메뉴 건너뛰기




Volumn 35, Issue 3, 2005, Pages 371-381

iShopFloor: An internet-enabled agent-based intelligent shop floor

Author keywords

Agents; eXtensible Markup Language (XML); Intelligent manufacturing; Internet based manufacturing; Manufacturing scheduling; Multiagent systems

Indexed keywords

FACTORY AUTOMATION; INTELLIGENT AGENTS; INTERNET; MULTI AGENT SYSTEMS; NETWORK PROTOCOLS; SCHEDULING; XML;

EID: 23944491877     PISSN: 10946977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCC.2004.843224     Document Type: Article
Times cited : (60)

References (40)
  • 2
    • 0003960789 scopus 로고
    • "Manufacturing control with a market-driven contract net"
    • Ph.D. dissertation, Rensselaer Polytechnic Inst., Troy, NY
    • A. D. Baker, "Manufacturing control with a market-driven contract net," Ph.D. dissertation, Rensselaer Polytechnic Inst., Troy, NY, 1991.
    • (1991)
    • Baker, A.D.1
  • 3
    • 0033312753 scopus 로고    scopus 로고
    • "Agents and the Internet: Infrastructure for mass customization"
    • Sep./Oct.
    • A. D. Baker, H. V. D. Parunak, and K. Erol, "Agents and the Internet: infrastructure for mass customization," IEEE Internet Comput., vol. 3, no. 5, pp. 62-69, Sep./Oct. 1999.
    • (1999) IEEE Internet Comput. , vol.3 , Issue.5 , pp. 62-69
    • Baker, A.D.1    Parunak, H.V.D.2    Erol, K.3
  • 4
    • 0003471733 scopus 로고
    • "An Introduction to STEP"
    • Tech. Rep., VTT Technical Research Centre of Finland and Wix McLelland Ltd., U.K
    • B. Bjork and J. Wix, "An Introduction to STEP," Tech. Rep., VTT Technical Research Centre of Finland and Wix McLelland Ltd., U.K., 1991.
    • (1991)
    • Bjork, B.1    Wix, J.2
  • 5
    • 0034694440 scopus 로고    scopus 로고
    • "Multi-agent hybrid shop floor control system"
    • K. H. Choi, S. C. Kim, and S. H. Yook, "Multi-agent hybrid shop floor control system," Int. J. Prod. Res., vol. 38, no. 17, pp. 4193-4203, 2000.
    • (2000) Int. J. Prod. Res. , vol.38 , Issue.17 , pp. 4193-4203
    • Choi, K.H.1    Kim, S.C.2    Yook, S.H.3
  • 6
    • 0000536995 scopus 로고    scopus 로고
    • "Heterarchical control of highly distributed manufacturing systems"
    • N. A. Duffie and V. V. Prabhu, "Heterarchical control of highly distributed manufacturing systems," Int. J. Comput. Integr. Manuf., vol. 9, no. 4, pp. 270-281, 1996.
    • (1996) Int. J. Comput. Integr. Manuf. , vol.9 , Issue.4 , pp. 270-281
    • Duffie, N.A.1    Prabhu, V.V.2
  • 7
    • 0010822784 scopus 로고    scopus 로고
    • "The National Electronics Manufacturing Initiative's (NEMI) plug and play factory project"
    • A. Dugenske, A. Fraser, T. Nguyen, and R. Voitus, "The National Electronics Manufacturing Initiative's (NEMI) plug and play factory project," Int. J. Comput. Integr. Manuf., vol. 13, no. 3, pp. 225-244, 2000.
    • (2000) Int. J. Comput. Integr. Manuf. , vol.13 , Issue.3 , pp. 225-244
    • Dugenske, A.1    Fraser, A.2    Nguyen, T.3    Voitus, R.4
  • 8
    • 33645432683 scopus 로고    scopus 로고
    • XML Standards Profiles, Prepared for United States Postal Service, Electronic Data Systems Corp. (Nov. 30). [Online]
    • XML Standards Profiles, Prepared for United States Postal Service, Electronic Data Systems Corp. (2000, Nov. 30). http://www.eds.com/ news/XMLStdsProfilePublic.doc [Online]
