메뉴 건너뛰기




Volumn , Issue , 2005, Pages 1123-1128

Agent-based scheduling mechanism for semiconductor manufacturing systems with temporal constraints

Author keywords

Hard temporal constraints; Multi agent systems; Real time scheduling; Semiconductor manufacturing system

Indexed keywords

COMPUTER ARCHITECTURE; CONSTRAINT THEORY; POLYNOMIALS; SCHEDULING; SEMICONDUCTOR MATERIALS;

EID: 27744525313     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (8)
  • 1
    • 0032000755 scopus 로고    scopus 로고
    • Cyclic scheduling of a hoist with time window constraints
    • H. Chen, C. Chu, and J. M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Transactions on Robotics and Automation, vol. 14, no. 1, pp. 144-152, 1998.
    • (1998) IEEE Transactions on Robotics and Automation , vol.14 , Issue.1 , pp. 144-152
    • Chen, H.1    Chu, C.2    Proth, J.M.3
  • 5
    • 0028320392 scopus 로고
    • Scheduling algorithm and operating systems support for real-time systems
    • K. Ramamritham and J. A. Stankovic, "Scheduling algorithm and operating systems support for real-time systems," Proceedings of the IEEE, vol. 82, no. 1, pp. 55-67, 1994.
    • (1994) Proceedings of the IEEE , vol.82 , Issue.1 , pp. 55-67
    • Ramamritham, K.1    Stankovic, J.A.2
  • 7
    • 0036200385 scopus 로고    scopus 로고
    • Distributed manufacturing scheduling using intelligent agents
    • W. Shen, "Distributed manufacturing scheduling using intelligent agents," IEEE Intelligent Systems, vol. 17, no. 1, pp. 88-94, 2002.
    • (2002) IEEE Intelligent Systems , vol.17 , Issue.1 , pp. 88-94
    • Shen, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.