메뉴 건너뛰기




Volumn 113, Issue 2, 1999, Pages 450-468

Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs

Author keywords

Due date; Production; Sequencing; Single machine; Stochastic

Indexed keywords

COMPUTATIONAL METHODS; COSTS; CRITICAL PATH ANALYSIS; DECISION THEORY; HEURISTIC METHODS; MATHEMATICAL MODELS; OPTIMIZATION; PERT; PROCESS CONTROL; RANDOM PROCESSES; SCHEDULING;

EID: 0033102034     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0377-2217(98)00003-4     Document Type: Article
Times cited : (66)

References (37)
  • 2
    • 0019582153 scopus 로고
    • A comparison of due-date selection rules
    • Baker K.R., Bertrand J.W.M. A comparison of due-date selection rules. AIIE Transactions. 13(2):1981;123-131.
    • (1981) AIIE Transactions , vol.13 , Issue.2 , pp. 123-131
    • Baker, K.R.1    Bertrand, J.W.M.2
  • 4
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker K.R., Scudder G.D. Sequencing with earliness and tardiness penalties: A review. Operations Research. 38:1990;22-36.
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 5
    • 0001558332 scopus 로고
    • Scheduling to minimize the number of late jobs when set-up and processing times are uncertain
    • Balut S.J. Scheduling to minimize the number of late jobs when set-up and processing times are uncertain. Management Science. 19:1973;1283-1288.
    • (1973) Management Science , vol.19 , pp. 1283-1288
    • Balut, S.J.1
  • 6
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand J.W.M. The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management. 3:1983;79-92.
    • (1983) Journal of Operations Management , vol.3 , pp. 79-92
    • Bertrand, J.W.M.1
  • 7
    • 0021428249 scopus 로고
    • Optimal due-date determination and sequencing of n jobs on a single machine
    • Cheng T.C.E. Optimal due-date determination and sequencing of n jobs on a single machine. Journal of the Operational Research Society. 35:1984;433-437.
    • (1984) Journal of the Operational Research Society , vol.35 , pp. 433-437
    • Cheng, T.C.E.1
  • 8
    • 0022083747 scopus 로고
    • Analytical determination of optimal TWK due-date in a job shop
    • Cheng T.C.E. Analytical determination of optimal TWK due-date in a job shop. International Journal of Systems Science. 16:1985;777-787.
    • (1985) International Journal of Systems Science , vol.16 , pp. 777-787
    • Cheng, T.C.E.1
  • 9
    • 0022769182 scopus 로고
    • Optimal due-date assignment for a single machine sequencing problem with random processing times
    • Cheng T.C.E. Optimal due-date assignment for a single machine sequencing problem with random processing times. International Journal of Systems Science. 17:1986;1039-1144.
    • (1986) International Journal of Systems Science , vol.17 , pp. 1039-1144
    • Cheng, T.C.E.1
  • 10
    • 0023436606 scopus 로고
    • An algorithm for the CON due-date determination and sequencing problem
    • Cheng T.C.E. An algorithm for the CON due-date determination and sequencing problem. Computers and Operations Research. 14:1987;537-542.
    • (1987) Computers and Operations Research , vol.14 , pp. 537-542
    • Cheng, T.C.E.1
  • 11
    • 0026142578 scopus 로고
    • Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine
    • Cheng T.C.E. Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine. European Journal of Operational Research. 51:1991;348-353.
    • (1991) European Journal of Operational Research , vol.51 , pp. 348-353
    • Cheng, T.C.E.1
  • 12
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due-date determination decisions
    • Cheng T.C.E., Gupta M.C. Survey of scheduling research involving due-date determination decisions. European Journal of Operational Research. 38:1989;156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 13
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a job shop
    • Conway R.W. Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering. 16:1965;228-237.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 228-237
    • Conway, R.W.1
  • 15
    • 0017460225 scopus 로고
    • Minimizing waiting time variance in the single machine problem
    • Eilon S., Chowdhury I.G. Minimizing waiting time variance in the single machine problem. Management Science. 23:1977;567-575.
    • (1977) Management Science , vol.23 , pp. 567-575
    • Eilon, S.1    Chowdhury, I.G.2
  • 16
    • 0009377460 scopus 로고
    • Job shop dispatching rules using various delivery date setting criteria
    • Elvers D.A. Job shop dispatching rules using various delivery date setting criteria. Production and Inventory Management. 14:1973;62-70.
    • (1973) Production and Inventory Management , vol.14 , pp. 62-70
    • Elvers, D.A.1
  • 17
    • 0002626852 scopus 로고
