-
1
-
-
0023861277
-
Multiproduct queueing networks with deterministic routing: Decomposition approach and the notion of interference
-
Bitran, G.R. and Tirupati, D. (1988). "Multiproduct queueing networks with deterministic routing: decomposition approach and the notion of interference." Mgmt. Science (v34), pp75-100.
-
(1988)
Mgmt. Science
, vol.34
, pp. 75-100
-
-
Bitran, G.R.1
Tirupati, D.2
-
3
-
-
0000536278
-
Instability of FIFO queueing network
-
Bramson, M. (1994). "Instability of FIFO queueing network." Annuls of Applied Probability (v4), pp414-431.
-
(1994)
Annuls of Applied Probability
, vol.4
, pp. 414-431
-
-
Bramson, M.1
-
4
-
-
3042627295
-
Performance analysis techniques for IC manufacturing lines
-
Burman, D.Y.; Gurrola-Gal, F.J.; Nozari, A.; Sathaye, S.; and Sitarik, J.P. (1986). "Performance analysis techniques for IC manufacturing lines." AT&T Bell Labs Technical Journal (v65), pp45-56.
-
(1986)
AT&T Bell Labs Technical Journal
, vol.65
, pp. 45-56
-
-
Burman, D.Y.1
Gurrola-Gal, F.J.2
Nozari, A.3
Sathaye, S.4
Sitarik, J.P.5
-
5
-
-
34250125012
-
On queueing network models of flexible manufacturing systems
-
Buzacott, J.A. and Yao, D.D. (1986). "On queueing network models of flexible manufacturing systems." Queueing Systems (v1), pp5-27.
-
(1986)
Queueing Systems
, vol.1
, pp. 5-27
-
-
Buzacott, J.A.1
Yao, D.D.2
-
6
-
-
21144476000
-
Design of manufacturing systems using queueing models
-
Buzacott, J.A. and Shanthikumar, J.G. (1992). "Design of manufacturing systems using queueing models." Queueing Systems (v12), pp135-213.
-
(1992)
Queueing Systems
, vol.12
, pp. 135-213
-
-
Buzacott, J.A.1
Shanthikumar, J.G.2
-
8
-
-
0023981636
-
Empirical evaluation of a queueing network model for semiconductor wafer fabrication
-
Chen, H.; Harrison, J.M.; Mandelbaum, A.; Van Ackere, A.; and Wein, L.M. (1988). "Empirical evaluation of a queueing network model for semiconductor wafer fabrication." Operations Research (v36), pp202-215.
-
(1988)
Operations Research
, vol.36
, pp. 202-215
-
-
Chen, H.1
Harrison, J.M.2
Mandelbaum, A.3
Van Ackere, A.4
Wein, L.M.5
-
9
-
-
0030212054
-
A queueing network model for semiconductor manufacturing
-
Connors, D.P.; Feigin, G.E.; and Yao, D.D. (1996). "A queueing network model for semiconductor manufacturing," IEEE Trans. on Semiconductor Mfg. (v9), pp412-427.
-
(1996)
IEEE Trans. on Semiconductor Mfg.
, vol.9
, pp. 412-427
-
-
Connors, D.P.1
Feigin, G.E.2
Yao, D.D.3
-
10
-
-
0002958880
-
Simulation of VLSI manufacturing areas
-
Dayhoff, J.E. and Atherton, R.W. (1984). "Simulation of VLSI manufacturing areas." VLSI Design, pp84-92.
-
(1984)
VLSI Design
, pp. 84-92
-
-
Dayhoff, J.E.1
Atherton, R.W.2
-
11
-
-
0022992279
-
Signature analysis: Simulation of inventory, cycle time and throughput tradeoffs in wafer fabrication
-
Dayhoff, J.E. and Atherton, R.W. (1986). "Signature analysis: simulation of inventory, cycle time and throughput tradeoffs in wafer fabrication." IEEE Trans. on CHMT (v9), pp498-507.
-
(1986)
IEEE Trans. on CHMT
, vol.9
, pp. 498-507
-
-
Dayhoff, J.E.1
Atherton, R.W.2
-
13
-
-
0000410538
-
Scheduling of re-entrant flow shops
-
Graves, S.C.; Meal, H.C.; Stefek, D.; and Zeghmi, A.H. (1983). "Scheduling of re-entrant flow shops." Journal of Operations Mgmt. (v3), pp197-207.
-
(1983)
Journal of Operations Mgmt.
