메뉴 건너뛰기




Volumn 125, Issue 2, 1999, Pages 87-95

Time series analysis for construction productivity experiments

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION EQUIPMENT; DIFFERENCE EQUATIONS; MANAGEMENT; MATHEMATICAL MODELS; PERSONNEL; PRODUCTIVITY; REGRESSION ANALYSIS; TECHNOLOGY; TIME SERIES ANALYSIS;

EID: 0033101230     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1999)125:2(87)     Document Type: Article
Times cited : (15)

References (8)
  • 4
    • 0027556933 scopus 로고
    • CRANIUM: Device for improving safety and productivity
    • Everett, J. G., and Slocum, A. H. (1993). "CRANIUM: Device for improving safety and productivity." J. Constr. Engrg. and Mgmt., ASCE, 119(1), 23-39.
    • (1993) J. Constr. Engrg. and Mgmt., ASCE , vol.119 , Issue.1 , pp. 23-39
    • Everett, J.G.1    Slocum, A.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.