-
1
-
-
0034830440
-
A real-time localization system for compactors
-
Bouvat, D., Froumentin, M., and Garcia, G. (2001). "A real-time localization system for compactors." Autom. Constr., 10(4), 417-428.
-
(2001)
Autom. Constr.
, vol.10
, Issue.4
, pp. 417-428
-
-
Bouvat, D.1
Froumentin, M.2
Garcia, G.3
-
2
-
-
15944411006
-
-
July 11, 2003
-
CAES. (2003). "Computer-aided earthmoving system." 〈http://www.cat.com/products/〉 (July 11, 2003).
-
(2003)
Computer-aided Earthmoving System
-
-
-
3
-
-
1642587217
-
PPMS: A web-based construction project performance monitoring aystem
-
Cheung, S. O., Suen, H. C. H., and Chueng, K. K. W. (2004). "PPMS: A web-based construction project performance monitoring aystem." Autom. Constr., 13(3), 361-376.
-
(2004)
Autom. Constr.
, vol.13
, Issue.3
, pp. 361-376
-
-
Cheung, S.O.1
Suen, H.C.H.2
Chueng, K.K.W.3
-
5
-
-
0011521840
-
Automated real-time manpower productivity control
-
E & FN Spon, London
-
Goldschmidt, E., and Navon, R. (1996). "Automated real-time manpower productivity control." Proc., 8th Int. Symp. on Organization and Management of Construction, E & FN Spon, London, 199-205.
-
(1996)
Proc., 8th Int. Symp. on Organization and Management of Construction
, pp. 199-205
-
-
Goldschmidt, E.1
Navon, R.2
-
6
-
-
13944255063
-
Factors in productivity and unit cost for advanced machine guidance
-
Jonasson, S., Dunston, P. S., Ahmed, K., and Hamilton, J. (2002). "Factors in productivity and unit cost for advanced machine guidance." J. Constr. Eng. Manage., 128(5), 367-374.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.5
, pp. 367-374
-
-
Jonasson, S.1
Dunston, P.S.2
Ahmed, K.3
Hamilton, J.4
-
7
-
-
0037208750
-
Framework for an intelligent earthwork system: Part I. System architecture
-
Kim, S.-K., and Russell, J. S. (2003a). "Framework for an intelligent earthwork system: Part I. System architecture." Autom. Constr., 12(1), 1-13.
-
(2003)
Autom. Constr.
, vol.12
, Issue.1
, pp. 1-13
-
-
Kim, S.-K.1
Russell, J.S.2
-
8
-
-
0037208763
-
Framework for an intelligent earthwork system: Part II. Task identification/scheduling and resource allocation methodology
-
Kim, S.-K., and Russell, J. S. (2003b). "Framework for an intelligent earthwork system: Part II. Task identification/scheduling and resource allocation methodology." Autom. Constr., 12(1), 15-27.
-
(2003)
Autom. Constr.
, vol.12
, Issue.1
, pp. 15-27
-
-
Kim, S.-K.1
Russell, J.S.2
-
9
-
-
0031380657
-
Automating field data collection in construction organizations
-
ASCE, Reston, Va
-
McCullouch, B. (1997). "Automating field data collection in construction organizations." Proc., Construction Congress V, ASCE, Reston, Va., 957-963.
-
(1997)
Proc., Construction Congress V
, pp. 957-963
-
-
McCullouch, B.1
-
10
-
-
13944281377
-
Can labor inputs be measured and controlled automatically
-
Navon, R., and Goldschmidt, E. (2003). "Can labor inputs be measured and controlled automatically." J. Constr. Eng. Manage., 128(4), 437-445.
-
(2003)
J. Constr. Eng. Manage.
, vol.128
, Issue.4
, pp. 437-445
-
-
Navon, R.1
Goldschmidt, E.2
-
11
-
-
0346639292
-
A concept proving prototype of automated earthmoving control
-
Navon, R., Goldschmidt, E., and Shpatnitsky, Y. (2004). "A concept proving prototype of automated earthmoving control." Autom. Constr., 13(2), 225-239.
-
(2004)
Autom. Constr.
, vol.13
, Issue.2
, pp. 225-239
-
-
Navon, R.1
Goldschmidt, E.2
Shpatnitsky, Y.3
-
12
-
-
0031363048
-
Automated monitoring of compaction using GPS
-
ASCE, Reston, Va
-
Oloufa, A. A., Do, W., and Thomas, W. R. (1997). "Automated monitoring of compaction using GPS." Proc., Construction Congress V, ASCE, Reston, Va., 1004-1011.
-
(1997)
Proc., Construction Congress V
, pp. 1004-1011
-
-
Oloufa, A.A.1
Do, W.2
Thomas, W.R.3
-
13
-
-
14544273443
-
Asphalt quality parameters tracability using electronic tags and GPS
-
NIST, Gaithersburg, Md
-
Pèyret, F., and Tasky, R. (2002). "Asphalt quality parameters tracability using electronic tags and GPS." Proc., 19th Int. Symp. on Automation and Robotics in Construction, NIST, Gaithersburg, Md., 155-160.
-
(2002)
Proc., 19th Int. Symp. on Automation and Robotics in Construction
, pp. 155-160
-
-
Pèyret, F.1
Tasky, R.2
-
14
-
-
0033707986
-
The computer integrated road construction project
-
Pèyret, F., Jurasz, J., Carrel, A., Zekri, E., and Gorham, B. (2000). "The computer integrated road construction project." Autom. Constr., 9(3), 447-461.
-
(2000)
Autom. Constr.
, vol.9
, Issue.3
, pp. 447-461
-
-
Pèyret, F.1
Jurasz, J.2
Carrel, A.3
Zekri, E.4
Gorham, B.5
-
15
-
-
2942739545
-
Building project model support for automated labor monitoring
-
Sacks, R., Navon, R., and Goldschmidt, E. (2003). "Building project model support for automated labor monitoring." J. Comput. Civ. Eng., 17(1), 19-27.
-
(2003)
J. Comput. Civ. Eng.
, vol.17
, Issue.1
, pp. 19-27
-
-
Sacks, R.1
Navon, R.2
Goldschmidt, E.3
-
16
-
-
15944397286
-
-
SiteVision. (2003). "3D machine control." 〈http://www. trimble.com/sitevision.html〉.
-
(2003)
3D Machine Control
-
-
-
17
-
-
0034587494
-
Automated earthmoving status determination
-
ASCE, Reston, Va
-
Stone, W. C., Cheok, G., and Lipman, R. (2000). "Automated earthmoving status determination." Proc., ACSE Conf. on Robotics for Challenging Environments, ASCE, Reston, Va., 111-119.
-
(2000)
Proc., ACSE Conf. on Robotics for Challenging Environments
, pp. 111-119
-
-
Stone, W.C.1
Cheok, G.2
Lipman, R.3
|