메뉴 건너뛰기




Volumn 33, Issue 9, 2006, Pages 2645-2666

Generating labor requirements and rosters for mail handlers using simulation and optimization

Author keywords

Labor requirements; Optimization validation; Shift scheduling; Simulation

Indexed keywords

COMPUTER SIMULATION; COMPUTER WORKSTATIONS; INTEGER PROGRAMMING; MAIL HANDLING; OPTIMIZATION; POSTAL SERVICES;

EID: 30744463897     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2005.02.022     Document Type: Article
Times cited : (20)

References (20)
  • 1
    • 11844300335 scopus 로고    scopus 로고
    • Equipment scheduling at mail processing and distribution centers
    • X. Zhang, and J.F. Bard Equipment scheduling at mail processing and distribution centers IIE Transactions on Scheduling and Logistics 37 2 2005 175 187
    • (2005) IIE Transactions on Scheduling and Logistics , vol.37 , Issue.2 , pp. 175-187
    • Zhang, X.1    Bard, J.F.2
  • 3
    • 0030125115 scopus 로고    scopus 로고
    • Optimal shift scheduling with multiple break windows
    • T. Aykin Optimal shift scheduling with multiple break windows Management Science 42 4 1996 591 602
    • (1996) Management Science , vol.42 , Issue.4 , pp. 591-602
    • Aykin, T.1
  • 4
    • 0021694201 scopus 로고
    • Integrated days off and shift personnel scheduling
    • J. Bailey Integrated days off and shift personnel scheduling Computers and Industrial Engineering 9 4 1985 395 404
    • (1985) Computers and Industrial Engineering , vol.9 , Issue.4 , pp. 395-404
    • Bailey, J.1
  • 7
    • 0017581152 scopus 로고
    • Optimum use of overtime in post offices
    • I.M. McManus Optimum use of overtime in post offices Computers and Operations Research 4 4 1977 271 278
    • (1977) Computers and Operations Research , vol.4 , Issue.4 , pp. 271-278
    • McManus, I.M.1
  • 9
    • 0028479664 scopus 로고
    • Equipment selection and machine scheduling in general mail facilities
    • A.I.Z. Jarrah, J.F. Bard, and A.H. deSilva Equipment selection and machine scheduling in general mail facilities Management Science 40 8 1994 1049 1068
    • (1994) Management Science , vol.40 , Issue.8 , pp. 1049-1068
    • Jarrah, A.I.Z.1    Bard, J.F.2    Desilva, A.H.3
  • 10
    • 0031070705 scopus 로고    scopus 로고
    • Scheduling workforce and workflow in a high volume factory
    • O. Berman, R.C. Larson, and E. Pinker Scheduling workforce and workflow in a high volume factory Management Science 43 2 1997 158 172
    • (1997) Management Science , vol.43 , Issue.2 , pp. 158-172
    • Berman, O.1    Larson, R.C.2    Pinker, E.3
  • 12
    • 0001959696 scopus 로고
    • AT&T's call processing simulator (CAPS) operational design for inbound call centers
    • A. Brigandi, D. Dragon, M. Sheehan, and T. Spencer III AT&T's call processing simulator (CAPS) operational design for inbound call centers Interfaces 24 1 1994 6 28
    • (1994) Interfaces , vol.24 , Issue.1 , pp. 6-28
    • Brigandi, A.1    Dragon, D.2    Sheehan, M.3    Iii, S.T.4
  • 13
    • 0033314095 scopus 로고    scopus 로고
    • Estimating ambulance requirements in Auckland New Zealand
    • Farrington PA, Nembhard HB, Evans J., Sturrock D, editors
    • Henderson SG, Mason AJ. Estimating ambulance requirements in Auckland New Zealand. In: Farrington PA, Nembhard HB, Evans J., Sturrock D, editors. Proceedings of the 1999 Winter Simulation Conference, 1999. p. 1670-4.
    • (1999) Proceedings of the 1999 Winter Simulation Conference , pp. 1670-1674
    • Henderson, S.G.1    Mason, A.J.2
  • 16
    • 0032024716 scopus 로고    scopus 로고
    • Integrated simulation, heuristic and optimisation approaches to staff scheduling
    • A.J. Mason, D.M. Ryan, and D.M. Panton Integrated simulation, heuristic and optimisation approaches to staff scheduling Operations Research 46 2 1998 161 175
    • (1998) Operations Research , vol.46 , Issue.2 , pp. 161-175
    • Mason, A.J.1    Ryan, D.M.2    Panton, D.M.3
  • 17
    • 0040098254 scopus 로고    scopus 로고
    • An integrated labor-management system for Taco Bell
    • J. Hueter, and W. Swart An integrated labor-management system for Taco Bell Interfaces 28 1 1998 75 91
    • (1998) Interfaces , vol.28 , Issue.1 , pp. 75-91
    • Hueter, J.1    Swart, W.2
  • 18
    • 0034075315 scopus 로고    scopus 로고
    • Development of a workforce management system for a customer hotline service
    • C.K.Y. Lin, K.F. Lai, and S.L. Hung Development of a workforce management system for a customer hotline service Computers and Operations Research 27 10 2000 987 1004
    • (2000) Computers and Operations Research , vol.27 , Issue.10 , pp. 987-1004
    • Lin, C.K.Y.1    Lai, K.F.2    Hung, S.L.3
  • 19
    • 4043068023 scopus 로고    scopus 로고
    • Call center staffing with simulation and cutting plane methods
    • J. Atlason, and M.A. Epelman Call center staffing with simulation and cutting plane methods Annals of Operations Research 127 2004 333 358
    • (2004) Annals of Operations Research , vol.127 , pp. 333-358
    • Atlason, J.1    Epelman, M.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.