메뉴 건너뛰기




Volumn 168, Issue 3, 2006, Pages 932-951

Generation of assembly graphs by systematic analysis of assembly structures

Author keywords

Assembly line balancing; Assembly sequencing; Binary linear programming; Decision support systems; Disassembly; Graph theory

Indexed keywords

COMBINATORIAL MATHEMATICS; DECISION SUPPORT SYSTEMS; GRAPH THEORY; HEURISTIC METHODS; LINEAR PROGRAMMING; OPERATIONS RESEARCH; PRODUCTION CONTROL;

EID: 25144494888     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2004.07.038     Document Type: Conference Paper
Times cited : (21)

References (37)
  • 9
    • 0037448813 scopus 로고    scopus 로고
    • An enumerative heuristic and reduction methods for the assembly line balancing problem
    • K. Fleszar, and K.S. Hindi An enumerative heuristic and reduction methods for the assembly line balancing problem European Journal of Operational Research 145 3 2003 606 620
    • (2003) European Journal of Operational Research , vol.145 , Issue.3 , pp. 606-620
    • Fleszar, K.1    Hindi, K.S.2
  • 12
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line balancing problem in the presence of task failures
    • A. Güngör, and S.M. Gupta A solution approach to the disassembly line balancing problem in the presence of task failures International Journal of Production Research 39 7 2001 1427 1467
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Güngör, A.1    Gupta, S.M.2
  • 15
    • 0026142590 scopus 로고
    • A correct and complete algorithm for the generation of mechanical assembly sequences
    • L.S. Homem de Mello, and A.C. Sanderson A correct and complete algorithm for the generation of mechanical assembly sequences IEEE Transactions on Robotics and Automation 7 2 1991 228 240
    • (1991) IEEE Transactions on Robotics and Automation , vol.7 , Issue.2 , pp. 228-240
    • De Mello, L.S.H.1    Sanderson, A.C.2
  • 17
    • 0242375773 scopus 로고    scopus 로고
    • On the use of the profit rate function in disassembly process planning
    • F. Jovane, Q. Semeraro, and A. Armillotta On the use of the profit rate function in disassembly process planning The Engineering Economist 43 4 1998 309 330
    • (1998) The Engineering Economist , vol.43 , Issue.4 , pp. 309-330
    • Jovane, F.1    Semeraro, Q.2    Armillotta, A.3
  • 19
    • 0034963174 scopus 로고    scopus 로고
    • Parallel disassembly sequencing with sequence-dependent operation times
    • J.G. Kang, D.H. Lee, P. Xirouchakis, and J.G. Persson Parallel disassembly sequencing with sequence-dependent operation times Annals of CIRP 50 1 2001 343 346
    • (2001) Annals of CIRP , vol.50 , Issue.1 , pp. 343-346
    • Kang, J.G.1    Lee, D.H.2    Xirouchakis, P.3    Persson, J.G.4
  • 20
    • 0037508541 scopus 로고    scopus 로고
    • Assembly line balancing in a mixed-model sequencing environment with synchronous transfers
    • S. KarabatI, and S. SayIn Assembly line balancing in a mixed-model sequencing environment with synchronous transfers European Journal of Operational Research 149 2 2003 417 429
    • (2003) European Journal of Operational Research , vol.149 , Issue.2 , pp. 417-429
    • Karabati, S.1    Sayin, S.2
  • 22
    • 0033358055 scopus 로고    scopus 로고
    • Linear programming in disassembly/clustering sequence generation
    • A.J.D. Lambert Linear programming in disassembly/clustering sequence generation Computers & Industrial Engineering 36 1999 723 738
    • (1999) Computers & Industrial Engineering , vol.36 , pp. 723-738
    • Lambert, A.J.D.1
  • 24
    • 0036721661 scopus 로고    scopus 로고
    • Determining optimum disassembly sequences in electronic equipment
    • A.J.D. Lambert Determining optimum disassembly sequences in electronic equipment Computers & Industrial Engineering 43 2002 553 575
    • (2002) Computers & Industrial Engineering , vol.43 , pp. 553-575
    • Lambert, A.J.D.1
  • 26
    • 0036612491 scopus 로고    scopus 로고
    • Demand-driven disassembly optimisation for electronic consumer goods
    • A.J.D. Lambert, and S.M. Gupta Demand-driven disassembly optimisation for electronic consumer goods Journal of Electronics Manufacturing 11 2 2002 121 135
    • (2002) Journal of Electronics Manufacturing , vol.11 , Issue.2 , pp. 121-135
    • Lambert, A.J.D.1    Gupta, S.M.2
  • 30
    • 0002357908 scopus 로고
    • Assembly partitioning by genetic algorithm for generating assembly sequences efficiently
    • Publication no. 1 of the Japan Society for Precision Engineering
    • Murayama, T., Oba, F., Abe, S., 1994. Assembly partitioning by genetic algorithm for generating assembly sequences efficiently. Advancement of Intelligent Production, Publication no. 1 of the Japan Society for Precision Engineering, pp. 659-700.
    • (1994) Advancement of Intelligent Production , pp. 659-700
    • Murayama, T.1    Oba, F.2    Abe, S.3
  • 32
    • 0001359562 scopus 로고
    • The precedence diagram: A tool for analysis in assembly line balancing
    • T.O. Prenting, and R.M. Battaglin The precedence diagram: a tool for analysis in assembly line balancing The Journal of Industrial Engineering 15 4 1964 208 213
    • (1964) The Journal of Industrial Engineering , vol.15 , Issue.4 , pp. 208-213
    • Prenting, T.O.1    Battaglin, R.M.2
  • 33
    • 0030129093 scopus 로고    scopus 로고
    • Minimal precedence constraints for integrated assembly and execution planning
    • V.N. Rajan, and S.Y. Nof Minimal precedence constraints for integrated assembly and execution planning IEEE Transactions on Robotics and Automation 12 2 1996 175 186
    • (1996) IEEE Transactions on Robotics and Automation , vol.12 , Issue.2 , pp. 175-186
    • Rajan, V.N.1    Nof, S.Y.2
  • 36
    • 0001839895 scopus 로고
    • A combinatorial analysis of enumerative data structures for assembly planning
    • J.D. Wolter A combinatorial analysis of enumerative data structures for assembly planning Journal of Design and Manufacturing 2 2 1992 93 104
    • (1992) Journal of Design and Manufacturing , vol.2 , Issue.2 , pp. 93-104
    • Wolter, J.D.1
  • 37
    • 0026157024 scopus 로고
    • Automatic disassembly and total ordering in three dimensions
    • T.C. Woo, and D. Dutta Automatic disassembly and total ordering in three dimensions Journal of Engineering for Industry 113 1991 207 213
    • (1991) Journal of Engineering for Industry , vol.113 , pp. 207-213
    • Woo, T.C.1    Dutta, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.