-
1
-
-
3342892797
-
The role of the structural engineer in maintaining the built environment
-
London, U.K.
-
Clancy, B. P. (1994), "The role of the structural engineer in maintaining the built environment." The Struct. Engr., London, U.K., 72(21), 365-367.
-
(1994)
The Struct. Engr.
, vol.72
, Issue.21
, pp. 365-367
-
-
Clancy, B.P.1
-
2
-
-
3343008550
-
New buildings from old: Some views on refurbishment projects
-
London, U.K.
-
Clancy, B. P. (1995). "New buildings from old: some views on refurbishment projects." The Struct. Engr., London, U.K., 73(20), 341-346.
-
(1995)
The Struct. Engr.
, vol.73
, Issue.20
, pp. 341-346
-
-
Clancy, B.P.1
-
3
-
-
84889535074
-
Project information at the pre-construction stage
-
Build. Res. Establishment, Watford, U.K.
-
Crawshaw, D. T. (1979). "Project information at the pre-construction stage." Information Paper IP27/79, Build. Res. Establishment, Watford, U.K.
-
(1979)
Information Paper IP27/79
-
-
Crawshaw, D.T.1
-
4
-
-
0027561089
-
Evaluation and repair of war-damaged concrete structures in Beirut
-
Hamad, B. S. (1993). "Evaluation and repair of war-damaged concrete structures in Beirut." Concrete Int., 15(3), 47-51.
-
(1993)
Concrete Int.
, vol.15
, Issue.3
, pp. 47-51
-
-
Hamad, B.S.1
-
5
-
-
0027555753
-
Assessment and repair of war-damaged concrete buildings in Kuwait city
-
Hamid, A. A., Fereig, S. M., Al-Khaiat, H., and Darwish, A. H. (1993). "Assessment and repair of war-damaged concrete buildings in Kuwait city." Concrete Int., 15(3), 52-54.
-
(1993)
Concrete Int.
, vol.15
, Issue.3
, pp. 52-54
-
-
Hamid, A.A.1
Fereig, S.M.2
Al-Khaiat, H.3
Darwish, A.H.4
-
6
-
-
0028494766
-
Contractor's constructionclaims avoidance
-
ASCE
-
Jergeas, F. J., and Hartman, F. T. (1994). "Contractor's constructionclaims avoidance." J. Construction Engineering and Management, ASCE, 120(3), 533-560.
-
(1994)
J. Construction Engineering and Management
, vol.120
, Issue.3
, pp. 533-560
-
-
Jergeas, F.J.1
Hartman, F.T.2
-
7
-
-
84881603814
-
Design decision-making in architectural practice
-
Build. Res. Establishment, Watford, U.K.
-
Mackinder, M., and Marvin, H. (1982). "Design decision-making in architectural practice." Information Paper IP11/82, Build. Res. Establishment, Watford, U.K.
-
(1982)
Information Paper IP11/82
-
-
Mackinder, M.1
Marvin, H.2
-
8
-
-
5244303169
-
The top 200 international design firms
-
"The top 200 international design firms." (1995). ENR, 235(4), 34-38.
-
(1995)
ENR
, vol.235
, Issue.4
, pp. 34-38
-
-
-
9
-
-
0029361062
-
Quantitative effects of construction changes on labor productivity
-
ASCE
-
Thomas, H. R., and Napolitan, C. L. (1995). "Quantitative effects of construction changes on labor productivity." J. Construction Engineering and Management, ASCE, 121(3), 290-296.
-
(1995)
J. Construction Engineering and Management
, vol.121
, Issue.3
, pp. 290-296
-
-
Thomas, H.R.1
Napolitan, C.L.2
|