pp.967-985, 1994.
    • (1994) International Journal of Production Research , vol.32 , Issue.4 , pp. 967-985
    • Sun, D.1    Lin, L.2
  • 4
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
    • I.M.Ovacik, R.Uzsoy, Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times, International Journal of Production Research, Vol.33, No.11, pp.3173-3192, 1995.
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3173-3192
    • Ovacik, I.M.1    Uzsoy, R.2
  • 6
    • 0040621775 scopus 로고    scopus 로고
    • Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop
    • E.Kutanoglu, I. Sabuncuoglu, Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop, Journal of Manufacturing Systems, Vol.20, No.4, pp.264-279, 2001.
    • (2001) Journal of Manufacturing Systems , vol.20 , Issue.4 , pp. 264-279
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 7
    • 0031069765 scopus 로고    scopus 로고
    • Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
    • Lawrence, Swell, Heuristic, optimal, static, and dynamic schedules when processing times are uncertain, Journal of Operations Management, Vol.15, pp.71-82, 1997.
    • (1997) Journal of Operations Management , vol.15 , pp. 71-82
    • Lawrence, S.1
  • 8
    • 0000179190 scopus 로고    scopus 로고
    • Rescheduling frequency in an FMS with uncertain processing times and unreliable machines
    • I.Sabuncuoglu, S.Karabuk, Rescheduling frequency in an FMS with uncertain processing times and unreliable machines, Journal of Manufacturing Systems, Vol.18, No.4, pp.268-283, 1999.
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.4 , pp. 268-283
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 9
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • I.Sabuncuoglu, M.Bayiz, Analysis of reactive scheduling problems in a job shop environment, European Journal of Operational Research, Vol.126, pp.567-586, 2000.
    • (2000) European Journal of Operational Research , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 12
    • 0027625187 scopus 로고
    • Sequnecing, dispatching, and switching in a dynamic manufacturing environment
    • H.Matsuura, H.Tsubone, M.Kanezashi, Sequnecing, dispatching, and switching in a dynamic manufacturing environment, International Journal of Production Research, Vol.31, No.7, pp.1671-1688, 1993.
    • (1993) International Journal of Production Research , vol.31 , Issue.7 , pp. 1671-1688
    • Matsuura, H.1    Tsubone, H.2    Kanezashi, M.3
  • 14
    • 0001096735 scopus 로고
    • Genetic algorithms and random keys for sequencing and optimization
    • J.C. Bean, Genetic algorithms and random keys for sequencing and optimization, ORSA Journal on Computing, Vol.2, No.2, pp. 154-160, 1994.
    • (1994) ORSA Journal on Computing , vol.2 , Issue.2 , pp. 154-160
    • Bean, J.C.1
  • 15
    • 0033101911 scopus 로고    scopus 로고
    • A genetic algorithm methodology for complex scheduling problems
    • B.A.Norman and J.C.Bean, A genetic algorithm methodology for complex scheduling problems, Naval Research Logistics, Vol.46, pp.199-211, 1999.
    • (1999) Naval Research Logistics , vol.46 , pp. 199-211
    • Norman, B.A.1    Bean, J.C.2
  • 18
    • 19944400835 scopus 로고    scopus 로고
    • Dynamic scheduling using the mixture of a genetic algorithm and a priority rule
    • in Japanese
    • T.Eguchi, F.Oba, S.Kozaki, Dynamic scheduling using the mixture of a genetic algorithm and a priority rule, Transaction of the Japan Society of Mechanical Engineers, Vol.71, No.703, pp.1047-1052, 2005 (in Japanese).
    • (2005) Transaction of the Japan Society of Mechanical Engineers , vol.71 , Issue.703 , pp. 1047-1052
    • Eguchi, T.1    Oba, F.2    Kozaki, S.3
  • 20
    • 0032784020 scopus 로고    scopus 로고
    • An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
    • E.Kutanoglu, I.Sabuncuoglu, An analysis of heuristics in a dynamic job shop with weighted tardiness objectives, International Journal of Production Research, No.37, Vol.1, pp.165-187, 1999.
    • (1999) International Journal of Production Research , vol.1 , Issue.37 , pp. 165-187
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 21
    • 0033226070 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data Parti
    • R.Shafaei,P.Brunn, Workshop scheduling using practical (inaccurate) data Parti, International Journal of Production Research, No.37, Vol.17, pp.3913-3925, 1999.
    • (1999) International Journal of Production Research , vol.17 , Issue.37 , pp. 3913-3925
    • Shafaei, R.1    Brunn, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.