Analysis of factors influencing project cost estimating practice
-
Akintoye, A. (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18 1), 77-89.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.1
, pp. 77-89
-
-
Akintoye, A.1
-
2
-
-
0001980630
-
Determinants of construction project success
-
Ashley, D.B., Laurie, C.S. and Jaselskis, E.J. (1987) Determinants of construction project success. Project Management Journal, 18 2), 69-79.
-
(1987)
Project Management Journal
, vol.18
, Issue.2
, pp. 69-79
-
-
Ashley, D.B.1
Laurie, C.S.2
Jaselskis, E.J.3
-
3
-
-
13944265044
-
Predicting cost deviation in reconstruction projects: Artificial neural network versus regression
-
Attala, M. and Hegazy, T. (2003) Predicting cost deviation in reconstruction projects: artificial neural network versus regression. Journal of Construction Engineering and Management, 129(4), 405-11.
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.4
, pp. 405-411
-
-
Attala, M.1
Hegazy, T.2
-
4
-
-
0030173778
-
A new framework for determining critical success/failure factors in projects
-
Belassi, W. and Tukel, O.I. (1996) A new framework for determining critical success/failure factors in projects. International Journal of Project Management, 14(3), 141-51.
-
(1996)
International Journal of Project Management
, vol.14
, Issue.3
, pp. 141-151
-
-
Belassi, W.1
Tukel, O.I.2
-
5
-
-
0004047083
-
Designing and building a world-class industry
-
Centre for Strategic Studies in Construction, Reading
-
Bennett, J., Pothecary, E. and Robinson, G. (1996) Designing and building a world-class industry, Centre for Strategic Studies in Construction, Reading.
-
(1996)
-
-
Bennett, J.1
Pothecary, E.2
Robinson, G.3
-
6
-
-
0002232162
-
Contract time performance expectations and the reality
-
Bromilow, F.J. (1969) Contract time performance expectations and the reality. Building Forum, 1(3), 70-80.
-
(1969)
Building Forum
, vol.1
, Issue.3
, pp. 70-80
-
-
Bromilow, F.J.1
-
7
-
-
16444387447
-
-
Building and Construction Authority (BCA) Singapore Building and Construction Authority Homepage (Accessed 19 April 2002.)
-
Building and Construction Authority (BCA) (2002) Singapore Building and Construction Authority homepage, http://www.bca.gov.sg (Accessed 19 April 2002.).
-
(2002)
-
-
-
8
-
-
0035280018
-
Design and build project success factors: Multivariate analysis
-
Chan, P.C.A., Ho, C.K.D. and Tam, C.M. (2001) Design and build project success factors: multivariate analysis. Journal of Construction Engineering and Management, 127(2), 93-100.
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.2
, pp. 93-100
-
-
Chan, P.C.A.1
Ho, C.K.D.2
Tam, C.M.3
-
9
-
-
13944268320
-
Management's perception of key performance indicators for construction
-
Cox, R.F., Issa, R.R.A. and Ahrens, D. (2003) Management's perception of key performance indicators for construction. Journal of Construction Engineering and Management, 129(2), 141-51.
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.2
, pp. 141-151
-
-
Cox, R.F.1
Issa, R.R.A.2
Ahrens, D.3
-
10
-
-
16444367142
-
-
Prentice Hall International, New Jersey
-
Greene, W.H. (1997) Economenic Analysis, Prentice Hall International, New Jersey.
-
(1997)
Economenic Analysis
-
-
Greene, W.H.1
-
11
-
-
0000794253
-
Neural network model for parametric cost estimation of highway projects
-
Hegazy, T. and Ayed, A. (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineeting and Management, 124(3), 210-18.
-
(1998)
Journal of Construction Engineeting and Management
, vol.124
, Issue.3
, pp. 210-218
-
-
Hegazy, T.1
Ayed, A.2
-
12
-
-
0039997969
-
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
-
Kaming, P.F.K., Olomolaiye, P.O., Holt, G. and Harris, F.C. (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), 83-94.
-
(1997)
Construction Management and Economics
, vol.15
, Issue.1
, pp. 83-94
-
-
Kaming, P.F.K.1
Olomolaiye, P.O.2
Holt, G.3
Harris, F.C.4
-
15
-
-
2142774401
-
Predicting performance of design-build and design-bid-build projects
-
Ling, F.Y.Y., Chan, S.L., Chong, E. and Lee, P.E. (2004) Predicting performance of design-build and design-bid-build projects. Journal of Construction Engineering and Management, 130(1), 75-83.
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.1
, pp. 75-83
-
-
Ling, F.Y.Y.1
Chan, S.L.2
Chong, E.3
Lee, P.E.4
-
17
-
-
0001926526
-
Critical success factors across the project life cycle
-
Pinto, J.K. and Slevin, D.P. (1988) Critical success factors across the project life cycle. Project Management Journal, 19(3), 67-75.
-
(1988)
Project Management Journal
, vol.19
, Issue.3
, pp. 67-75
-
-
Pinto, J.K.1
Slevin, D.P.2
-
18
-
-
1842594656
-
-
Quantitative Micro Software LLC, California
-
Quantitative Micro Software (2000) LLC, Eviews 4.0 Users' Guide, California.
-
(2000)
Eviews 4.0 Users' Guide
-
-
-
20
-
-
0000971955
-
Project characteristics for successful public-sector design-build
-
ASCE
-
Songer, A.D. and Molenaar, K.R. (1997) Project characteristics for successful public-sector design-build. Journal of Construction Engineering and Management, ASCE, 123(1), 34-40.
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.1
, pp. 34-40
-
-
Songer, A.D.1
Molenaar, K.R.2
-
21
-
-
85001576951
-
CSFs in competitive tendering and negotiation model for BOT projects
-
ASCE
-
Tiong, R.L.K. (1996) CSFs in competitive tendering and negotiation model for BOT projects. Journal of Contraction Engineering and Management ASCE, 122(3), 205-11.
-
(1996)
Journal of Contraction Engineering and Management
, vol.122
, Issue.3
, pp. 205-211
-
-
Tiong, R.L.K.1
-
22
-
-
2642579411
-
Predicting accuracy of early cost estimates using factor analysis and multivariate regression
-
ASCE
-
Trost, S.M. and Oberlender, G.D. (2003) Predicting accuracy of early cost estimates using factor analysis and multivariate regression. Journal of Construction Engineering and Management, ASCE, 129 2), 198-204.
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.2
, pp. 198-204
-
-
Trost, S.M.1
Oberlender, G.D.2
|