메뉴 건너뛰기




Volumn 22, Issue 1, 2005, Pages 46-55

Attribute selection for the scheduling of flexible manufacturing systems based on fuzzy set-theoretic approach and genetic algorithm

Author keywords

Attribute selection; Dynamic scheduling; Flexible manufacturing system; Fuzzy theory; Genetic algorithm

Indexed keywords

BOUNDARY VALUE PROBLEMS; ERRORS; FUNCTIONS; FUZZY SETS; GENETIC ALGORITHMS; HEURISTIC METHODS; INFORMATION TECHNOLOGY; MATHEMATICAL MODELS; OPTIMIZATION; SCHEDULING; THROUGHPUT;

EID: 23144450374     PISSN: 10170669     EISSN: 21517606     Source Type: Journal    
DOI: 10.1080/10170660509509276     Document Type: Article
Times cited : (11)

References (37)
  • 1
    • 0002536833 scopus 로고
    • Simulation for Analysis of Scheduling Rules for a Flexible Manufacturing System
    • Goyal, S. K., Mehta, K., Kodali, R., and Deshmukh, S. G., 1995. Simulation for Analysis of Scheduling Rules for a Flexible Manufacturing System. Integrated Manufacturing Systems, 6 (5):21–26.
    • (1995) Integrated Manufacturing Systems , vol.6 , Issue.5 , pp. 21-26
    • Goyal, S.K.1    Mehta, K.2    Kodali, R.3    Deshmukh, S.G.4
  • 6
    • 0032163477 scopus 로고    scopus 로고
    • A Real-Time Scheduling Mechanism for a Flexible Manufacturing System: Using Simulation and Dispatching Rules
    • Jeong, K. C., and Kim, Y. D., 1998. A Real-Time Scheduling Mechanism for a Flexible Manufacturing System:Using Simulation and Dispatching Rules. International Journal of Production Research, 36 (9):2609–2626.
    • (1998) International Journal of Production Research , vol.36 , Issue.9 , pp. 2609-2626
    • Jeong, K.C.1    Kim, Y.D.2
  • 7
    • 0032000897 scopus 로고    scopus 로고
    • A Study of Scheduling Rules of Flexible Manufacturing Systems: A Simulation Approach
    • Sabuncuoglu, I., 1998. A Study of Scheduling Rules of Flexible Manufacturing Systems:a Simulation Approach. International Journal of Production Research, 36 (2):527–546.
    • (1998) International Journal of Production Research , vol.36 , Issue.2 , pp. 527-546
    • Sabuncuoglu, I.1
  • 8
    • 0037995671 scopus 로고    scopus 로고
    • Intelligent Dynamic Scheduling System: The Application of Genetic Algorithms
    • Jahangirian, M., and Conroy, G. V., 2000. Intelligent Dynamic Scheduling System:the Application of Genetic Algorithms. Integrated Manufacturing Systems, 11 (4):247–257.
    • (2000) Integrated Manufacturing Systems , vol.11 , Issue.4 , pp. 247-257
    • Jahangirian, M.1    Conroy, G.V.2
  • 9
    • 1642498822 scopus 로고    scopus 로고
    • Development of a Real-time Multi-objective Scheduler for Semiconductor Manufacturing Plants
    • Purdue University, July
    • Min, H. S., 2002. “ Development of a Real-time Multi-objective Scheduler for Semiconductor Manufacturing Plants ”. In PhD Thesis Purdue University. July
    • (2002) PhD Thesis
    • Min, H.S.1
  • 10
    • 0029659078 scopus 로고    scopus 로고
    • Production Planning of FMS under Tool Magazine Constraints: A Dynamic Programming Approach
    • Rau, K. R., and Chetty, O. V. K., 1996. Production Planning of FMS under Tool Magazine Constraints:a Dynamic Programming Approach. International Journal of Advanced Manufacturing Technology, 11:366–371.
    • (1996) International Journal of Advanced Manufacturing Technology , vol.11 , pp. 366-371
    • Rau, K.R.1    Chetty, O.V.K.2
  • 12
    • 0032640820 scopus 로고    scopus 로고
    • General Heuristic Procedures and Solution Strategies for FMS Scheduling
    • Liu, J., and MacCarthy, B. L., 1999. General Heuristic Procedures and Solution Strategies for FMS Scheduling. International Journal of Production Research, 37 (14):3305–3333.
    • (1999) International Journal of Production Research , vol.37 , Issue.14 , pp. 3305-3333
    • Liu, J.1    MacCarthy, B.L.2
  • 13
    • 0033352063 scopus 로고    scopus 로고
    • Petri Net Dynamics-Based Scheduling of Flexible Manufacturing Systems with Assembly
    • Jeng, M. D., Shilin, C., and Huang, Y. S., 1999. Petri Net Dynamics-Based Scheduling of Flexible Manufacturing Systems with Assembly. Journal of Intelligent Manufacturing, 10 (6):541–555.
    • (1999) Journal of Intelligent Manufacturing , vol.10 , Issue.6 , pp. 541-555
    • Jeng, M.D.1    Shilin, C.2    Huang, Y.S.3
  • 15
    • 0032163501 scopus 로고    scopus 로고
    • Integration of Inductive Learning and Neural Networks for Multi-Objective FMS Scheduling
    • Kim, C. O., Min, H. S., and Yih, Y., 1998. Integration of Inductive Learning and Neural Networks for Multi-Objective FMS Scheduling. International Journal of Production Research, 36 (9):2497–2509.
    • (1998) International Journal of Production Research , vol.36 , Issue.9 , pp. 2497-2509
    • Kim, C.O.1    Min, H.S.2    Yih, Y.3
  • 16
    • 0036131852 scopus 로고    scopus 로고
    • Integrating Petri Nets and Hybrid Heuristic Search for the Scheduling of FMS
