-
2
-
-
0002444471
-
The cost of non-conformance during a highway project: A case study
-
Abdul-Rahman, H. (1995) The cost of non-conformance during a highway project: a case study, Construction Management and Economics, 13(1), 23-32.
-
(1995)
Construction Management and Economics
, vol.13
, Issue.1
, pp. 23-32
-
-
Abdul-Rahman, H.1
-
4
-
-
2042476824
-
Analysis of quality management systems in the Hong Kong construction industry
-
Cape Town, South Africa
-
Ahmed, S.M. and Aoieong, R.T. (1998) Analysis of quality management systems in the Hong Kong construction industry, Proceedings of the 1st South African International Conference on Total Quality Management in Construction, Cape Town, South Africa, pp. 37-49.
-
(1998)
Proceedings of the 1st South African International Conference on Total Quality Management in Construction
, pp. 37-49
-
-
Ahmed, S.M.1
Aoieong, R.T.2
-
5
-
-
0036499553
-
A process approach in measuring quality costs of construction projects: Model development
-
Aoieong, R.T., Tang, S.L. and Ahmed, S.M. (2002) A process approach in measuring quality costs of construction projects: model development. Construction Management and Economics, 20(2), 179-92.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.2
, pp. 179-192
-
-
Aoieong, R.T.1
Tang, S.L.2
Ahmed, S.M.3
-
6
-
-
2342421926
-
The year 2000 version of ISO 9000 and the process cost model for measuring quality costs in construction processes
-
edited by I. Ahmad, S.M. Ahmed and S. Azhar, Miami, Florida, USA, April
-
Aoieong, R.T. and Tang, S.L. (2002) The year 2000 version of ISO 9000 and the process cost model for measuring quality costs in construction processes. Proceedings of the First International Conference on Construction in the 21st Century (1st CITC): changes and Opportunities in Management and Technology edited by I. Ahmad, S.M. Ahmed and S. Azhar, Miami, Florida, USA, April, pp. 295-302.
-
(2002)
Proceedings of the First International Conference on Construction in the 21st Century (1st CITC): Changes and Opportunities in Management and Technology
, pp. 295-302
-
-
Aoieong, R.T.1
Tang, S.L.2
-
7
-
-
84897267021
-
Process cost model for construction quality measurement: Feedback and case study
-
December 2003, Hong Kong
-
Aoieong, R.T., Tang, S.L. and Ahmed, S.M. (2003) Process cost model for construction quality measurement: feedback and case study. Proceedings of the Second International Conference on Construction in the 21st Century (CITC-II), 10-12 December 2003, Hong Kong.
-
(2003)
Proceedings of the Second International Conference on Construction in the 21st Century (CITC-II)
, pp. 10-12
-
-
Aoieong, R.T.1
Tang, S.L.2
Ahmed, S.M.3
-
8
-
-
0001326664
-
Quality failure costs in civil engineering projects
-
Barber, P., Graves A., Hall, M., Sheath, D. and Tomkins, C. (2000) Quality failure costs in civil engineering projects, International Journal of Quality & Reliability Management, 17(4/5), 479-92.
-
(2000)
International Journal of Quality and Reliability Management
, vol.17
, Issue.4-5
, pp. 479-492
-
-
Barber, P.1
Graves, A.2
Hall, M.3
Sheath, D.4
Tomkins, C.5
-
9
-
-
2042445212
-
-
Source Document 30, The Construction Industry Institute, Austin, Texas, USA
-
Davis, K. and Ledbetter, W.B. (1987) Measuring Design and Construction Quality Costs. The Quality Management Task Force, Source Document 30, The Construction Industry Institute, Austin, Texas, USA.
-
(1987)
Measuring Design and Construction Quality Costs. The Quality Management Task Force
-
-
Davis, K.1
Ledbetter, W.B.2
-
10
-
-
0035501547
-
A cost of quality analysis of a building project: Towards a complete methodology for design and build
-
Hall, M. and Tomkins, C. (2001) A cost of quality analysis of a building project: towards a complete methodology for design and build. Construction Management and Economics, 19(5), 727-40.
-
(2001)
Construction Management and Economics
, vol.19
, Issue.5
, pp. 727-740
-
-
Hall, M.1
Tomkins, C.2
-
11
-
-
2142662731
-
Development and implementation of quality assurance in public construction works in Singapore and Hong Kong
-
Kam, C.W. and Tang, S.L. (1997) Development and implementation of quality assurance in public construction works in Singapore and Hong Kong, International Journal of Quality and Reliability Management, 14(9), 909-28.
-
(1997)
International Journal of Quality and Reliability Management
, vol.14
, Issue.9
, pp. 909-928
-
-
Kam, C.W.1
Tang, S.L.2
-
13
-
-
0000797825
-
Quantifying the causes and costs of rework in construction
-
Love, P.E.D. and Li, H. (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(3), 479-90.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.3
, pp. 479-490
-
-
Love, P.E.D.1
Li, H.2
-
15
-
-
0347147302
-
A survey of ISO 9001 implementation in engineering consultancies in Hong Kong
-
Tang, S.L. and Kam, C.W. (1999) A survey of ISO 9001 implementation in engineering consultancies in Hong Kong, International Journal of Quality and Reliability Management, 16(6), 562-74.
-
(1999)
International Journal of Quality and Reliability Management
, vol.16
, Issue.6
, pp. 562-574
-
-
Tang, S.L.1
Kam, C.W.2
|