메뉴 건너뛰기




Volumn 116, Issue 1, 1999, Pages 220-232

Column generation based decomposition algorithm for a parallel machine just-in-time scheduling problem

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; INTEGER PROGRAMMING; JUST IN TIME PRODUCTION; MACHINERY; SCHEDULING; SET THEORY;

EID: 0032641373     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(98)00136-2     Document Type: Article
Times cited : (77)

References (26)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • K.R. Baker, G.D. Scudder, Sequencing with earliness and tardiness penalties: A review, Operations Research 38 (1990).
    • (1990) Operations Research , vol.38
    • Baker, K.R.1    Scudder, G.D.2
  • 3
    • 0027582974 scopus 로고
    • A dual ascent and column generation heuristic for the discrete lotsizing and scheduling problem with setup times
    • D. Cattrysse, M. Salomon, R. Kuik, L.N. van Wassenhove, A dual ascent and column generation heuristic for the discrete lotsizing and scheduling problem with setup times, Management Science 39 (4) (1993) 477-486.
    • (1993) Management Science , vol.39 , Issue.4 , pp. 477-486
    • Cattrysse, D.1    Salomon, M.2    Kuik, R.3    Van Wassenhove, L.N.4
  • 4
    • 0342892237 scopus 로고
    • Machine scheduling, linear programming and list scheduling heuristic
    • Northwestern University, Chicago
    • L.M.A. Chan, P. Kaminsky, A. Muriel, D. Simchi-Levi, Machine scheduling, linear programming and list scheduling heuristic, Technical report, Northwestern University, Chicago, 1995.
    • (1995) Technical Report
    • Chan, L.M.A.1    Kaminsky, P.2    Muriel, A.3    Simchi-Levi, D.4
  • 5
    • 85031622305 scopus 로고    scopus 로고
    • Solving parallel machine scheduling problems by column generation
    • Technical report
    • Z.-L. Chen, W.B. Powell, Solving parallel machine scheduling problems by column generation, Technical report, to appear in INFORMS Journal of Computing.
    • INFORMS Journal of Computing
    • Chen, Z.-L.1    Powell, W.B.2
  • 6
    • 84974859431 scopus 로고
    • A heuristic for common due-date assignment and job scheduling on parallel machines
    • T.C.E. Cheng, A heuristic for common due-date assignment and job scheduling on parallel machines, Journal of Operational Research Society 40 (1989) 1129-1135.
    • (1989) Journal of Operational Research Society , vol.40 , pp. 1129-1135
    • Cheng, T.C.E.1
  • 7
    • 0028445470 scopus 로고
    • Parallel-machine scheduling problems with earliness and tardiness penalties
    • T.C.E. Cheng, Z.-L. Chen, Parallel-machine scheduling problems with earliness and tardiness penalties, Journal of Operational Research Society 45 (1994) 685-695.
    • (1994) Journal of Operational Research Society , vol.45 , pp. 685-695
    • Cheng, T.C.E.1    Chen, Z.-L.2
  • 8
    • 0001391104 scopus 로고
    • Decomposition principle for linear programs
    • G.B. Dantzig, P. Wolfe, Decomposition principle for linear programs, Operations Research 8 (1960) 101-111.
    • (1960) Operations Research , vol.8 , pp. 101-111
    • Dantzig, G.B.1    Wolfe, P.2
  • 9
    • 0027542554 scopus 로고
    • Single-machine scheduling with early and tardy completion costs
    • J.S. Davis, J.J. Kanet, Single-machine scheduling with early and tardy completion costs, Naval Research Logistics 40 (1993) 85-101.
    • (1993) Naval Research Logistics , vol.40 , pp. 85-101
    • Davis, J.S.1    Kanet, J.J.2
  • 10
    • 0028374525 scopus 로고
    • Due-date assignment and early/tardy scheduling on identical parallel machines
    • P. De, J.B. Ghosh, C.E. Wells, Due-date assignment and early/tardy scheduling on identical parallel machines, Naval Research Logistics 41 (1994) 17-32.
    • (1994) Naval Research Logistics , vol.41 , pp. 17-32
    • De, P.1    Ghosh, J.B.2    Wells, C.E.3
  • 11
    • 85042163696 scopus 로고
    • A new optimization algorithm for the vehicle routing problem with time windows
    • M. Desrochers, J. Desrosiers, M. Solomon, A new optimization algorithm for the vehicle routing problem with time windows, Operations Research 40 (1992) 342-354.
    • (1992) Operations Research , vol.40 , pp. 342-354
    • Desrochers, M.1    Desrosiers, J.2    Solomon, M.3
  • 12
    • 0023531467 scopus 로고    scopus 로고
    • Scheduling to a common due date on parallel uniform processors
    • H. Emmons, Scheduling to a common due date on parallel uniform processors, Naval Research Logistics 34 (1987) 803-810.
    • Naval Research Logistics , vol.34 , Issue.1987 , pp. 803-810
    • Emmons, H.1
  • 13