    • (2000)
  • 9
    • 0003985786 scopus 로고
    • "KQML - A Language and Protocol for Knowledge and Information Exchange"
    • Univ. Maryland, Baltimore, MD, Tech. Rep
    • T. Finin, R. Fritzon, D. McKay, and R. McEntire, "KQML - A Language and Protocol for Knowledge and Information Exchange," Univ. Maryland, Baltimore, MD, Tech. Rep., 1993.
    • (1993)
    • Finin, T.1    Fritzon, R.2    McKay, D.3    McEntire, R.4
  • 11
    • 0001811353 scopus 로고
    • "Logistics Management System (LMS): Integrating decision technologies for dispatch scheduling in semiconductor manufacturing"
    • M. Zweben and M.S. Fox, Eds. San Mateo, CA: Morgan Kaufman
    • K. Fordyce and G. G. Sullivan, "Logistics Management System (LMS): integrating decision technologies for dispatch scheduling in semiconductor manufacturing," in Intelligent Scheduling, M. Zweben and M. S. Fox, Eds. San Mateo, CA: Morgan Kaufman, 1994, pp. 473-516.
    • (1994) Intelligent Scheduling , pp. 473-516
    • Fordyce, K.1    Sullivan, G.G.2
  • 12
    • 33645448115 scopus 로고
    • Information Processing - Text and Office Systems - Standard Generalized Markup Language (SGML), Rep. ISO 8879
    • Information Processing - Text and Office Systems - Standard Generalized Markup Language (SGML), Rep. ISO 8879, 1986.
    • (1986)
  • 13
    • 0029733731 scopus 로고    scopus 로고
    • "A collaborative process planning and scheduling system"
    • J. Kempenaers, J. Pinte, J. Detand, and J. P. Kruth, "A collaborative process planning and scheduling system," Adv. Eng. Softw., vol. 25, no. 1, pp. 3-8, 1996.
    • (1996) Adv. Eng. Softw. , vol.25 , Issue.1 , pp. 3-8
    • Kempenaers, J.1    Pinte, J.2    Detand, J.3    Kruth, J.P.4
  • 15
    • 0005306449 scopus 로고
    • "Feasibility Study: Reference Architecture for Machine Control Systems Integration"
    • NIST Internal Rep., NISTIR 5297
    • T. R. Kramer and M. K. Senehi, "Feasibility Study: Reference Architecture for Machine Control Systems Integration," NIST Internal Rep., NISTIR 5297, 1993.
    • (1993)
    • Kramer, T.R.1    Senehi, M.K.2
  • 16
    • 0027073047 scopus 로고
    • "A CAPP system for nonlinear process plans"
    • J. P. Kruth and J. Detand, "A CAPP system for nonlinear process plans," Ann. CIRP, vol. 41, no. 1, pp. 489-492, 1992.
    • (1992) Ann. CIRP , vol.41 , Issue.1 , pp. 489-492
    • Kruth, J.P.1    Detand, J.2
  • 17
    • 84950937653 scopus 로고
    • "Integrated shop floor control using autonomous agents"
    • G. Y. Lin and J. J. Solberg, "Integrated shop floor control using autonomous agents," IIE Trans., vol. 24, no. 3, pp. 57-71, 1992.
    • (1992) IIE Trans. , vol.24 , Issue.3 , pp. 57-71
    • Lin, G.Y.1    Solberg, J.J.2
  • 18
    • 33645434891 scopus 로고    scopus 로고
    • XML Representation of Process Descriptions. National Inst. Standards Technol. (NIST), U.S. [Online]
    • J. Lubell. (2002) XML Representation of Process Descriptions. National Inst. Standards Technol. (NIST), U.S. [Online] http://ats.nist.gov/psl/ xml/process-descriptions.html
    • (2002)
    • Lubell, J.1
  • 19
    • 79953758495 scopus 로고    scopus 로고
    • "On-line integration of process planning module with production scheduling"
