-
2
-
-
0027578721
-
Prototype integrated cost and schedule control system
-
Abudayyeh, O.Y. and Rasdorf, W.J. (1993) Prototype integrated cost and schedule control system, Journal of Computing in Civil Engineering, 7(2), 181-97.
-
(1993)
Journal of Computing in Civil Engineering
, vol.7
, Issue.2
, pp. 181-197
-
-
Abudayyeh, O.Y.1
Rasdorf, W.J.2
-
4
-
-
0027560857
-
Systematic automated management exception reporting
-
Abu-Hijleh, S.F. and Ibbs, C.W. (1993) Systematic automated management exception reporting. Journal of Construction Engineering and Management, ASCE, 119, 87-104.
-
(1993)
Journal of Construction Engineering and Management, ASCE
, vol.119
, pp. 87-104
-
-
Abu-Hijleh, S.F.1
Ibbs, C.W.2
-
5
-
-
0003727195
-
-
2nd edn, John Wiley and Sons, New York
-
Ahuja, N.H., Dozzi, S.P. and AbouRizk, S.M. (1994) Project Management-Techniques in Planning and Controlling Construction Project, 2nd edn, John Wiley & Sons, New York.
-
(1994)
Project Management - Techniques in Planning and Controlling Construction Project
-
-
Ahuja, N.H.1
Dozzi, S.P.2
AbouRizk, S.M.3
-
6
-
-
84948506156
-
Computer aided construction delay analysis and claims preparation
-
Alkass, S., Mazerolle, M., Tribaldos, E. and Harris, F. (1993) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13, 335-52.
-
(1993)
Construction Management and Economics
, vol.13
, pp. 335-352
-
-
Alkass, S.1
Mazerolle, M.2
Tribaldos, E.3
Harris, F.4
-
7
-
-
1142263550
-
-
Master Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Montreal, Canada
-
Alshaibani, A. (1999) A computerized cost and schedule control system for construction projects, Master Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Montreal, Canada.
-
(1999)
A Computerized Cost and Schedule Control System for Construction Projects
-
-
Alshaibani, A.1
-
8
-
-
84927635730
-
Causes of delay in large building construction projects
-
ASCE
-
Assaf, S.A., Al-Khalil, M. and Al-Hazmi, M. (1995) Causes of delay in large building construction projects, Journal of Management in Engineering, ASCE, 11(2), 45-50.
-
(1995)
Journal of Management in Engineering
, vol.11
, Issue.2
, pp. 45-50
-
-
Assaf, S.A.1
Al-Khalil, M.2
Al-Hazmi, M.3
-
9
-
-
11644288742
-
Shielding production: Essential step in production control
-
ASCE
-
Ballard, G. and Howell, G. (1998) Shielding production: essential step in production control, Journal of Construction Engineering and Management, ASCE, 124(1), 11-17.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
12
-
-
0027609613
-
Cost, schedule, and time variances and integration
-
ASCE
-
Carr, R.I. (1993) Cost, schedule, and time variances and integration. Journal of Construction Engineering in Management, ASCE, 119(2), 245-65.
-
(1993)
Journal of Construction Engineering in Management
, vol.119
, Issue.2
, pp. 245-265
-
-
Carr, R.I.1
-
13
-
-
0009429404
-
-
CII Construction Industry Institute, Publication 6-5, University of Texas at Austin, Austin, Texas
-
CII (1987) Project Control for Construction, Construction Industry Institute, Publication 6-5, University of Texas at Austin, Austin, Texas.
-
(1987)
Project Control for Construction
-
-
-
14
-
-
84863738012
-
-
Department of Defense (DoD) Department of Defense Instruction (DODI) 7000.2
-
Department of Defense (DoD) (1967) Performance Measurement for Selected Acquisitions, Department of Defense Instruction (DODI) 7000.2.
-
(1967)
Performance Measurement for Selected Acquisitions
-
-
-
16
-
-
0026883408
-
Super change: Export system for analysis of changes claims
-
ASCE
-
Diekmann, J.E. and Kim, M.P. (1992) Super change: export system for analysis of changes claims. Journal of Construction Engineering and Management, ASCE, 18(2), 399-411.
-
(1992)
Journal of Construction Engineering and Management
, vol.18
, Issue.2
, pp. 399-411
-
-
Diekmann, J.E.1
Kim, M.P.2
-
17
-
-
1142287836
-
Evaluating the performance of construction equipment operators in Egypt
-
ASCE
-
Elazouni, A.M. and Basha, I.M. (1996) Evaluating the Performance of construction equipment operators in Egypt. Journal of Construction Engineering and Management, ASCE, 122(2), 109-14.
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, Issue.2
, pp. 109-114
-
-
Elazouni, A.M.1
Basha, I.M.2
-
18
-
-
1142275705
-
Measurement of work progress: Quantitative technique
-
ASCE
-
Eldin, N.N. (1989) Measurement of work progress: quantitative technique. Journal of Construction Engineering and Management, ASCE, 115(3), 462-74.
