메뉴 건너뛰기




Volumn 3, Issue 4, 2003, Pages 217-229

Design management in practice: Testing a training initiative to deliver tools and learning

Author keywords

Construction; Design; Industry practice; Management; Process; Tools

Indexed keywords


EID: 84993081841     PISSN: 14714175     EISSN: 14770857     Source Type: Journal    
DOI: 10.1108/14714170310814945     Document Type: Article
Times cited : (12)

References (19)
  • 3
    • 0030093820 scopus 로고    scopus 로고
    • A data flow model to plan and manage the build design process
    • Austin, S.A., Baldwin, A.N. and Newton, A. J. 1996: A data flow model to plan and manage the build design process. Journal of Engineering Design, 7(1), 3–17.
    • (1996) Journal of Engineering Design , vol.7 , Issue.1 , pp. 3-17
    • Austin, S.A.1    Baldwin, A.N.2    Newton, A.J.3
  • 9
    • 0000716911 scopus 로고    scopus 로고
    • Cultural issues in implementing changes to new product development process in a small to medium sized enterprise (SME)
    • Filson, A. and Lewis, A. 2000: Cultural issues in implementing changes to new product development process in a small to medium sized enterprise (SME). Journal of Engineering Design, 11(2), 149–157.
    • (2000) Journal of Engineering Design , vol.11 , Issue.2 , pp. 149-157
    • Filson, A.1    Lewis, A.2
  • 12
    • 0039346545 scopus 로고    scopus 로고
    • Why does industry ignore design science
    • Frost, R.B. 1999. Why does industry ignore design science. Journal of Engineering Design, 10(4), 301–304.
    • (1999) Journal of Engineering Design , vol.10 , Issue.4 , pp. 301-304
    • Frost, R.B.1
  • 14
    • 0346025340 scopus 로고
    • Is flatter better? delayering the management hierarchy. The Institute of Employment Studies
    • London, UK.
    • Kettley, P. 1995: Is flatter better? delayering the management hierarchy. The Institute of Employment Studies, Report 290. London, UK.
    • (1995) Report 290
    • Kettley, P.1
  • 16
    • 1542388637 scopus 로고    scopus 로고
    • Work-group communication patterns in design and build project teams: an investigative framework
    • Moore, D.R. and Dainty, A.R.J. 1999: Work-group communication patterns in design and build project teams: an investigative framework. Journal of Construction Procurement, 6(1), 44–53.
    • (1999) Journal of Construction Procurement , vol.6 , Issue.1 , pp. 44-53
    • Moore, D.R.1    Dainty, A.R.J.2
  • 17
    • 84993028913 scopus 로고
    • The improved planning and management of multi-disciplinary building design
    • Department of Civil and Building Engineering, Loughborough University, Leicestershire.
    • Newton, A.J. 1995: The improved planning and management of multi-disciplinary building design. PhD thesis, Department of Civil and Building Engineering, Loughborough University, Leicestershire.
    • (1995) PhD thesis
    • Newton, A.J.1
  • 19
    • 84882961780 scopus 로고    scopus 로고
    • Construction value management revisited: the designer's role
    • Glasgow Caledonian University, Glasgow, UK, RICS Foundation.
    • Thomson, D.S. and Austin, S.A. 2001: Construction value management revisited: the designer's role. Proceedings of Cobra 2001 Conference, Glasgow Caledonian University, Glasgow, UK, RICS Foundation.
    • (2001) Proceedings of Cobra 2001 Conference
    • Thomson, D.S.1    Austin, S.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.