메뉴 건너뛰기




Volumn 14, Issue 4, 2005, Pages 435-441

The influence of automation and robotics on the performance construction

Author keywords

Automation; Construction engineering; Construction management; Metropolis; Performance management; Value creation

Indexed keywords

CONSTRUCTION INDUSTRY; MAN MACHINE SYSTEMS; MANAGERS; PERFORMANCE; PERSONAL DIGITAL ASSISTANTS; PRODUCTION ENGINEERING; PROJECT MANAGEMENT; ROBOTICS; URBAN PLANNING;

EID: 14544300534     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2004.09.010     Document Type: Conference Paper
Times cited : (27)

References (9)
  • 3
    • 14544285498 scopus 로고    scopus 로고
    • Industrialised Building Systems: Reproduction before Automation and Robotics
    • R.-B. Richard Industrialised Building Systems: Reproduction before Automation and Robotics Automation in Construction 14 2004 443 452 (this volume)
    • (2004) Automation in Construction , vol.14 , pp. 443-452
    • Richard, R.-B.1
  • 4
    • 14544298805 scopus 로고    scopus 로고
    • Automated Project Performance Control (APPC) of Construction Projects
    • R. Navon Automated Project Performance Control (APPC) of Construction Projects Automation in Construction 14 2004 469 478 (this volume)
    • (2004) Automation in Construction , vol.14 , pp. 469-478
    • Navon, R.1
  • 6
    • 14544274600 scopus 로고    scopus 로고
    • The application of PDA as Mobile Computing System on Construction Management
    • K. Kimoto, K. Endo, S. Iwashita, and M. Fujiwara The application of PDA as Mobile Computing System on Construction Management Automation in Construction 14 2004 503 514 (this volume)
    • (2004) Automation in Construction , vol.14 , pp. 503-514
    • Kimoto, K.1    Endo, K.2    Iwashita, S.3    Fujiwara, M.4
  • 7
    • 14544272383 scopus 로고    scopus 로고
    • Development of Hybrid Robot for Construction Works with Pneumatic Actuator
    • H.-S. Choi, C.-S. Han, K.-Y. Lee, and S.-H. Lee Development of Hybrid Robot for Construction Works with Pneumatic Actuator Automation in Construction 14 2004 453 460 (this volume)
    • (2004) Automation in Construction , vol.14 , pp. 453-460
    • Choi, H.-S.1    Han, C.-S.2    Lee, K.-Y.3    Lee, S.-H.4
  • 8
    • 14544272382 scopus 로고    scopus 로고
    • Distributed Object Models for Collaboration in the Construction Industry
    • J. Van Leeuwen, and A. Van der Zee Distributed Object Models for Collaboration in the Construction Industry Automation in Construction 14 2004 493 501 (this volume)
    • (2004) Automation in Construction , vol.14 , pp. 493-501
    • Van Leeuwen, J.1    Van Der Zee, A.2
  • 9
    • 14544278569 scopus 로고    scopus 로고
    • Parts and Packets Unification RFID Application for Construction
    • J. Yagi, E. Arai, and T. Arai Parts and Packets Unification RFID Application for Construction Automation in Construction 14 2004 479 492 (this volume)
    • (2004) Automation in Construction , vol.14 , pp. 479-492
    • Yagi, J.1    Arai, E.2    Arai, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.