메뉴 건너뛰기




Volumn 43, Issue 18, 2005, Pages 3933-3953

Availability-adjusted X-factor

Author keywords

Availability; Capacity constraints; Cycle time performance; X factor theory

Indexed keywords

OPTIMIZATION; PERFORMANCE; RESOURCE ALLOCATION;

EID: 27944480413     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500140948     Document Type: Article
Times cited : (9)

References (24)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., Balas, E. and Zawack, D., The shifting bottleneck procedure for job shop scheduling. Manage. Sci., 1988, 34, 391-401.
    • (1988) Manage. Sci. , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 5
    • 4544283224 scopus 로고    scopus 로고
    • Wright Williams & Kelly
    • Factory Explorer®, v.2.8., Wright Williams & Kelly, 2003. Available online at: http://www.wwk.com (accessed 3 July 2003).
    • (2003) Factory Explorer®, V.2.8
  • 7
    • 27944510295 scopus 로고    scopus 로고
    • Modeling and Analysis for Semiconductor Manufacturing Laboratory web site, Arizona State University, Tempe, AZ
    • Fowler, J., SEMATECH Dataset 1, Modeling and Analysis for Semiconductor Manufacturing Laboratory web site, Arizona State University, Tempe, AZ, 2003. Available online at: http://www.eas.asu.edu/~masmlab/ (accessed 20 May 2003).
    • (2003) SEMATECH Dataset 1
    • Fowler, J.1
  • 12
    • 0035421261 scopus 로고    scopus 로고
    • Optimized operations by extended X-factor theory including unit hours concept
    • Kishimoto, M., Ozawa, K., Watanabe, K. and Martin, D.P., Optimized operations by extended X-factor theory including unit hours concept. IEEE Trans. Semicond. Manuf., 2001, 14, 187-195.
    • (2001) IEEE Trans. Semicond. Manuf. , vol.14 , pp. 187-195
    • Kishimoto, M.1    Ozawa, K.2    Watanabe, K.3    Martin, D.P.4
  • 13
    • 0036468738 scopus 로고    scopus 로고
    • Experimental study on input and bottleneck scheduling for a semiconductor fabrication line
    • Lee, Y.H., Park, J. and Kim, S., Experimental study on input and bottleneck scheduling for a semiconductor fabrication line. IIE Trans., 2002, 34, 179-190.
    • (2002) IIE Trans. , vol.34 , pp. 179-190
    • Lee, Y.H.1    Park, J.2    Kim, S.3
  • 15
    • 0032255819 scopus 로고    scopus 로고
    • The advantages of using short cycle time manufacturing (SCM) instead of continuous flow manufacturing (CFM)
    • Martin, D.P., The advantages of using short cycle time manufacturing (SCM) instead of continuous flow manufacturing (CFM), in 1998 IEEE/SEMI Advanced Semiconductor Manufacturing Conference (ASMC), 1998, pp. 43-49.
    • (1998) 1998 IEEE/SEMI Advanced Semiconductor Manufacturing Conference (ASMC) , pp. 43-49
    • Martin, D.P.1
  • 23
  • 24
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • Wein, L.M., Scheduling semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf., 1988, 1, 115-130.
    • (1988) IEEE Trans. Semicond. Manuf. , vol.1 , pp. 115-130
    • Wein, L.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.