메뉴 건너뛰기




Volumn 15, Issue 1, 2004, Pages 42-54

Coordination and control in distributed and agent-based manufacturing systems

Author keywords

Agent based manufacturing systems; Control; Coordination; Distributed manufacturing systems; Interdependence

Indexed keywords

COMPUTER AIDED ENGINEERING; COMPUTER SUPPORTED COOPERATIVE WORK; INTELLIGENT AGENTS; KNOWLEDGE ENGINEERING; MULTI AGENT SYSTEMS; PRODUCTION CONTROL;

EID: 2442657911     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/09537280410001658344     Document Type: Review
Times cited : (50)

References (50)
  • 1
    • 0020183802 scopus 로고
    • Input uncertainty and organizational coordination in hospital emergency units
    • ARGOTE, L., 1982, Input uncertainty and organizational coordination in hospital emergency units. Administrative Science Quarterly, 27(3), 420-434.
    • (1982) Administrative Science Quarterly , vol.27 , Issue.3 , pp. 420-434
    • Argote, L.1
  • 2
    • 0000666664 scopus 로고
    • Designing collaborative systems to support reactive problem-solving in manufacturing
    • S. Y. Nof (ed.) (The Netherlands: Kluwer Academic Publishers)
    • BALAKRISHNAN, A., KALAKOTA, R., WHINSTON, A. B., and OW, P., 1994, Designing collaborative systems to support reactive problem-solving in manufacturing. In S. Y. Nof (ed.) Information and Collaboration Models of integration (The Netherlands: Kluwer Academic Publishers), pp. 105-133.
    • (1994) Information and Collaboration Models of integration , pp. 105-133
    • Balakrishnan, A.1    Kalakota, R.2    Whinston, A.B.3    Ow, P.4
  • 3
    • 0032597111 scopus 로고    scopus 로고
    • Flexible reasoning using sensible agent-based systems: A case study in job flow scheduling
    • BARBER, K. S., LIU, T. H., GOEL, A., and RAMASWAMY, S., 1999, Flexible reasoning using sensible agent-based systems: a case study in job flow scheduling. Production Planning and Control, 10(7), 606-615.
    • (1999) Production Planning and Control , vol.10 , Issue.7 , pp. 606-615
    • Barber, K.S.1    Liu, T.H.2    Goel, A.3    Ramaswamy, S.4
  • 6
    • 0033732676 scopus 로고    scopus 로고
    • Performance comparison and analysis of reactive and planning-based control architectures for manufacturing
    • BRENNAN, R. W., 2000, Performance comparison and analysis of reactive and planning-based control architectures for manufacturing. Robotics & Computer-Integrated Manufacturing, 6(2/3), 191-200.
    • (2000) Robotics & Computer-integrated Manufacturing , vol.6 , Issue.2-3 , pp. 191-200
    • Brennan, R.W.1
  • 8
    • 0242665905 scopus 로고
    • A proposed structure for distributed shopfloor control
    • CROWE, T. J., and STAHLMAN, E. J., 1995, A proposed structure for distributed shopfloor control. Integrated Manufacturing Systems, 6(6), 31-36.
    • (1995) Integrated Manufacturing Systems , vol.6 , Issue.6 , pp. 31-36
    • Crowe, T.J.1    Stahlman, E.J.2
  • 9
    • 44949284972 scopus 로고
    • The evolution of control architectures for automated manufacturing systems
    • DILTS, D. M., BOYD, N. P., and WHORMS, H. H., 1991, The evolution of control architectures for automated manufacturing systems. Journal of Manufacturing Systems, 10(1), 79-93.
    • (1991) Journal of Manufacturing Systems , vol.10 , Issue.1 , pp. 79-93
    • Dilts, D.M.1    Boyd, N.P.2    Whorms, H.H.3
  • 10
    • 0002478039 scopus 로고
    • The emerging theory of manufacturing
    • DRUCKER, P. F., 1990, The emerging theory of manufacturing, Harvard Business Review, 68(3), 94-102.
    • (1990) Harvard Business Review , vol.68 , Issue.3 , pp. 94-102
    • Drucker, P.F.1
  • 11
    • 0025421243 scopus 로고
    • Synthesis of heterarchical manufacturing Systems
    • DUFFIE, N. A., 1990, Synthesis of heterarchical manufacturing Systems. Computers in Industry, 14(1-3), 167-174.
    • (1990) Computers in Industry , vol.14 , Issue.1-3 , pp. 167-174
    • Duffie, N.A.1
  • 13
    • 0026225005 scopus 로고