    • A. G. Mamalis, I. Malagardis, and K. Kanbouris, "On-line integration of process planning module with production scheduling," Int. J. Adv. Manuf. Technol., vol. 12, no. 5, pp. 330-338, 1996.
    • (1996) Int. J. Adv. Manuf. Technol. , vol.12 , Issue.5 , pp. 330-338
    • Mamalis, A.G.1    Malagardis, I.2    Kanbouris, K.3
  • 20
    • 0032663605 scopus 로고    scopus 로고
    • "MetaMorph: An adaptive agent-based architecture for intelligent manufacturing"
    • F. Maturana, W. Shen, and D. H. Norrie, "MetaMorph: an adaptive agent-based architecture for intelligent manufacturing," Int. J. Prod. Res., vol. 37, no. 10, pp. 2159-2174, 1999.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.10 , pp. 2159-2174
    • Maturana, F.1    Shen, W.2    Norrie, D.H.3
  • 22
    • 0001538571 scopus 로고
    • "Manufacturing experience with the contract net"
    • M.N. Huhns, Ed. New York: Pitman
    • V. D. Varunak, "Manufacturing experience with the contract net," in Distributed Artificial Intelligence, M. N. Huhns, Ed. New York: Pitman, 1987, pp. 285-310.
    • (1987) Distributed Artificial Intelligence , pp. 285-310
    • Varunak, V.D.1
  • 24
    • 0032648655 scopus 로고    scopus 로고
    • "Integrating flexible process plans with scheduling in flexible manufacturing systems"
    • C. Saygin and S. E. Kilic, "Integrating flexible process plans with scheduling in flexible manufacturing systems," Int. J. Adv. Manuf. Technol., vol. 15, no. 4, pp. 268-280, 1999.
    • (1999) Int. J. Adv. Manuf. Technol. , vol.15 , Issue.4 , pp. 268-280
    • Kilic, C.1    Saygin, S.E.2
  • 25
    • 0005256208 scopus 로고    scopus 로고
    • "Conception et Reélization d'environnement de développement de systèmes d'agents cognitifs"
    • Ph.D. dissertation, Université Technol. Compiègne, Compiègne, France
    • E. Scalabrin, "Conception et Reélization d'environnement de développement de systèmes d'agents cognitifs," Ph.D. dissertation, Université Technol. Compiègne, Compiègne, France, 1996.
    • (1996)
    • Scalabrin, E.1
  • 26
    • 0023830408 scopus 로고
    • "Dynamic scheduling in cellular manufacturing systems: A framework for networked decision making"
    • M. J. Shaw, "Dynamic scheduling in cellular manufacturing systems: a framework for networked decision making," J. Manuf. Syst., vol. 7, no. 2, pp. 83-94, 1988.
    • (1988) J. Manuf. Syst. , vol.7 , Issue.2 , pp. 83-94
    • Shaw, M.J.1
  • 27
    • 85133749042 scopus 로고    scopus 로고
    • "Agent-based systems for intelligent manufacturing: A state-of-the-art survey"
    • W. Shen and D. H. Norrie, "Agent-based systems for intelligent manufacturing: a state-of-the-art survey," Knowl. Inform. Syst., Int. J., vol. 1, no. 2, pp. 129-156, 1999.
    • (1999) Knowl. Inform. Syst., Int. J. , vol.1 , Issue.2 , pp. 129-156
    • Shen, W.1    Norrie, D.H.2
  • 29
    • 0036200385 scopus 로고    scopus 로고
    • "Distributed manufacturing scheduling using intelligent agents"
    • Jan./Feb.
    • W. Shen, "Distributed manufacturing scheduling using intelligent agents," IEEE Intell. Syst., vol. 17, no. 1, pp. 88-94, Jan./ Feb. 2002.
    • (2002) IEEE Intell. Syst. , vol.17 , Issue.1 , pp. 88-94
    • Shen, W.1
  • 30
