Volumn 19, Issue 1, 2003, Pages 25-32

Project management actions to improve design phase cost performance

Author keywords

Cost control; Design; Project management

Indexed keywords

COST CONTROL; COST PERFORMANCE; DESIGN PHASE COST PERFORMANCE; DESIGN PROJECTS;

EID: 1542493572     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0742-597X(2003)19:1(25)     Document Type: Article
Times cited : (30)

References (16)
  • 1
    • 0028467091 scopus 로고
    • Improving project management of design
    • Anderson, S. D., and Tucker, R. L. (1994). "Improving project management of design." J. Manage. Eng., 10(4), 35-44.
    • (1994) J. Manage. Eng. , vol.10 , Issue.4 , pp. 35-44
    • Anderson, S.D.1    Tucker, R.L.2
  • 2
    • 22844440688 scopus 로고    scopus 로고
    • Analytical design planning technique (AdePT): A dependency structural matrix tool to schedule the building design process
    • Austin, S., Baldwin, A., Li, B., and Waskett, P. (2000). "Analytical design planning technique (AdePT): A dependency structural matrix tool to schedule the building design process." Constr. Manage. Econom., 18, 173-182.
    • (2000) Constr. Manage. Econom. , vol.18 , pp. 173-182
    • Austin, S.1    Baldwin, A.2    Li, B.3    Waskett, P.4
  • 3
    • 0001641644 scopus 로고    scopus 로고
    • Modelling information flow during conceptual and schematic stages of building design
    • Baldwin, A. N., Austin, S. A., Hassan, T. M., and Thorpe, A. (1999). "Modelling information flow during conceptual and schematic stages of building design." Constr. Manage. Econom., 17, 155-167.
    • (1999) Constr. Manage. Econom. , vol.17 , pp. 155-167
    • Baldwin, A.N.1    Austin, S.A.2    Hassan, T.M.3    Thorpe, A.4
  • 4
    • 0032688614 scopus 로고    scopus 로고
    • Critical success factors for different project objectives
    • Chua, D. K. H., Kog, Y. C., and Loh, P. K. (1999). "Critical success factors for different project objectives." J. Constr. Eng. Manage., 125(3), 142-150.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 142-150
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3
  • 6
    • 0002559243 scopus 로고    scopus 로고
    • Assessing project management maturity
    • Ibbs, C. W., and Kwak, Y. H. (2000a). "Assessing project management maturity." Proj. Manage. J., 31(1), 32-43.
    • (2000) Proj. Manage. J. , vol.31 , Issue.1 , pp. 32-43
    • Ibbs, C.W.1    Kwak, Y.H.2
  • 7
    • 0002559243 scopus 로고    scopus 로고
    • Calculating project management return on investment
    • Ibbs, C. W., and Kwak, Y. H. (2000b). "Calculating project management return on investment." Proj. Manage. J., 31(2), 38-47.
    • (2000) Proj. Manage. J. , vol.31 , Issue.2 , pp. 38-47
    • Ibbs, C.W.1    Kwak, Y.H.2
  • 8
    • 0026172617 scopus 로고
    • Optimal allocation of project management resources for achieving success
    • Jaselskis, E. J., and Ashley, D. B. (1991). "Optimal allocation of project management resources for achieving success." J. Constr. Eng. Manage., 117(2), 321-340.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.2 , pp. 321-340
    • Jaselskis, E.J.1    Ashley, D.B.2
  • 9
  • 10
    • 0035400029 scopus 로고    scopus 로고
    • Productivity oriented analysis of design revisions
    • Manavazhi, M. R., and Xunzhi, Z. (2001). "Productivity oriented analysis of design revisions." Constr. Manage. Econom., 19, 379-391.
    • (2001) Constr. Manage. Econom. , vol.19 , pp. 379-391
    • Manavazhi, M.R.1    Xunzhi, Z.2
  • 11
    • 0022059186 scopus 로고
    • The role of structural factors in determining project management success
    • Might, R. J., and Fisher, W. A. (1985). "The role of structural factors in determining project management success." IEEE Trans. Eng. Manage., 32(2), 71-77.
    • (1985) IEEE Trans. Eng. Manage. , vol.32 , Issue.2 , pp. 71-77
    • Might, R.J.1    Fisher, W.A.2
  • 12
    • 0027623833 scopus 로고
    • Checklist of critical success factors for building projects
    • Pȧrfitt, M. K., and Savivido, V. E. (1993). "Checklist of critical success factors for building projects." J. Manage. Eng., 9(3), 243-249.
    • (1993) J. Manage. Eng. , vol.9 , Issue.3 , pp. 243-249
    • Parfitt, M.K.1    Savivido, V.E.2
  • 13
    • 0017135463 scopus 로고
    • Designing to reduce construction costs
    • Paulson, B. C. (1976). "Designing to reduce construction costs." J. Constr. Div., Am. Soc. Civ. Eng., 102(4), 587-592.
    • (1976) J. Constr. Div., Am. Soc. Civ. Eng. , vol.102 , Issue.4 , pp. 587-592
    • Paulson, B.C.1
  • 14
    • 0023292122 scopus 로고
    • Critical factors in successful project implementation
    • Pinto, J. K., and Slevin, D. P. (1987). "Critical factors in successful project implementation." IEEE Trans. Eng. Manage., 34(1), 22-27.
    • (1987) IEEE Trans. Eng. Manage. , vol.34 , Issue.1 , pp. 22-27
    • Pinto, J.K.1    Slevin, D.P.2
  • 15
    • 0005474505 scopus 로고    scopus 로고
    • Impact of management approach on project interaction and performance
    • Pocock, J. B., Liu, L. Y., and Kim, M. K. (1997). "Impact of management approach on project interaction and performance." J. Constr. Eng. Manage., 123(4), 411-418.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.4 , pp. 411-418
    • Pocock, J.B.1    Liu, L.Y.2    Kim, M.K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.