메뉴 건너뛰기




Volumn 71, Issue 3, 2005, Pages 1047-1053

Dynamic scheduling using the mixture of a genetic algorithm and a priority rule

Author keywords

Dynamic Scheduling; Genetic Algorithm; Job Shop; Priority Rule; Production Planning; Production System; Rolling Scheduling; Scheduling; Tardiness Cost

Indexed keywords

JOB ANALYSIS; PLANNING; PROBLEM SOLVING; SCHEDULING;

EID: 19944400835     PISSN: 03875024     EISSN: None     Source Type: Journal    
DOI: 10.1299/kikaic.71.1047     Document Type: Article
Times cited : (12)

References (19)
  • 1
    • 84989493292 scopus 로고
    • An experimental study of the effectiveness of rolling schedules in production planning
    • K.R.Baker: An experimental study of the effectiveness of rolling schedules in production planning, Decision Science,Vol8, pp.19-27 (1977)
    • (1977) Decision Science , vol.8 , pp. 19-27
    • Baker, K.R.1
  • 2
    • 0017468930 scopus 로고
    • Centralized scheduling priority implementation heuristics for a dynamic job shop model
    • P.T.Nelson, C.A.Holloway, RM.-L.Wong: Centralized scheduling priority implementation heuristics for a dynamic job shop model, AIIE Transactions, Vol9, No.l, pp.95-102 (1977)
    • (1977) AIIE Transactions , vol.9 , Issue.50 , pp. 95-102
    • Nelson, P.T.1    Holloway, C.A.2    Wong, R.M.-L.3
  • 3
    • 0028406904 scopus 로고
    • A dynamic job shop scheduling framework: A backward approach
    • D.Sun, LLin: A dynamic job shop scheduling framework: a backward approach, International Journal of Production Research, Vol32, No.4, pp.967-985,(1994)
    • (1994) International Journal of Production Research , vol.32 , Issue.4 , pp. 967-985
    • Sun, D.1    Lin, L.2
  • 4
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
    • I.M.Ovacik, R-Uzsoy: Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times, International Journal of Production Research, Vol.33, No.11, pp.3173-3192,(l995)
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3173-3192
    • Ovacik, I.M.1    Uzsoy, R.2
  • 5
    • 0040621775 scopus 로고    scopus 로고
    • Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop
    • E.Kutanoglu, I. Sabuncuoglu: Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop, Journal of Manufacturing Systems, Vol20, No.4, pp.264-279, (2001)
    • (2001) Journal of Manufacturing Systems , vol.20 , Issue.4 , pp. 264-279
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 6
    • 33646210492 scopus 로고    scopus 로고
    • Japanese source
  • 7
    • 33646218323 scopus 로고    scopus 로고
    • Japanese source
  • 11
    • 0001096735 scopus 로고
    • Genetic algorithms and random keys for sequencing and optimization
    • J.C. Bean: Genetic algorithms and random keys for sequencing and optimization, ORSA Journal on Computing, Vol2, No.2, pp.154-160 (1994)
    • (1994) ORSA Journal on Computing , vol.2 , Issue.2 , pp. 154-160
    • Bean, J.C.1
  • 12
    • 0033101911 scopus 로고    scopus 로고
    • A genetic algorithm methodology for complex scheduling problems
    • B.A.Norman and J.C.Bean: A genetic algorithm methodology for complex scheduling problems, Naval Research Logistics, Vol.46, pp.199-211,(l999)
    • (1999) Naval Research Logistics , vol.46 , pp. 199-211
    • Norman, B.A.1    Bean, J.C.2
  • 13
    • 33646213215 scopus 로고    scopus 로고
    • Japanese source
  • 16
    • 0032784020 scopus 로고    scopus 로고
    • An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
    • E.Kutanoglu, I.Sabuncuoglu: An analysis of heuristics in a dynamic job shop with weighted tardiness objectives, International Journal of Production Research, No.37, Vol. 1, pp.165-187, (1999)
    • (1999) International Journal of Production Research , vol.1 , Issue.37 , pp. 165-187
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 17
    • 0033226070 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data Parti
    • R.Shafaei,P.Brunn: Workshop scheduling using practical (inaccurate) data Parti, International Journal of Production Research, No.37, Vol.17, pp.3913-3925, (1999)
    • (1999) International Journal of Production Research , vol.17 , Issue.37 , pp. 3913-3925
    • Shafaei, R.1    Brunn, P.2
  • 18
    • 33646226433 scopus 로고    scopus 로고
    • Japanese source
  • 19
    • 0007513531 scopus 로고    scopus 로고
    • Hierarchical real-time scheduling by using a neural network -A decision method of scheduling rules
    • F.Oba, T.Eguchi, Y.Tomokiyo, D.Ma: Hierarchical Real-time Scheduling by Using a Neural Network -A decision Method of Scheduling Rules-, CIRP-Journal of Manufacturing Systems, No.27, Vol.3, pp.289-294, (1998)
    • (1998) CIRP-journal of Manufacturing Systems , vol.3 , Issue.27 , pp. 289-294
    • Oba, F.1    Eguchi, T.2    Tomokiyo, Y.3    Ma, D.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.