-
(1989)
Journal of Construction Engineering and Management
, vol.115
, Issue.3
, pp. 462-474
-
-
Eldin, N.N.1
-
19
-
-
0026840652
-
An algorithm for tracking labor cost
-
Eldin, N.N. and Hughes, R.K. (1992) An algorithm for tracking labor cost. Cost Engineering, 34(4), 17-23.
-
(1992)
Cost Engineering
, vol.34
, Issue.4
, pp. 17-23
-
-
Eldin, N.N.1
Hughes, R.K.2
-
21
-
-
0342301544
-
A prototype rule-based expert system for diagnosing problems on the construction site
-
Fayek, A.R., AbouRizk, S.M. and Hague, S. (1998) A prototype rule-based expert system for diagnosing problems on the construction site, in Proceedings of the First International Conference on New Information Technologies for Decision Making in Civil Engineering, pp. 1151-62.
-
(1998)
Proceedings of the First International Conference on New Information Technologies for Decision Making in Civil Engineering
, pp. 1151-1162
-
-
Fayek, A.R.1
AbouRizk, S.M.2
Hague, S.3
-
22
-
-
0032659199
-
Impact of change orders on labor efficient for electrical construction
-
Hanna, A.S., Russell, J.S., Nordheim, E.V. and Bruggink, M.J. (1999) Impact of change orders on labor efficient for electrical construction. Journal of Construction Engineering and Management, 125(4), 224-32.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.4
, pp. 224-232
-
-
Hanna, A.S.1
Russell, J.S.2
Nordheim, E.V.3
Bruggink, M.J.4
-
23
-
-
0004803398
-
COMPASS-New paradigm for project cost control strategy and planning
-
Hastak, M., Halpin, D.W. and Vanegas, J. (1996) COMPASS-New paradigm for project cost control strategy and planning. Journal Construction Engineering and Management, 122(3), 254-64.
-
(1996)
Journal Construction Engineering and Management
, vol.122
, Issue.3
, pp. 254-264
-
-
Hastak, M.1
Halpin, D.W.2
Vanegas, J.3
-
24
-
-
0002083363
-
Impact of subcontracting on site productivity: Lessons learned in Taiwan
-
Hsieh, T.Y. (1998) Impact of subcontracting on site productivity: lessons learned in Taiwan. Journal of Construction Engineering and Management, 124(2), 91-100.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.2
, pp. 91-100
-
-
Hsieh, T.Y.1
-
25
-
-
1142275707
-
Applied earned value for project control
-
St. Augustine, Trinidad and Tobago
-
Moselhi, O. (1993) Applied earned value for project control, in Proceedings of the International Symposium of CIB W-65, St. Augustine, Trinidad & Tobago, pp. 869-79.
-
(1993)
Proceedings of the International Symposium of CIB W-65
, pp. 869-879
-
-
Moselhi, O.1
-
26
-
-
1142275704
-
Web-based integrated project time and cost control system
-
Beijing, China
-
Moselhi, O., Li, J. and Alkass, S. (2001) Web-based integrated project time and cost control system, in Proceedings of International Conference for Project Cost Control, Beijing, China, pp. 47-54.
-
(2001)
Proceedings of International Conference for Project Cost Control
, pp. 47-54
-
-
Moselhi, O.1
Li, J.2
Alkass, S.3
-
27
-
-
33645707294
-
Web-based integrated project control
-
Montreal, Canada
-
Moselhi, O., Li, J. and Alkass, S. (2002) Web-based integrated project control, in Proceedings of 30th Annual Conference of Canadian Society for Civil Engineering (CSCE), Montreal, Canada, pp. GE-066.
-
(2002)
Proceedings of 30th Annual Conference of Canadian Society for Civil Engineering (CSCE)
-
-
Moselhi, O.1
Li, J.2
Alkass, S.3
-
29
-
-
1142299974
-
-
Primavera Project Planner (P3) Primavera Systems, Inc, Bala Cynwyd, PA
-
Primavera Project Planner (P3) (1999) Reference Manual Version 3.0, Primavera Systems, Inc, Bala Cynwyd, PA.
-
(1999)
Reference Manual Version 3.0
-
-
-
31
-
-
84929979974
-
Project control techniques, project controls: Needs and solutions
-
ASCE, New York, NY
-
Riggs, L.S. (1987) Project control techniques, project controls: needs and solutions, in Proceedings of Specialty Conference, ASCE, New York, NY, pp. 11-25.
-
(1987)
Proceedings of Specialty Conference
, pp. 11-25
-
-
Riggs, L.S.1
-
36
-
-
0035391255
-
Development of causal model of construction
-
Suraji, A., Duff, A.R. and Peckitt, S.J. (2001) Development of causal model of construction. Journal of Construction Engineering and Management, 127(4), 337-44.
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.4
, pp. 337-344
-
-
Suraji, A.1
Duff, A.R.2
Peckitt, S.J.3
-
37
-
-
0027610716
-
Construction decision support system for delay analysis
-
Yates, J.K. (1993) Construction decision support system for delay analysis. Journal of Construction Engineering and Management, 119(2), 226-44.
-
(1993)
Journal of Construction Engineering and Management
, vol.119
, Issue.2
, pp. 226-244
-
-
Yates, J.K.1
|