    • Understanding and applying constraint management in today's manufacturing environments
    • Fawcett S.E., Pearson J.N. Understanding and applying constraint management in today's manufacturing environments. Production and Inventory Management Journal. 32:1991;46-55.
    • (1991) Production and Inventory Management Journal , vol.32 , pp. 46-55
    • Fawcett, S.E.1    Pearson, J.N.2
  • 19
    • 0015681904 scopus 로고
    • A economic evaluation of job shop dispatching rules
    • Jones C.H. A economic evaluation of job shop dispatching rules. Management Science. 20:1987;293-303.
    • (1987) Management Science , vol.20 , pp. 293-303
    • Jones, C.H.1
  • 20
    • 0019702937 scopus 로고
    • Minimizing the average deviation of job completion times about a common due-date
    • Kanet J.J. Minimizing the average deviation of job completion times about a common due-date. Naval Research Logistics Quarterly. 28:1981;643-651.
    • (1981) Naval Research Logistics Quarterly , vol.28 , pp. 643-651
    • Kanet, J.J.1
  • 22
    • 0023310940 scopus 로고
    • Lot sizes, lead times and in-process inventories
    • Karmarkar U.S. Lot sizes, lead times and in-process inventories. Management Science. 33:1987;409-418.
    • (1987) Management Science , vol.33 , pp. 409-418
    • Karmarkar, U.S.1
  • 23
    • 0001258516 scopus 로고
    • On Balut's algorithm and NP-completeness for a chance-constrained scheduling problem
    • Kise H., Ibaraki T. On Balut's algorithm and NP-completeness for a chance-constrained scheduling problem. Management Science. 29:1983;384-388.
    • (1983) Management Science , vol.29 , pp. 384-388
    • Kise, H.1    Ibaraki, T.2
  • 24
    • 0002748923 scopus 로고
    • Job-shop scheduling theory: What is relevant?
    • McKay K.N., Safayeni F.R., Buzacott J.A. Job-shop scheduling theory: What is relevant? Interfaces. 18:1988;84-90.
    • (1988) Interfaces , vol.18 , pp. 84-90
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 25
    • 0020103079 scopus 로고
    • Common due-date assignment to minimize total penalty for the one machine scheduling problem
    • Panwalkar S., Smith M., Seidmann A. Common due-date assignment to minimize total penalty for the one machine scheduling problem. Operations Research. 30:1982;391-399.
    • (1982) Operations Research , vol.30 , pp. 391-399
    • Panwalkar, S.1    Smith, M.2    Seidmann, A.3
  • 27
    • 0026123423 scopus 로고
    • Sequencing jobs on a single machine with a common due-date and stochastic processing times
    • Sarin S.C., Erel E., Steiner G. Sequencing jobs on a single machine with a common due-date and stochastic processing times. European Journal of Operational Research. 51:1991;188-198.
    • (1991) European Journal of Operational Research , vol.51 , pp. 188-198
    • Sarin, S.C.1    Erel, E.2    Steiner, G.3
  • 29
    • 0002501521 scopus 로고
    • A state-of-art survey of static scheduling research involving due-dates
    • Sen T., Gupta S.K. A state-of-art survey of static scheduling research involving due-dates. OMEGA. 12(1):1984;63-74.
    • (1984) OMEGA , vol.12 , Issue.1 , pp. 63-74
    • Sen, T.1    Gupta, S.K.2
  • 30
    • 0001897929 scopus 로고
    • Single machine scheduling with earliness and tardiness penalties
    • Sidney J.B. Single machine scheduling with earliness and tardiness penalties. Operations Research. 25:1977;62-69.
    • (1977) Operations Research , vol.25 , pp. 62-69
    • Sidney, J.B.1
  • 31
    • 0011076730 scopus 로고
    • Characteristics of US flexible manufacturing system - A survey
    • In: Stecke K.E., Suri R., (Eds.), Elsevier, Amsterdam
    • Smith, M.L., Dudek, R.A., Blair, E.L., 1986. Characteristics of US flexible manufacturing system - A survey. In: Stecke K.E., Suri R., (Eds.), Flexible Manufacturing Systems. Elsevier, Amsterdam.
    • (1986) Flexible Manufacturing Systems
    • Smith, M.L.1    Dudek, R.A.2    Blair, E.L.3
  • 33
    • 0028768513 scopus 로고
    • The stochastic single machine scheduling problem with earliness and tardiness costs
    • Soroush H.M., Fredendall L.D. The stochastic single machine scheduling problem with earliness and tardiness costs. European Journal of Operational Research. 77:1994;287-302.
    • (1994) European Journal of Operational Research , vol.77 , pp. 287-302
    • Soroush, H.M.1    Fredendall, L.D.2
  • 36
    • 0016984996 scopus 로고
    • A simulation study of operating policies in a hypothetical dual-constrained job shop
    • Week J.K., Fryer J.S. A simulation study of operating policies in a hypothetical dual-constrained job shop. Management Science. 22:1976;1362-1371.
    • (1976) Management Science , vol.22 , pp. 1362-1371
    • Week, J.K.1    Fryer, J.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.