-
1
-
-
0020718128
-
Formulation and solution of nonlinear integer production planning problem for flexible manufacturing system
-
K. E. Stecke, "Formulation and solution of nonlinear integer production planning problem for flexible manufacturing system", Management Science, 29, 3-12, 1983.
-
(1983)
Management Science
, vol.29
, pp. 3-12
-
-
Stecke, K.E.1
-
2
-
-
0002874558
-
Formulation and heuristic solutions for parts grouping and tool loading in flexible manufacturing systems
-
K. E. Stecke and R. Suri (ed.) Elsevier, Amsterdam
-
S. Rajagopalan, "Formulation and heuristic solutions for parts grouping and tool loading in flexible manufacturing systems", in K. E. Stecke and R. Suri (ed.) Proceedings of the second ORSA/ TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Application, Ann Arbor, Elsevier, Amsterdam, pp. 311-320, 1986.
-
(1986)
Proceedings of the Second ORSA/ TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Application, Ann Arbor
, pp. 311-320
-
-
Rajagopalan, S.1
-
3
-
-
0004829780
-
A constraint directed method to solve the part selection problem in FMS planning stage
-
K. E. Stecke and R. Suri (ed.) Elsevier, Amsterdam
-
S. S. Hwang, "A constraint directed method to solve the part selection problem in FMS planning stage", in K. E. Stecke and R. Suri (ed.) Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems, Ann Arbor, Elsevier, Amsterdam, pp. 297-309, 1986.
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems, Ann Arbor
, pp. 297-309
-
-
Hwang, S.S.1
-
5
-
-
0026850995
-
A comparison of tool management strategies and part selection rules for a flexible manufacturing system
-
A. Kwasi, J. R. Meredith and A. Raturi, "A comparison of tool management strategies and part selection rules for a flexible manufacturing system", International Journal of Production Research, 30, 733-748, 1992.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 733-748
-
-
Kwasi, A.1
Meredith, J.R.2
Raturi, A.3
-
7
-
-
0025894458
-
A flexible approach to part type selection in flexible flow systems using part mix ratios
-
K. E. Stecke and I. Kim, "A flexible approach to part type selection in flexible flow systems using part mix ratios", International Journal of Production Research, 29, 53-75, 1991.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 53-75
-
-
Stecke, K.E.1
Kim, I.2
-
9
-
-
0026191291
-
Part ordering through simulation-optimization in an FMS
-
Y. Lee and K. Iwata, "Part ordering through simulation-optimization in an FMS", International Journal of Production Research, 29, 1309-1323, 1991.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1309-1323
-
-
Lee, Y.1
Iwata, K.2
-
10
-
-
0022794511
-
A branch and bound approach for machine load balancing in flexible manufacturing systems
-
M. Berrada and K. E. Stecke, "A branch and bound approach for machine load balancing in flexible manufacturing systems", Management Science, 32, 1316-1335, 1986.
-
(1986)
Management Science
, vol.32
, pp. 1316-1335
-
-
Berrada, M.1
Stecke, K.E.2
-
11
-
-
0009444821
-
Loading problems with tool management in flexible manufacturing systems: A few integer programming models
-
D. Werra and M. Widmer, "Loading problems with tool management in flexible manufacturing systems: A few integer programming models", International Journal of Flexible Manufacturing Systems, 3, 71-82, 1990.
-
(1990)
International Journal of Flexible Manufacturing Systems
, vol.3
, pp. 71-82
-
-
Werra, D.1
Widmer, M.2
-
12
-
-
0025429972
-
A multi objective evaluation of flexible manufacturing system loading heuristics
-
Y. J. Chen and R. G. Askin "A multi objective evaluation of flexible manufacturing system loading heuristics", International Journal of Production Research, 28, 895-911, 1990.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 895-911
-
-
Chen, Y.J.1
Askin, R.G.2
-
13
-
-
0001839254
-
Work balance and part-transfer minimization in flexible manufacturing systems
-
C. Arbib, M. Lucertini and F. Nicolo, "Work balance and part-transfer minimization in flexible manufacturing systems", International Journal of Flexible Manufacturing Systems, 3, 5-25, 1990.