    • Reyes, A., Yu, H., Kelleher, G., and Lloyd, S., 2002. Integrating Petri Nets and Hybrid Heuristic Search for the Scheduling of FMS. Computers in Industry, 47:123–138.
    • (2002) Computers in Industry , vol.47 , pp. 123-138
    • Reyes, A.1    Yu, H.2    Kelleher, G.3    Lloyd, S.4
  • 20
    • 0021607237 scopus 로고
    • Intraclass and interclass ambiguities (fuzziness) in feature evaluation
    • Pal, S. K., and Chakraborty, Basabi. 1984. Intraclass and interclass ambiguities (fuzziness) in feature evaluation. Pattern Recognition Latter, 2:275–279.
    • (1984) Pattern Recognition Latter , vol.2 , pp. 275-279
    • Pal, S.K.1    Chakraborty, B.2
  • 23
    • 0027577112 scopus 로고
    • Bayesian selection of important features for feedforward neural network
    • Priddy, K. L., Rogers, S. K., Ruck, D. W., Tarr, G. L., and Kabrisky, M., 1993. Bayesian selection of important features for feedforward neural network. Neurocomputing, 5:91–103.
    • (1993) Neurocomputing , vol.5 , pp. 91-103
    • Priddy, K.L.1    Rogers, S.K.2    Ruck, D.W.3    Tarr, G.L.4    Kabrisky, M.5
  • 24
    • 0029305112 scopus 로고
    • Distortion tolerant pattern recognition based on self-organizing feature extraction
    • Lampinen, J., and Oja, E., 1995. Distortion tolerant pattern recognition based on self-organizing feature extraction. IEEE Transactions on Neural Networks, 6:539–547.
    • (1995) IEEE Transactions on Neural Networks , vol.6 , pp. 539-547
    • Lampinen, J.1    Oja, E.2
  • 25
    • 0029307137 scopus 로고
    • A non-linear projection method based on Kohonen's topology preserving maps
    • Kraaijveld, M. A., Mao, J., and Jain, A. K., 1995. A non-linear projection method based on Kohonen's topology preserving maps. IEEE Transactions on Neural Networks, 6:548–559.
    • (1995) IEEE Transactions on Neural Networks , vol.6 , pp. 548-559
    • Kraaijveld, M.A.1    Mao, J.2    Jain, A.K.3
  • 26
    • 0031245693 scopus 로고    scopus 로고
    • Feature analysis: Neural network and fuzzy set theoretic approaches
    • De, R. K., Pal, N. R., and Pal, S. K., 1997. Feature analysis:Neural network and fuzzy set theoretic approaches. Pattern Recognition, 30:1579–1590.
    • (1997) Pattern Recognition , vol.30 , pp. 1579-1590
    • De, R.K.1    Pal, N.R.2    Pal, S.K.3
  • 27
    • 0033751612 scopus 로고    scopus 로고
    • Unsupervised feature evaluation: A neuro-fuzzy approach
    • Pal, S. K., De, R. K., and Basak, J., 2000. Unsupervised feature evaluation:A neuro-fuzzy approach. IEEE Transactions on Neural Networks, 11 (2):366–376.
    • (2000) IEEE Transactions on Neural Networks , vol.11 , Issue.2 , pp. 366-376
    • Pal, S.K.1    De, R.K.2    Basak, J.3
  • 32
    • 0015340630 scopus 로고
    • A definition of non probabilistic entropy in the setting of fuzzy set theory
    • Luca, A. D., and Termini, S. 1972. A definition of non probabilistic entropy in the setting of fuzzy set theory. Information and Control, 20:301–312.
    • (1972) Information and Control , vol.20 , pp. 301-312
    • Luca, A.D.1    Termini, S.2
  • 34
    • 0027576654 scopus 로고
    • A robust adaptive scheduler for an intelligent workstation controller
    • Cho, H., and Wysk, R. A., 1993. A robust adaptive scheduler for an intelligent workstation controller. International Journal of Production Research, 31:771–789.
    • (1993) International Journal of Production Research , vol.31 , pp. 771-789
    • Cho, H.1    Wysk, R.A.2
  • 35
    • 0030166927 scopus 로고    scopus 로고
    • Identifying attributes for knowledge-based development in dynamic scheduling environments
    • Chen, C. C., and Yih, Y., 1996. Identifying attributes for knowledge-based development in dynamic scheduling environments. International Journal of Production Research, 34:1739–1755.
    • (1996) International Journal of Production Research , vol.34 , pp. 1739-1755
    • Chen, C.C.1    Yih, Y.2
  • 36
    • 0031198746 scopus 로고    scopus 로고
    • Adaptive scheduling in dynamic flexible manufacturing systems: A dynamic rule selection approach
    • Park, S. C., Raman, N., and Shaw, M. J., 1997. Adaptive scheduling in dynamic flexible manufacturing systems:a dynamic rule selection approach. IEEE Transactions on Robotics and Automation, 13:486–502.
    • (1997) IEEE Transactions on Robotics and Automation , vol.13 , pp. 486-502
    • Park, S.C.1    Raman, N.2    Shaw, M.J.3
  • 37
    • 0034651059 scopus 로고    scopus 로고
    • Operating an FMC by a decision-tree-based adaptive production control system
    • Arzi, Y., and Iaroslavitz, L., 2000. Operating an FMC by a decision-tree-based adaptive production control system. International Journal of Production Research, 38:675–697.
    • (2000) International Journal of Production Research , vol.38 , pp. 675-697
    • Arzi, Y.1    Iaroslavitz, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.