, vol.3
, pp. 197-207
-
-
Graves, S.C.1
Meal, H.C.2
Stefek, D.3
Zeghmi, A.H.4
-
14
-
-
0001870853
-
Necessary conditions for global stability of multiclass queueing networks
-
Hasenbein, J.J. (1997). "Necessary conditions for global stability of multiclass queueing networks." Operations Research Letters (v21), pp87-94.
-
(1997)
Operations Research Letters
, vol.21
, pp. 87-94
-
-
Hasenbein, J.J.1
-
15
-
-
0032046661
-
Setting WIP levels with statistical throughput control (STC) in CONWIP production lines
-
Hopp, W.J. and Roof, M.L. (1998). "Setting WIP levels with statistical throughput control (STC) in CONWIP production lines." Int'l Journal of Production Research (v36), pp867-882.
-
(1998)
Int'l Journal of Production Research
, vol.36
, pp. 867-882
-
-
Hopp, W.J.1
Roof, M.L.2
-
16
-
-
84963717408
-
DEDS-discrete event dynamic system simulator
-
Taipei, Taiwan: National Taiwan Univ.
-
Hsieh, B.-W.; Hu, M.-D.; Chen, C.-H.; and Chang, S.-C. (1998). "DEDS-discrete event dynamic system simulator." Technical Report. Taipei, Taiwan: National Taiwan Univ.
-
Technical Report
-
-
Hsieh, B.-W.1
Hu, M.-D.2
Chen, C.-H.3
Chang, S.-C.4
-
17
-
-
0000170158
-
Approximate performance modeling and decision making for manufacturing systems: A queueing network optimization framework
-
Kouvelis, P. and Tirupati, D. (1991). "Approximate performance modeling and decision making for manufacturing systems: a queueing network optimization framework." Journal of Intelligent Mfg. (v2), pp107-134.
-
(1991)
Journal of Intelligent Mfg.
, vol.2
, pp. 107-134
-
-
Kouvelis, P.1
Tirupati, D.2
-
18
-
-
21144477219
-
Re-entrant lines
-
Kumar, P.R. (1993). "Re-entrant lines." Queueing Systems (v13), pp87-110.
-
(1993)
Queueing Systems
, vol.13
, pp. 87-110
-
-
Kumar, P.R.1
-
19
-
-
3042576321
-
Adaptive input control for job-shop type production systems with varying demands using inverse queueing network analysis
-
Kuroda, M. and Kawada, A. (1995). "Adaptive input control for job-shop type production systems with varying demands using inverse queueing network analysis." Int'l Journal of Production Economics (v41), pp217-225.
-
(1995)
Int'l Journal of Production Economics
, vol.41
, pp. 217-225
-
-
Kuroda, M.1
Kawada, A.2
-
20
-
-
0008197170
-
Production planning and scheduling practice across the semiconductor industry
-
Berkeley, CA: Univ. of California-Berkeley
-
Leachman, R. (1994). "Production planning and scheduling practice across the semiconductor industry." Technical Report ESRC 94-29/CSM-18. Berkeley, CA: Univ. of California-Berkeley.
-
(1994)
Technical Report
, vol.ESRC 94-29-CSM-18
-
-
Leachman, R.1
-
21
-
-
0030084325
-
Minimum inventory variability schedule with application in semiconductor fabrication
-
Li, S.; Tang, T.; and Collins, D.W. (1996). "Minimum inventory variability schedule with application in semiconductor fabrication." IEEE Trans. on Semiconductor Mfg. (v9), pp145-149.
-
(1996)
IEEE Trans. on Semiconductor Mfg.
, vol.9
, pp. 145-149
-
-
Li, S.1
Tang, T.2
Collins, D.W.3
-
22
-
-
0035342034
-
A total standard WIP estimation method for wafer fabrication
-
Lin, Y. and Lee, C. (2001). "A total standard WIP estimation method for wafer fabrication." European Journal of Operational Research (v131), pp78-94.
-
(2001)
European Journal of Operational Research
, vol.131
, pp. 78-94
-
-
Lin, Y.1
Lee, C.2
-
23
-
-
0024765326
-
A robust production control policy for VLSI wafer fabrication
-
Lou, S.X.C. and Kager, P.W. (1989). "A robust production control policy for VLSI wafer fabrication." IEEE Trans. on Semiconductor Mfg. (v2), pp159-164.
-
(1989)
IEEE Trans. on Semiconductor Mfg.
