메뉴 건너뛰기




Volumn 24, Issue 4, 2002, Pages 431-448

Solving planning and scheduling problems with combined integer and constraint programming

Author keywords

Decision support systems; Hybrid methods; Production planning; Scheduling

Indexed keywords


EID: 0442268855     PISSN: 01716468     EISSN: None     Source Type: Journal    
DOI: 10.1007/s00291-002-0107-1     Document Type: Article
Times cited : (56)

References (15)
  • 2
    • 0346348649 scopus 로고    scopus 로고
    • Lot-sizing problems: Modelling issues and a specialised branch-and-cut system bc-prod
    • Université Catholique de Louvain, Louvain-la-Neuve, Belgium
    • Belvaux G, Wolsey LA (1999) Lot-sizing problems: modelling issues and a specialised branch-and-cut system bc-prod. CORE Discussion Paper 9849 09/1998. Université Catholique de Louvain, Louvain-la-Neuve, Belgium
    • (1999) CORE Discussion Paper 9849 09/1998
    • Belvaux, G.1    Wolsey, L.A.2
  • 3
    • 0442267314 scopus 로고    scopus 로고
    • An integrated system solution for supply chain optimization in the chemical process industry
    • Berning G, Brandenburg M, Gürsoy K, Mehta V, Tölle FJ (2002) An integrated system solution for supply chain optimization in the chemical process industry. OR Spectrum 24: 371-401
    • (2002) OR Spectrum , vol.24 , pp. 371-401
    • Berning, G.1    Brandenburg, M.2    Gürsoy, K.3    Mehta, V.4    Tölle, F.J.5
  • 4
    • 0000397138 scopus 로고    scopus 로고
    • Branch-and-infer: A unifying framework for integer and finite domain constraint programming
    • Bockmayr A, Kasper T (1998) Branch-and-infer: A unifying framework for integer and finite domain constraint programming. Informs Journal of Computing 10(3): 287-300
    • (1998) Informs Journal of Computing , vol.10 , Issue.3 , pp. 287-300
    • Bockmayr, A.1    Kasper, T.2
  • 7
    • 19044376949 scopus 로고    scopus 로고
    • Campaign planning for multi-stage batch processes in the chemical industry
    • Grunow M, Günther HO, Lehmann M (2002) Campaign planning for multi-stage batch processes in the chemical industry. OR Spectrum 24: 281-314
    • (2002) OR Spectrum , vol.24 , pp. 281-314
    • Grunow, M.1    Günther, H.O.2    Lehmann, M.3
  • 9
    • 0035566131 scopus 로고    scopus 로고
    • A declarative modeling framework that integrates solution methods
    • Hooker JN, Kim HJ, Ottosson G (1998) A declarative modeling framework that integrates solution methods. Annals of Operations Research 104: 141-161
    • (1998) Annals of Operations Research , vol.104 , pp. 141-161
    • Hooker, J.N.1    Kim, H.J.2    Ottosson, G.3
  • 11
    • 0010986664 scopus 로고    scopus 로고
    • Algorithms for hybrid MILP/CP models for a class of optimization problems
    • Jain V, Grossmann IE (2001) Algorithms for hybrid MILP/CP models for a class of optimization problems. INFORMS Journal of Computing 13: 258-276
    • (2001) INFORMS Journal of Computing , vol.13 , pp. 258-276
    • Jain, V.1    Grossmann, I.E.2
  • 12
    • 0442264226 scopus 로고    scopus 로고
    • Planning and scheduling in the process industry
    • Kallrath J (2002) Planning and scheduling in the process industry. OR Spectrum 24: 219-250
    • (2002) OR Spectrum , vol.24 , pp. 219-250
    • Kallrath, J.1
  • 15
    • 0442264225 scopus 로고    scopus 로고
    • Advanced production scheduling for batch plants in process industries
    • Neumann K, Schwindt C, Trautmann N (2002) Advanced production scheduling for batch plants in process industries. OR Spectrum 24: 251-279
    • (2002) OR Spectrum , vol.24 , pp. 251-279
    • Neumann, K.1    Schwindt, C.2    Trautmann, N.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.