-
2
-
-
0019582153
-
A comparison of due-date selection rules
-
Baker K.R., Bertrand J.W.M. A comparison of due-date selection rules. AIIE Transactions. 13(2):1981;123-131.
-
(1981)
AIIE Transactions
, vol.13
, Issue.2
, pp. 123-131
-
-
Baker, K.R.1
Bertrand, J.W.M.2
-
4
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
Baker K.R., Scudder G.D. Sequencing with earliness and tardiness penalties: A review. Operations Research. 38:1990;22-36.
-
(1990)
Operations Research
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
5
-
-
0001558332
-
Scheduling to minimize the number of late jobs when set-up and processing times are uncertain
-
Balut S.J. Scheduling to minimize the number of late jobs when set-up and processing times are uncertain. Management Science. 19:1973;1283-1288.
-
(1973)
Management Science
, vol.19
, pp. 1283-1288
-
-
Balut, S.J.1
-
6
-
-
0002098611
-
The use of workload information to control job lateness in controlled and uncontrolled release production systems
-
Bertrand J.W.M. The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management. 3:1983;79-92.
-
(1983)
Journal of Operations Management
, vol.3
, pp. 79-92
-
-
Bertrand, J.W.M.1
-
7
-
-
0021428249
-
Optimal due-date determination and sequencing of n jobs on a single machine
-
Cheng T.C.E. Optimal due-date determination and sequencing of n jobs on a single machine. Journal of the Operational Research Society. 35:1984;433-437.
-
(1984)
Journal of the Operational Research Society
, vol.35
, pp. 433-437
-
-
Cheng, T.C.E.1
-
8
-
-
0022083747
-
Analytical determination of optimal TWK due-date in a job shop
-
Cheng T.C.E. Analytical determination of optimal TWK due-date in a job shop. International Journal of Systems Science. 16:1985;777-787.
-
(1985)
International Journal of Systems Science
, vol.16
, pp. 777-787
-
-
Cheng, T.C.E.1
-
9
-
-
0022769182
-
Optimal due-date assignment for a single machine sequencing problem with random processing times
-
Cheng T.C.E. Optimal due-date assignment for a single machine sequencing problem with random processing times. International Journal of Systems Science. 17:1986;1039-1144.
-
(1986)
International Journal of Systems Science
, vol.17
, pp. 1039-1144
-
-
Cheng, T.C.E.1
-
10
-
-
0023436606
-
An algorithm for the CON due-date determination and sequencing problem
-
Cheng T.C.E. An algorithm for the CON due-date determination and sequencing problem. Computers and Operations Research. 14:1987;537-542.
-
(1987)
Computers and Operations Research
, vol.14
, pp. 537-542
-
-
Cheng, T.C.E.1
-
11
-
-
0026142578
-
Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine
-
Cheng T.C.E. Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine. European Journal of Operational Research. 51:1991;348-353.
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 348-353
-
-
Cheng, T.C.E.1
-
12
-
-
0024303531
-
Survey of scheduling research involving due-date determination decisions
-
Cheng T.C.E., Gupta M.C. Survey of scheduling research involving due-date determination decisions. European Journal of Operational Research. 38:1989;156-166.
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
13
-
-
0001173515
-
Priority dispatching and job lateness in a job shop
-
Conway R.W. Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering. 16:1965;228-237.
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 228-237
-
-
Conway, R.W.1
-
14
-
-
0004113622
-
-
Addison-Wesley, Reading, MA
-
Conway, R.W., Maxwell, W.L., Miller, L.W., 1967. Theory of Scheduling. Addison-Wesley, Reading, MA.
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
15
-
-
0017460225
-
Minimizing waiting time variance in the single machine problem
-
Eilon S., Chowdhury I.G. Minimizing waiting time variance in the single machine problem. Management Science. 23:1977;567-575.
-
(1977)
Management Science
, vol.23
, pp. 567-575
-
-
Eilon, S.1
Chowdhury, I.G.2
-
16
-
-
0009377460
-
Job shop dispatching rules using various delivery date setting criteria
-
Elvers D.A. Job shop dispatching rules using various delivery date setting criteria. Production and Inventory Management. 14:1973;62-70.
-
(1973)
Production and Inventory Management
, vol.14
, pp. 62-70
-
-
Elvers, D.A.1
-
17
-
-
0002626852
-
Understanding and applying constraint management in today's manufacturing environments
-
Fawcett S.E., Pearson J.N. Understanding and applying constraint management in today's manufacturing environments. Production and Inventory Management Journal. 32:1991;46-55.
-
(1991)
Production and Inventory Management Journal
, vol.32
, pp. 46-55
-
-
Fawcett, S.E.1
Pearson, J.N.2
-
18
-
-
0004127616
-
-
Computer Science Press, Rockville, MD
-
Horowitz, E., Sahni, S., 1983. Fundamentals of Data Structures. Computer Science Press, Rockville, MD.