, vol.2
, pp. 159-164
-
-
Lou, S.X.C.1
Kager, P.W.2
-
24
-
-
0026369803
-
Distributed scheduling based on due dates and buffer priorities
-
Lu, S.H. and Kumar, P.R. (1991). "Distributed scheduling based on due dates and buffer priorities." IEEE Trans. on Automatic Control (v36). pp1406-1416.
-
(1991)
IEEE Trans. on Automatic Control
, vol.36
, pp. 1406-1416
-
-
Lu, S.H.1
Kumar, P.R.2
-
25
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variance of cycle-times in semiconductor manufacturing plants
-
Lu, S.H.; Ramaswamy, D.; and Kumar, P.R. (1994). "Efficient scheduling policies to reduce mean and variance of cycle-times in semiconductor manufacturing plants." IEEE Trans. on Semiconductor Mfg. (v7), pp374-388.
-
(1994)
IEEE Trans. on Semiconductor Mfg.
, vol.7
, pp. 374-388
-
-
Lu, S.H.1
Ramaswamy, D.2
Kumar, P.R.3
-
26
-
-
0029771094
-
Performance analysis of scheduling policies in re-entrant manufacturing systems
-
Narahari, Y. and Khan, L.M. (1996). "Performance analysis of scheduling policies in re-entrant manufacturing systems." Computers Operations Research (v23), pp37-51.
-
(1996)
Computers Operations Research
, vol.23
, pp. 37-51
-
-
Narahari, Y.1
Khan, L.M.2
-
28
-
-
0001555071
-
A queueing network analyzer for manufacturing
-
Torino, Italy
-
Segal, M. and Whitt, W. (1988). "A queueing network analyzer for manufacturing." Proc. of 12th Int'l Teletraffic Conf., Torino, Italy, pp1146-1152.
-
(1988)
Proc. of 12th Int'l Teletraffic Conf.
, pp. 1146-1152
-
-
Segal, M.1
Whitt, W.2
-
29
-
-
0028525902
-
First come, first served' can be unstable!
-
Seidman, T.I. (1994). "'First come, first served' can be unstable!" IEEE Trans. on Automatic Control (v39), pp2166-2171.
-
(1994)
IEEE Trans. on Automatic Control
, vol.39
, pp. 2166-2171
-
-
Seidman, T.I.1
-
30
-
-
0030413154
-
FASE: A scheduling environment for semiconductor fabrication
-
Austin, TX
-
Shiu, J.; Hwang, T.-K.; Huang, Y.-W.; Tsai, C.-M.; Su, W.-M.; Cheng, Y.; Chang, S.-C.; and Chien, C.-C. (1996). "FASE: a scheduling environment for semiconductor fabrication." Proc. of 19th Int'l Electronics Mfg. Technology Symp., Austin, TX, pp34-41.
-
(1996)
Proc. of 19th Int'l Electronics Mfg. Technology Symp.
, pp. 34-41
-
-
Shiu, J.1
Hwang, T.-K.2
Huang, Y.-W.3
Tsai, C.-M.4
Su, W.-M.5
Cheng, Y.6
Chang, S.-C.7
Chien, C.-C.8
-
31
-
-
0020848139
-
The queueing network analyzer
-
Whitt, W. (1983). "The queueing network analyzer." Bell System Technical Journal (v62, n9), pp2779-2815.
-
(1983)
Bell System Technical Journal
, vol.62
, Issue.9
, pp. 2779-2815
-
-
Whitt, W.1
-
32
-
-
84986958774
-
Approximations for the GI/G/m queue
-
Whitt, W. (1993). "Approximations for the GI/G/m queue." Production and Operations Mgmt. (v2), pp114-161.
-
(1993)
Production and Operations Mgmt.
, vol.2
, pp. 114-161
-
-
Whitt, W.1
-
33
-
-
0003971554
-
TSS: A daily production target setting system for foundry fabs
-
Tokyo
-
Wu, G.-L.; Wei, K.; Tsai, C.-Y.; Chang, S.-C.; Wang, N.-J.; Tsai, R.-L.; and Liu, H.-P. (1998). "TSS: a daily production target setting system for foundry fabs." Proc. of Int'l Symp. on Semiconductor Mfg., Tokyo, pp75-78.
-
(1998)
Proc. of Int'l Symp. on Semiconductor Mfg.
, pp. 75-78
-
-
Wu, G.-L.1
Wei, K.2
Tsai, C.-Y.3
Chang, S.-C.4
Wang, N.-J.5
Tsai, R.-L.6
Liu, H.-P.7
|