    • Partial global planning: A coordination framework for distributed hypothesis formation
    • DURFEE, D. H., and LESSER, V. R., 1991, Partial global planning: a coordination framework for distributed hypothesis formation. IEEE Transactions on Systems, Man, and Cybernetics, 21(5), 1167-1183.
    • (1991) IEEE Transactions on Systems, Man, and Cybernetics , vol.21 , Issue.5 , pp. 1167-1183
    • Durfee, D.H.1    Lesser, V.R.2
  • 17
    • 0032202838 scopus 로고    scopus 로고
    • Holonic manufacturing scheduling: Architecture, cooperation mechanism, and implementation
    • Gou, L., LUH, P. B., and KYOYA, Y., 1998, Holonic manufacturing scheduling: architecture, cooperation mechanism, and implementation. Computers in Industry, 37(3), 213-231.
    • (1998) Computers in Industry , vol.37 , Issue.3 , pp. 213-231
    • Gou, L.1    Luh, P.B.2    Kyoya, Y.3
  • 18
    • 0040652192 scopus 로고    scopus 로고
    • An organizational assessment of interfirm coordination modes
    • GRANDORI, A., 1997, An organizational assessment of interfirm coordination modes. Organization Studies. 18(6), 897-925.
    • (1997) Organization Studies , vol.18 , Issue.6 , pp. 897-925
    • Grandori, A.1
  • 19
  • 20
    • 2442716245 scopus 로고
    • Intelligence and cooperation in hierarchical manufacturing systems
    • HATVANY, J., 1985, Intelligence and cooperation in hierarchical manufacturing systems. Manufacturing Systems, Proceedings of the CIRP Seminars, 14(1), 5-10.
    • (1985) Manufacturing Systems, Proceedings of the CIRP Seminars , vol.14 , Issue.1 , pp. 5-10
    • Hatvany, J.1
  • 21
    • 0017320423 scopus 로고
    • Hierarchical integration of production planning and scheduling
    • M. A. Geisler (ed.) (Amsterdam: North-Holland)
    • HAX, A. C., and MEAL, H. C., (1975). Hierarchical integration of production planning and scheduling. In M. A. Geisler (ed.) Studies in Management Science, Vol. I, Logistics (Amsterdam: North-Holland), pp. 53-69.
    • (1975) Studies in Management Science, Vol. I, Logistics , vol.1 , pp. 53-69
    • Hax, A.C.1    Meal, H.C.2
  • 22
    • 0043044736 scopus 로고    scopus 로고
    • Coordination of multiple agents for production management
    • LIU, J. S., and SYCARA, K., 1997, Coordination of multiple agents for production management. Annals of Operations Research, 75, 235-289.
    • (1997) Annals of Operations Research , vol.75 , pp. 235-289
    • Liu, J.S.1    Sycara, K.2
  • 23
    • 0023439933 scopus 로고
    • Modeling coordination in organizations and markets
    • MALONE, T. W., 1987, Modeling coordination in organizations and markets. Management Science, 33(10), 1317-1332.
    • (1987) Management Science , vol.33 , Issue.10 , pp. 1317-1332
    • Malone, T.W.1
  • 24
    • 0028401441 scopus 로고
    • The interdisciplinary study of coordination
    • MALONE, T. W., and CROWSTON, K., 1994, The interdisciplinary study of coordination. ACM Computing Surveys, 26(1), 87-109.
    • (1994) ACM Computing Surveys , vol.26 , Issue.1 , pp. 87-109
    • Malone, T.W.1    Crowston, K.2
  • 27
    • 0032050336 scopus 로고    scopus 로고
    • CAMPS: A constraint-based architecture for multiagent planning and scheduling
    • MIYASHITA, K., 1998, CAMPS: a constraint-based architecture for multiagent planning and scheduling. Journal of Intelligent Manufacturing, 9(2), 147-154 .
    • (1998) Journal of Intelligent Manufacturing , vol.9 , Issue.2 , pp. 147-154
    • Miyashita, K.1
  • 28
    • 0033737716 scopus 로고    scopus 로고
    • A strategic framework for networked manufacturing
    • MONTREUIL, B., FRAYRET, J.-M., and D'AMOURS, S., 2000, A strategic framework for networked manufacturing. Computers in Industry, 43(2/3), 299-317.
    • (2000) Computers in Industry , vol.43 , Issue.2-3 , pp. 299-317
    • Montreuil, B.1    Frayret, J.-M.2    D'Amours, S.3
  • 30
    • 0041375781 scopus 로고    scopus 로고
    • Go to the ant: Engineering principles from natural multi-agent systems