    • 0036340742 scopus 로고    scopus 로고
    • "Genetic algorithms in agent-based manufacturing scheduling systems"
    • Aug.
    • W. Shen, "Genetic algorithms in agent-based manufacturing scheduling systems," Integrated Comput.-Aided Eng., vol. 9, no. 3, pp. 207-217, Aug. 2002.
    • (2002) Integrated Comput.-Aided Eng. , vol.9 , Issue.3 , pp. 207-217
    • Shen, W.1
  • 32
    • 0019180974 scopus 로고
    • "The contract net protocol: High-level communication and control in a distributed problem solver"
    • Dec.
    • R. G. Smith, "The contract net protocol: high-level communication and control in a distributed problem solver," IEEE Trans. Comput., vol. C-29, no. 12, pp. 1104-1113, Dec. 1980.
    • (1980) IEEE Trans. Comput. , vol.C-29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 33
    • 0032202527 scopus 로고    scopus 로고
    • "Reference architecture for Holonic Manufacturing Systems: PROSA"
    • H. Van Brussel, J. Wyns, P. Valckenaers, and L. Bongaerts, "Reference architecture for Holonic Manufacturing Systems: PROSA," Comput. Ind., vol. 37, pp. 255-274, 1998.
    • (1998) Comput. Ind. , vol.37 , pp. 255-274
    • Brussel, H.1    Wyns, J.2    Valckenaers, P.3    Bongaerts, L.4
  • 34
    • 0031122139 scopus 로고    scopus 로고
    • "Performance analysis of auction-based distributed shop-floor control schemes from the perspective of the communication system"
    • D. Veeramani and K.-J. Wang, "Performance analysis of auction-based distributed shop-floor control schemes from the perspective of the communication system," Int. J. Flexible Manuf. Syst., vol. 9, no. 2, pp. 121-143, 1997.
    • (1997) Int. J. Flexible Manuf. Syst. , vol.9 , Issue.2 , pp. 121-143
    • Veeramani, D.1    Wang, K.-J.2
  • 35
    • 1842741849 scopus 로고    scopus 로고
    • "Material handling problem: FIPA compliant agent implementation"
    • V. Marik et al., Eds.
    • P. Vrba and V. Hrdonka et al., "Material handling problem: FIPA compliant agent implementation," in Proc. Multi-Agent Systems Applications II, V. Marik et al., Eds., 2002, pp. 268-279.
    • (2002) Proc. Multi-Agent Systems Applications II , pp. 268-279
    • Vrba, P.1    Hrdonka, V.2
  • 37
    • 0242576359 scopus 로고    scopus 로고
    • "An adaptive negotiation framework for agent based dynamic manufacturing scheduling"
    • Washington, D.C., Oct. 5-8
    • C. Wang, W. Shen, and H. Ghenniwa, "An adaptive negotiation framework for agent based dynamic manufacturing scheduling," in Proc. IEEE Int. Conf. Systems, Man Cybernetics, Washington, D.C., Oct. 5-8, 2003, pp. 1211-1216.
    • (2003) Proc. IEEE Int. Conf. Systems, Man Cybernetics , pp. 1211-1216
    • Wang, C.1    Shen, W.2    Ghenniwa, H.3
  • 40
    • 0142247355 scopus 로고    scopus 로고
    • "A multi-agent and distributed ruler based approach to production scheduling of agile manufacturing systems"
    • Y. H. Wang, C. W. Yin, and Y. Zhang, "A multi-agent and distributed ruler based approach to production scheduling of agile manufacturing systems," Int. J. Comput. Integr. Manuf., vol. 16, no. 2, pp. 81-92, 2003.
    • (2003) Int. J. Comput. Integr. Manuf. , vol.16 , Issue.2 , pp. 81-92
    • Wang, Y.H.1    Yin, C.W.2    Zhang, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.