-
(1983)
Fundamentals of Data Structures
-
-
Horowitz, E.1
Sahni, S.2
-
19
-
-
0015681904
-
A economic evaluation of job shop dispatching rules
-
Jones C.H. A economic evaluation of job shop dispatching rules. Management Science. 20:1987;293-303.
-
(1987)
Management Science
, vol.20
, pp. 293-303
-
-
Jones, C.H.1
-
20
-
-
0019702937
-
Minimizing the average deviation of job completion times about a common due-date
-
Kanet J.J. Minimizing the average deviation of job completion times about a common due-date. Naval Research Logistics Quarterly. 28:1981;643-651.
-
(1981)
Naval Research Logistics Quarterly
, vol.28
, pp. 643-651
-
-
Kanet, J.J.1
-
22
-
-
0023310940
-
Lot sizes, lead times and in-process inventories
-
Karmarkar U.S. Lot sizes, lead times and in-process inventories. Management Science. 33:1987;409-418.
-
(1987)
Management Science
, vol.33
, pp. 409-418
-
-
Karmarkar, U.S.1
-
23
-
-
0001258516
-
On Balut's algorithm and NP-completeness for a chance-constrained scheduling problem
-
Kise H., Ibaraki T. On Balut's algorithm and NP-completeness for a chance-constrained scheduling problem. Management Science. 29:1983;384-388.
-
(1983)
Management Science
, vol.29
, pp. 384-388
-
-
Kise, H.1
Ibaraki, T.2
-
25
-
-
0020103079
-
Common due-date assignment to minimize total penalty for the one machine scheduling problem
-
Panwalkar S., Smith M., Seidmann A. Common due-date assignment to minimize total penalty for the one machine scheduling problem. Operations Research. 30:1982;391-399.
-
(1982)
Operations Research
, vol.30
, pp. 391-399
-
-
Panwalkar, S.1
Smith, M.2
Seidmann, A.3
-
27
-
-
0026123423
-
Sequencing jobs on a single machine with a common due-date and stochastic processing times
-
Sarin S.C., Erel E., Steiner G. Sequencing jobs on a single machine with a common due-date and stochastic processing times. European Journal of Operational Research. 51:1991;188-198.
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 188-198
-
-
Sarin, S.C.1
Erel, E.2
Steiner, G.3
-
29
-
-
0002501521
-
A state-of-art survey of static scheduling research involving due-dates
-
Sen T., Gupta S.K. A state-of-art survey of static scheduling research involving due-dates. OMEGA. 12(1):1984;63-74.
-
(1984)
OMEGA
, vol.12
, Issue.1
, pp. 63-74
-
-
Sen, T.1
Gupta, S.K.2
-
30
-
-
0001897929
-
Single machine scheduling with earliness and tardiness penalties
-
Sidney J.B. Single machine scheduling with earliness and tardiness penalties. Operations Research. 25:1977;62-69.
-
(1977)
Operations Research
, vol.25
, pp. 62-69
-
-
Sidney, J.B.1
-
31
-
-
0011076730
-
Characteristics of US flexible manufacturing system - A survey
-
In: Stecke K.E., Suri R., (Eds.), Elsevier, Amsterdam
-
Smith, M.L., Dudek, R.A., Blair, E.L., 1986. Characteristics of US flexible manufacturing system - A survey. In: Stecke K.E., Suri R., (Eds.), Flexible Manufacturing Systems. Elsevier, Amsterdam.
-
(1986)
Flexible Manufacturing Systems
-
-
Smith, M.L.1
Dudek, R.A.2
Blair, E.L.3
-
33
-
-
0028768513
-
The stochastic single machine scheduling problem with earliness and tardiness costs
-
Soroush H.M., Fredendall L.D. The stochastic single machine scheduling problem with earliness and tardiness costs. European Journal of Operational Research. 77:1994;287-302.
-
(1994)
European Journal of Operational Research
, vol.77
, pp. 287-302
-
-
Soroush, H.M.1
Fredendall, L.D.2
-
35
-
-
0004289658
-
-
South-Western Publishing, Cincinnati, OH
-
Umble, M.M., Srikanth, M.L., 1990. Synchronous Manufacturing. South-Western Publishing, Cincinnati, OH.
-
(1990)
Synchronous Manufacturing
-
-
Umble, M.M.1
Srikanth, M.L.2
-
36
-
-
0016984996
-
A simulation study of operating policies in a hypothetical dual-constrained job shop
-
Week J.K., Fryer J.S. A simulation study of operating policies in a hypothetical dual-constrained job shop. Management Science. 22:1976;1362-1371.
-
(1976)
Management Science
, vol.22
, pp. 1362-1371
-
-
Week, J.K.1
Fryer, J.S.2
|