    • 0027886805 scopus 로고
    • Simultaneous optimization of efficiency and performance balance measures in single-machine scheduling problems
    • A. Federgruen, G. Mosheiov, Simultaneous optimization of efficiency and performance balance measures in single-machine scheduling problems, Naval Research Logistics 40 (1993) 951-970.
    • (1993) Naval Research Logistics , vol.40 , pp. 951-970
    • Federgruen, A.1    Mosheiov, G.2
  • 14
    • 0026223840 scopus 로고
    • Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date
    • N.G. Hall, M.E. Posner, Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date, Operations Research 39 (1991) 836-846.
    • (1991) Operations Research , vol.39 , pp. 836-846
    • Hall, N.G.1    Posner, M.E.2
  • 15
    • 0028734441 scopus 로고
    • Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates
    • Y.-D. Kim, C.A. Yano, Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates, Naval Research Logistics 41 (1994) 913-933.
    • (1994) Naval Research Logistics , vol.41 , pp. 913-933
    • Kim, Y.-D.1    Yano, C.A.2
  • 17
    • 0023994772 scopus 로고
    • A new approach for crew pairing problems by column generation with an application to air transport
    • S. Lavoie, M. Minoux, E. Odier, A new approach for crew pairing problems by column generation with an application to air transport, European Journal of Operational Research 35 (1988) 45-58.
    • (1988) European Journal of Operational Research , vol.35 , pp. 45-58
    • Lavoie, S.1    Minoux, M.2    Odier, E.3
  • 18
    • 38249004232 scopus 로고
    • A note on one-processor scheduling with asymmetric earliness and tardiness penalties
    • C.-L. Li, Z.-L. Chen, T.C.E. Cheng, A note on one-processor scheduling with asymmetric earliness and tardiness penalties, Operations Research Letters 13 (1993) 45-48.
    • (1993) Operations Research Letters , vol.13 , pp. 45-48
    • Li, C.-L.1    Chen, Z.-L.2    Cheng, T.C.E.3
  • 19
    • 0029243319 scopus 로고
    • Single-machine scheduling to minimize the weighted number of early and tardy aggreeable jobs
    • C.-L. Li, T.C.E. Cheng, Z.-L. Chen, Single-machine scheduling to minimize the weighted number of early and tardy aggreeable jobs, Computers and Operations Research 22 (1995) 205-219.
    • (1995) Computers and Operations Research , vol.22 , pp. 205-219
    • Li, C.-L.1    Cheng, T.C.E.2    Chen, Z.-L.3
  • 20
    • 0001057578 scopus 로고
    • Error bound of a heuristic for the common due date scheduling problem
    • S.D. Liman, C.Y. Lee, Error bound of a heuristic for the common due date scheduling problem, ORSA Journal on Computing 5 (1993) 420-425.
    • (1993) ORSA Journal on Computing , vol.5 , pp. 420-425
    • Liman, S.D.1    Lee, C.Y.2
  • 21
    • 34249916129 scopus 로고
    • A search heuristic for just-in-time scheduling in parallel machines
    • M. Laguna, J.L.G. Velarde, A search heuristic for just-in-time scheduling in parallel machines, Journal of Intelligent Manufacturing 2 (1991) 253-260.
    • (1991) Journal of Intelligent Manufacturing , vol.2 , pp. 253-260
    • Laguna, M.1    Velarde, J.L.G.2
  • 22
    • 0345044823 scopus 로고
    • A column generation approach to graph coloring
    • Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburgh, PA
    • A. Mehrotra, M.A. Trick, A column generation approach to graph coloring, Technical report, Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburgh, PA, 1993.
    • (1993) Technical Report
    • Mehrotra, A.1    Trick, M.A.2
  • 24
    • 0342553443 scopus 로고
    • Parallel machine scheduling by column generation
    • Center for Operations Research and Econometrics, Université Catholique de Louvain, Belgium
    • J.M. van den Akker, J.A. Hoogeveen, S.L. van de Velde, Parallel machine scheduling by column generation, Technical report, Center for Operations Research and Econometrics, Université Catholique de Louvain, Belgium, 1995.
    • (1995) Technical Report
    • Van Den Akker, J.M.1    Hoogeveen, J.A.2    Van De Velde, S.L.3
  • 25
    • 0012849910 scopus 로고
    • Crew scheduling, cutting stock, and column generation: Solving huge integer programs
    • Ph.D. dissertation, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, Georgia
    • P.H. Vance, Crew scheduling, cutting stock, and column generation: Solving huge integer programs, Technical report, Ph.D. dissertation, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, Georgia, 1993.
    • (1993) Technical Report
    • Vance, P.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.