메뉴 건너뛰기




Volumn , Issue , 2005, Pages 1-8

Multi-attribute utility model for quantifying schedule and cost overruns in pipe-line projects

Author keywords

[No Author keywords available]

Indexed keywords


EID: 31844451888     PISSN: 15287106     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (3)

References (13)
  • 1
    • 0023568753 scopus 로고
    • Optimum markup for bidding: A preference-uncertainty trade off approach
    • Ahmad, I. and Minkarah, I. A. (1987). "Optimum Markup for Bidding: A Preference-Uncertainty Trade Off Approach", Civil Engineering Systems, Vol. 4, pp. 170-174.
    • (1987) Civil Engineering Systems , vol.4 , pp. 170-174
    • Ahmad, I.1    Minkarah, I.A.2
  • 2
    • 77952273430 scopus 로고    scopus 로고
    • An application of the analytical hierarchy process to international location decision-making
    • Centre for International Manufacturing, Cambridge University
    • Atthirawong, W., and MacCarthy, B. (2002). "An Application of the Analytical Hierarchy Process to International Location Decision-Making", 7th Cambridge Research Symposium on International Manufacturing, Centre for International Manufacturing, Cambridge University.
    • (2002) 7th Cambridge Research Symposium on International Manufacturing
    • Atthirawong, W.1    MacCarthy, B.2
  • 5
    • 31844455315 scopus 로고    scopus 로고
    • Quick start guide and tutorials: User's manual
    • Pittsburgh, PA: Expert Choice, Inc.
    • Expert Choice, 2000, (2003). "Quick Start Guide and Tutorials: User's Manual", Pittsburgh, PA: Expert Choice, Inc.
    • (2003) Expert Choice, 2000
  • 6
    • 31844437600 scopus 로고    scopus 로고
    • Belief network analysis of cost risk in long-term construction
    • University of Alberta, Canada
    • Eyers, K. and McCabe, B. (2000). "Belief Network Analysis of Cost Risk in Long-Term Construction", Proceedings of the 7th Construction Research Forum, University of Alberta, Canada.
    • (2000) Proceedings of the 7th Construction Research Forum
    • Eyers, K.1    McCabe, B.2
  • 9
    • 0032072617 scopus 로고    scopus 로고
    • Factirs of non-excusable delays that influence contractor's performance
    • Majid, M. Z. and McCaffer, R. (1998). "Factirs of Non-excusable Delays that Influence Contractor's Performance", Journal of Management in Engineering, Vol. 14, No. 3, pp. 42-49.
    • (1998) Journal of Management in Engineering , vol.14 , Issue.3 , pp. 42-49
    • Majid, M.Z.1    McCaffer, R.2
  • 10
    • 84993012246 scopus 로고    scopus 로고
    • A decision support tool for construction bidding
    • Marzouk, M., and Moselhi, O. (2003). "A Decision Support Tool for Construction Bidding", Construction Innovation, Vol. 3, No. 2, pp. 111-124.
    • (2003) Construction Innovation , vol.3 , Issue.2 , pp. 111-124
    • Marzouk, M.1    Moselhi, O.2
  • 12
    • 13944275955 scopus 로고    scopus 로고
    • Evaluating Risk in Construction-Schedule Model (ERIC-S): Construction schedule risk model
    • Nasir, D., B. McCabe, and L. Hartono, (2003). "Evaluating Risk in Construction-Schedule Model (ERIC-S): Construction Schedule Risk Model", Journal of Construction Engineering and Management", Vol. 129, No. 5, pp. 518-527.
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 518-527
    • Nasir, D.1    McCabe, B.2    Hartono, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.