-
1
-
-
0007473003
-
Agent-based shop-floor control systems: Solving the assemblies co-ordination problem
-
Capri, Italy
-
Brun, A., and A. Portioli (1998). Agent-based shop-floor control systems: Solving the assemblies co-ordination problem, Proceedings of ICME '98, CIRP International Seminar on Intelligent Computation in Manufacturing Engineering, Capri, Italy, 607-614
-
(1998)
Proceedings of ICME '98, CIRP International Seminar on Intelligent Computation in Manufacturing Engineering
, pp. 607-614
-
-
Brun, A.1
Portioli, A.2
-
2
-
-
0020504370
-
Negotiation as a metaphor for distributed problem-solving
-
Davis R., Smith R. (1983). Negotiation as a metaphor for distributed problem-solving, Artificial Intelligence, 20, 63-109
-
(1983)
Artificial Intelligence
, vol.20
, pp. 63-109
-
-
Davis, R.1
Smith, R.2
-
3
-
-
0023562543
-
Distributed problem-solving techniques: A survey
-
Decker, K.S. (1987). Distributed problem-solving techniques: A survey, IEEE Transactions on Systems, Man, and Cybernetics, 17: 729-740.
-
(1987)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.17
, pp. 729-740
-
-
Decker, K.S.1
-
4
-
-
0027608514
-
Scheduling for machining and assembly in a job-shop environment
-
Doctor, S.R., Cavalier, T.M., Egbelu, P.J., 1993, Scheduling for machining and assembly in a job-shop environment. International Journal of Production Research, Vol. 31, no.6, 1275-1297.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.6
, pp. 1275-1297
-
-
Doctor, S.R.1
Cavalier, T.M.2
Egbelu, P.J.3
-
5
-
-
0024680497
-
Due date assignment in a multistage job shop
-
Fry, T.D., Philipoom, P.R., Markland, R.E., 1989b, Due date assignment in a multistage job shop. IIE Transactions, Vol. 21, N. 2, pp. 153-161.
-
(1989)
IIE Transactions
, vol.21
, Issue.2
, pp. 153-161
-
-
Fry, T.D.1
Philipoom, P.R.2
Markland, R.E.3
-
6
-
-
0024702296
-
Evaluating the impact of operating environments on MRP system nervousness
-
Ho, C., 1989. Evaluating the impact of operating environments on MRP system nervousness: International Journal of Production Research 27 (1): 1115-1135.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.1
, pp. 1115-1135
-
-
Ho, C.1
-
7
-
-
84950937653
-
Integrated shop-floor control using autonomous agents
-
Lin, G. Y., and Solberg, J.J. (1992). Integrated shop-floor control using autonomous agents, IIE Transactions, 24, 3.
-
(1992)
IIE Transactions
, vol.24
, pp. 3
-
-
Lin, G.Y.1
Solberg, J.J.2
-
10
-
-
0026140380
-
A Preliminary investigation of multi-attribute based sequencing rules for assembly shops
-
Philipoom, P.R., Russel, R.S., Fry, T.D., 1991, A Preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research, Vol. 29, no.4, 739-753.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.4
, pp. 739-753
-
-
Philipoom, P.R.1
Russel, R.S.2
Fry, T.D.3
-
11
-
-
0028709244
-
Negotiation in multi-agent based dynamic scheduling
-
Rabelo, R.J., and Camarinha-Matos, L.M. (1994). Negotiation in multi-agent based dynamic scheduling, Robotics and Computer Integrated Manufacturing, Vol. 11, No.4.
-
(1994)
Robotics and Computer Integrated Manufacturing
, vol.11
, Issue.4
-
-
Rabelo, R.J.1
Camarinha-Matos, L.M.2
-
12
-
-
84985747359
-
An evaluation of sequencing rules for assembly shops
-
Russel, R., Taylor III, B., 1985, An evaluation of sequencing rules for assembly shops. Decision Sciences, Vol. 16, 196-212.
-
(1985)
Decision Sciences
, vol.16
, pp. 196-212
-
-
Russel, R.1
Taylor B. III2
|