    • PARUNAK, H. V. D., 1997, Go to the ant: engineering principles from natural multi-agent systems. Annals of Operations Research, 75, 69-101.
    • (1997) Annals of Operations Research , vol.75 , pp. 69-101
    • Parunak, H.V.D.1
  • 31
    • 0034205722 scopus 로고    scopus 로고
    • MetaMorph II: An agent-based architecture for distributed intelligent design and manufacturing
    • SHEN, W., MATURANA, F., and NORRIE, D. H., 2000, MetaMorph II: an agent-based architecture for distributed intelligent design and manufacturing. Journal of Intelligent Manufacturing, 11, 237-251.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , pp. 237-251
    • Shen, W.1    Maturana, F.2    Norrie, D.H.3
  • 32
    • 0035127673 scopus 로고    scopus 로고
    • Dynamic manufacturing scheduling using both functional and resource related agents
    • SHEN, W., and NORRIE, D. H., 2001, Dynamic manufacturing scheduling using both functional and resource related agents. Integrated Computer-Aided Engineering, 8(1), 17-30.
    • (2001) Integrated Computer-aided Engineering , vol.8 , Issue.1 , pp. 17-30
    • Shen, W.1    Norrie, D.H.2
  • 35
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed problem solver
    • SMITH, R. G., 1980, The contract net protocol: high-level communication and control in a distributed problem solver. IEEE Transactions on Computers, 29(12), 1104-1113.
    • (1980) IEEE Transactions on Computers , vol.29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 36
    • 0002945729 scopus 로고
    • Future factory system formulated in Japan (1)
    • SUDA, H., 1989, Future factory system formulated in Japan (1). Techno Japan, 22(10), 15-25.
    • (1989) Techno Japan , vol.22 , Issue.10 , pp. 15-25
    • Suda, H.1
  • 37
    • 0001841116 scopus 로고
    • Future factory system formulated in Japan (2)
    • SUDA, H., 1990, Future factory system formulated in Japan (2). Techno Japan, 23(3), 51-61.
    • (1990) Techno Japan , vol.23 , Issue.3 , pp. 51-61
    • Suda, H.1
  • 38
    • 0026103848 scopus 로고
    • Resource allocation in distributed factory scheduling
    • SYCARA, K., ROTH, S., SADEH, N., and Fox, M., 1991, Resource allocation in distributed factory scheduling. IEEE Expert, 6(1), 29-40.
    • (1991) IEEE Expert , vol.6 , Issue.1 , pp. 29-40
    • Sycara, K.1    Roth, S.2    Sadeh, N.3    Fox, M.4
  • 39
    • 0035241047 scopus 로고    scopus 로고
    • Survey of resource allocation methods for distributed manufacturing systems
    • THARUMARAJAH, A., 2001, Survey of resource allocation methods for distributed manufacturing systems. Production Planning and Control, 12(1), 58-68.
    • (2001) Production Planning and Control , vol.12 , Issue.1 , pp. 58-68
    • Tharumarajah, A.1
  • 40
    • 0030721152 scopus 로고    scopus 로고
    • A behaviour-based approach to scheduling in distributed manufacturing systems
    • THARUMARAJAH, A., and WELLS, A. J., 1997, A behaviour-based approach to scheduling in distributed manufacturing systems. Integrated Computer Aided Engineering, 4, 235-249.
    • (1997) Integrated Computer Aided Engineering , vol.4 , pp. 235-249
    • Tharumarajah, A.1    Wells, A.J.2
  • 44
    • 0034251195 scopus 로고    scopus 로고
    • Fault recovery in distributed manufacturing systems by emergent holonic reconfiguration: A fuzzy multi-agent modeling approach
    • ULIERU, M., and NORRIE, D., 2000, Fault recovery in distributed manufacturing systems by emergent holonic reconfiguration: A fuzzy multi-agent modeling approach. Information Sciences, 127(3/4), 101-123.
    • (2000) Information Sciences , vol.127 , Issue.3-4 , pp. 101-123
    • Ulieru, M.1    Norrie, D.2
  • 46
    • 0020800182 scopus 로고
    • Cooperative systems - An evolutionary perspective
    • VÁMOS, T., 1983, Cooperative systems - an evolutionary perspective. IEEE Control Systems Magazine, 3(3), 9-14.
    • (1983) IEEE Control Systems Magazine , vol.3 , Issue.3 , pp. 9-14
    • Vámos, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.