메뉴 건너뛰기




Volumn 28, Issue 8, 2004, Pages 1297-1307

An algorithmic framework for improving heuristic solutions: Part II. A new version of the stochastic traveling salesman problem

Author keywords

Combinatorial optimization; Conditional tasks; Heuristics; Markov chain; Scheduling and planning; Stochastic dynamic programming; Traveling salesman problem

Indexed keywords

ALGORITHMS; COMBINATORIAL MATHEMATICS; MARKOV PROCESSES; MATHEMATICAL MODELS; SET THEORY;

EID: 2342458344     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2003.09.002     Document Type: Article
Times cited : (16)

References (23)
  • 4
    • 2342638345 scopus 로고    scopus 로고
    • An algorithmic framework for improving heuristic solutions. Part I. a deterministic discount coupon traveling salseman problem
    • Choi, J., Realff, M. J., & Lee, J. H. (2004). An algorithmic framework for improving heuristic solutions. Part I. A deterministic discount coupon traveling salseman problem. Computers and Chemical Engineering, 28(8), 1285-1296.
    • (2004) Computers and Chemical Engineering , vol.28 , Issue.8 , pp. 1285-1296
    • Choi, J.1    Realff, M.J.2    Lee, J.H.3
  • 5
    • 0028517862 scopus 로고
    • Eunymerative approaches to parallel flowshop scheduling via problem transformation
    • Gooding W.B., Pekny J.F., Mccroskey P.S. Eunymerative approaches to parallel flowshop scheduling via problem transformation. Computers and Chemical Engineering. 18(10):1994;909-927
    • (1994) Computers and Chemical Engineering , vol.18 , Issue.10 , pp. 909-927
    • Gooding, W.B.1    Pekny, J.F.2    McCroskey, P.S.3
  • 6
    • 0031140323 scopus 로고    scopus 로고
    • Global optimization in multiproduct and multipurpose batch design under uncertainty
    • Harding S.T., Floudas C.A. Global optimization in multiproduct and multipurpose batch design under uncertainty. Industrial and Engineering Chemistry Research. 36(5):1997;1644-1664
    • (1997) Industrial and Engineering Chemistry Research , vol.36 , Issue.5 , pp. 1644-1664
    • Harding, S.T.1    Floudas, C.A.2
  • 7
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
    • Ierapertritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Industrial and Engineering Chemistry Research. 37(11):1998a;4341-4359
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , Issue.11 , pp. 4341-4359
    • Ierapertritou, M.G.1    Floudas, C.A.2
  • 8
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes
    • Ierapertritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes. Industrial and Engineering Chemistry Research. 37(11):1998b;4360-4374
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , Issue.11 , pp. 4360-4374
    • Ierapertritou, M.G.1    Floudas, C.A.2
  • 9
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-I. MILP formulation
    • Kondili E., Pantelides C.C., Sargent R.W.H. A general algorithm for short-term scheduling of batch operations-I. MILP formulation. Computers and Chemical Engineering. 17(2):1993;11-227
    • (1993) Computers and Chemical Engineering , vol.17 , Issue.2 , pp. 11-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 11
    • 0002037506 scopus 로고
    • An efficient transformation of the generalized traveling salesman problem
    • Noon C.E., Bean J.C. An efficient transformation of the generalized traveling salesman problem. INFOR. 31(1):1993;39-44
    • (1993) INFOR , vol.31 , Issue.1 , pp. 39-44
    • Noon, C.E.1    Bean, J.C.2
  • 12
    • 0026256602 scopus 로고
    • Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristisc methods
    • Penky J.F., Miller D.L. Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristisc methods. Computers and Chemical Engineering. 15(11):1991;741-748
    • (1991) Computers and Chemical Engineering , vol.15 , Issue.11 , pp. 741-748
    • Penky, J.F.1    Miller, D.L.2
  • 13
    • 0027628281 scopus 로고
    • An exact algorithm for resource constrained sequencing with application to production scheduling under an aggregate deadline
    • Pekny J.F., Miller D.L., Kudva G.K. An exact algorithm for resource constrained sequencing with application to production scheduling under an aggregate deadline. Computers and Chemical Engineering. 17(7):1993;671-682
    • (1993) Computers and Chemical Engineering , vol.17 , Issue.7 , pp. 671-682
    • Pekny, J.F.1    Miller, D.L.2    Kudva, G.K.3
  • 14
    • 0033089833 scopus 로고    scopus 로고
    • The stochastic traveling salesman problem: Finite size scaling and the cavity
    • Percus A.G., Martin O.C. The stochastic traveling salesman problem: finite size scaling and the cavity. Journal of Statistical Physics. 94(5-6):1999;739-758
    • (1999) Journal of Statistical Physics , vol.94 , Issue.56 , pp. 739-758
    • Percus, A.G.1    Martin, O.C.2
  • 15
    • 0031271861 scopus 로고    scopus 로고
    • Multiperiod planning and scheduling of multiproduct batch plants under uncertainty
    • Petkov D.B., Maranas C.D. Multiperiod planning and scheduling of multiproduct batch plants under uncertainty. Industrial and Engineering Chemistry Research. 36(11):1997;4864-4881
    • (1997) Industrial and Engineering Chemistry Research , vol.36 , Issue.11 , pp. 4864-4881
    • Petkov, D.B.1    Maranas, C.D.2
  • 16
    • 0032386621 scopus 로고    scopus 로고
    • Assignment and sequencing models for the scheduling of process systems
    • Pinto J.M., Grossmann I.E. Assignment and sequencing models for the scheduling of process systems. Annals of Operations Research. 81:1998;433-466
    • (1998) Annals of Operations Research , vol.81 , pp. 433-466
    • Pinto, J.M.1    Grossmann, I.E.2
  • 18
    • 0010712530 scopus 로고
    • A sharp deviation inequality for the stochastic taveling saleman problem
    • Rhee W.T., Talagrand M. A sharp deviation inequality for the stochastic taveling saleman problem. Annals of Probability. 17(1):1989;1-8
    • (1989) Annals of Probability , vol.17 , Issue.1 , pp. 1-8
    • Rhee, W.T.1    Talagrand, M.2
  • 21
    • 0000672684 scopus 로고    scopus 로고
    • A simulation-optimization framework for research and development pipeline management
    • Subramanian D., Pekny J.F., Recklaitis G.V. A simulation-optimization framework for research and development pipeline management. AIChE Journal. 47(10):2001;2226-2241
    • (2001) AIChE Journal , vol.47 , Issue.10 , pp. 2226-2241
    • Subramanian, D.1    Pekny, J.F.2    Recklaitis, G.V.3
  • 22
    • 0035904351 scopus 로고    scopus 로고
    • Robust short-term scheduling of multiproduct batch plans under demand uncertainty
    • Vin J.P., Ierapetritou M.G. Robust short-term scheduling of multiproduct batch plans under demand uncertainty. Industrial and Engineering Chemistry Research. 40(21):2001;4543-4554
    • (2001) Industrial and Engineering Chemistry Research , vol.40 , Issue.21 , pp. 4543-4554
    • Vin, J.P.1    Ierapetritou, M.G.2
  • 23
    • 0037110289 scopus 로고    scopus 로고
    • Markovian inventroy policy with application to the paper industry
    • Yin K.K., Liu H., Johnson N.E. Markovian inventroy policy with application to the paper industry. Computers and Chemical Engineering. 26:2002;1399-1413
    • (2002) Computers and Chemical Engineering , vol.26 , pp. 1399-1413
    • Yin, K.K.1    Liu, H.2    Johnson, N.E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.