-
(1990)
International Journal of Flexible Manufacturing Systems
, vol.3
, pp. 5-25
-
-
Arbib, C.1
Lucertini, M.2
Nicolo, F.3
-
14
-
-
0026254174
-
Effect of loading and routing decisions on performance of flexible manufacturing systems
-
I. J. Chen and C. H. Chung, "Effect of loading and routing decisions on performance of flexible manufacturing systems", International Journal of Production Research, 29, 2209-2225, 1991.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2209-2225
-
-
Chen, I.J.1
Chung, C.H.2
-
15
-
-
0026914581
-
A heuristic procedure for loading problems in flexible manufacturing systems
-
S. K. Mukhopadhyay, S. Midha and V. Murali Krishna, "A heuristic procedure for loading problems in flexible manufacturing systems", International Journal of Production Research, 30, 2213-2228, 1992.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2213-2228
-
-
Mukhopadhyay, S.K.1
Midha, S.2
Murali Krishna, V.3
-
16
-
-
0022060472
-
A loading and dispatching problem in a random flexible manufacturing system
-
K. Shanker and Y. J. Tzen, "A loading and dispatching problem in a random flexible manufacturing system", International Journal of Production Research, 23, 579-595, 1985.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 579-595
-
-
Shanker, K.1
Tzen, Y.J.2
-
17
-
-
0023384747
-
The machine loading and tool allocation problem in a flexible manufacturing system
-
S. C. Sarin and C. S. Chen, "The machine loading and tool allocation problem in a flexible manufacturing system", International Journal of Production Research, 25, 1081-1094, 1987.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1081-1094
-
-
Sarin, S.C.1
Chen, C.S.2
-
18
-
-
0024070715
-
Models arising from a flexible manufacturing machine, Part I: Minimization of the number of tool switches
-
C. S. Tang and E. V. Denardo, "Models arising from a flexible manufacturing machine, Part I: minimization of the number of tool switches", Operations Research, 36, 767-777, 1988.
-
(1988)
Operations Research
, vol.36
, pp. 767-777
-
-
Tang, C.S.1
Denardo, E.V.2
-
19
-
-
0024071392
-
Models arising from a flexible manufacturing machine, Part II: Minimization of the number of switching instants
-
1988b
-
C. S. Tang and E. V. Denardo, 1988b, "Models arising from a flexible manufacturing machine, Part II: minimization of the number of switching instants", Operations Research, 36, 778-784, 1988.
-
(1988)
Operations Research
, vol.36
, pp. 778-784
-
-
Tang, C.S.1
Denardo, E.V.2
-
20
-
-
0024716540
-
Real-time tool control and job dispatching in flexible manufacturing systems
-
M. Han, Y. K. Na and G. L. Hogg "Real-time tool control and job dispatching in flexible manufacturing systems", International Journal of Production Research, 27, 1257-1267, 1989.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1257-1267
-
-
Han, M.1
Na, Y.K.2
Hogg, G.L.3
-
22
-
-
0026239447
-
Heuristic solution to the scheduling problems in flexible manufacturing system
-
S. K. Mukhopadhyay, B. Maiti and S. Garg, "Heuristic solution to the scheduling problems in flexible manufacturing system", International Journal of Production Research, 29, 2003-2024, 1991.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2003-2024
-
-
Mukhopadhyay, S.K.1
Maiti, B.2
Garg, S.3
-
23
-
-
0026883892
-
Tooling constraints and shop floor scheduling: Evaluating the impact of sequence dependency
-
S. Ghosh, S. A. Melnyk and G. L. Ragatz, "Tooling constraints and shop floor scheduling: evaluating the impact of sequence dependency", International Journal of Production Research, 30, 1237-1253, 1992.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1237-1253
-
-
Ghosh, S.1
Melnyk, S.A.2
Ragatz, G.L.3
-
24
-
-
0026883890
-
A petri net approach for analysing tool management issues in FMS
-
1992
-
C. E. Reddy, O. V. Krishnaiah Chetty and D. Chaudhuri, 1992, "A petri net approach for analysing tool management issues in FMS", International Journal of Production Research, 30, 1427-1446, 1992.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1427-1446
-
-
Reddy, C.E.1
Krishnaiah Chetty, O.V.2
Chaudhuri, D.3
-
25
-
-
0027187518
-
Concurrent part assignment and tool allocation in FMS with material handling consideratinos
-
L. C. Leung, S. K. Maheshwari and W. A. Miller, "Concurrent part assignment and tool allocation in FMS with material handling consideratinos", International Journal of Production Research, 31, 117-138, 1993.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 117-138
-
-
Leung, L.C.1
Maheshwari, S.K.2
Miller, W.A.3
-
27
-
-
0002048643
-
Discrete dynamic programming and capital allocation
-
G. Nemhauser and Z. Ullman, "Discrete dynamic programming and capital allocation", Management Science, 15(9), pp. 494-505, 1969.
-
(1969)
Management Science
, vol.15
, Issue.9
, pp. 494-505
-
-
Nemhauser, G.1
Ullman, Z.2
-
28
-
-
84881579627
-
Dynamic programming treatment of the travelling salesman problem
-
R. Bellman, "Dynamic programming treatment of the travelling salesman problem", Journal of the Association for Computing Machinery, 9, pp. 61-63, 1962.
-
(1962)
Journal of the Association for Computing Machinery
, vol.9
, pp. 61-63
-
-
Bellman, R.1
|