Web-based integrated project control system

Author keywords

Earned value; Progress reporting; Project control; Web based system

Indexed keywords

CONTROL SYSTEMS; COSTS; MATHEMATICAL MODELS; SERVERS; SYSTEMS ANALYSIS; WORLD WIDE WEB;

EID: 1142306029     PISSN: 01446193     EISSN: None     Source Type: Journal    
DOI: 10.1080/0144619042000186040     Document Type: Article
Times cited : (34)

References (37)
  • 12
    • 0027609613 scopus 로고
    • Cost, schedule, and time variances and integration
    • ASCE
    • Carr, R.I. (1993) Cost, schedule, and time variances and integration. Journal of Construction Engineering in Management, ASCE, 119(2), 245-65.
    • (1993) Journal of Construction Engineering in Management , vol.119 , Issue.2 , pp. 245-265
    • Carr, R.I.1
  • 13
    • 0009429404 scopus 로고
    • CII Construction Industry Institute, Publication 6-5, University of Texas at Austin, Austin, Texas
    • CII (1987) Project Control for Construction, Construction Industry Institute, Publication 6-5, University of Texas at Austin, Austin, Texas.
    • (1987) Project Control for Construction
  • 14
    • 84863738012 scopus 로고
    • Department of Defense (DoD) Department of Defense Instruction (DODI) 7000.2
    • Department of Defense (DoD) (1967) Performance Measurement for Selected Acquisitions, Department of Defense Instruction (DODI) 7000.2.
    • (1967) Performance Measurement for Selected Acquisitions
  • 17
    • 1142287836 scopus 로고    scopus 로고
    • Evaluating the performance of construction equipment operators in Egypt
    • ASCE
    • Elazouni, A.M. and Basha, I.M. (1996) Evaluating the Performance of construction equipment operators in Egypt. Journal of Construction Engineering and Management, ASCE, 122(2), 109-14.
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.2 , pp. 109-114
    • Elazouni, A.M.1    Basha, I.M.2
  • 18
    • 1142275705 scopus 로고
    • Measurement of work progress: Quantitative technique
    • ASCE
    • Eldin, N.N. (1989) Measurement of work progress: quantitative technique. Journal of Construction Engineering and Management, ASCE, 115(3), 462-74.
    • (1989) Journal of Construction Engineering and Management , vol.115 , Issue.3 , pp. 462-474
    • Eldin, N.N.1
  • 19
    • 0026840652 scopus 로고
    • An algorithm for tracking labor cost
    • Eldin, N.N. and Hughes, R.K. (1992) An algorithm for tracking labor cost. Cost Engineering, 34(4), 17-23.
    • (1992) Cost Engineering , vol.34 , Issue.4 , pp. 17-23
    • Eldin, N.N.1    Hughes, R.K.2
  • 24
    • 0002083363 scopus 로고    scopus 로고
    • Impact of subcontracting on site productivity: Lessons learned in Taiwan
    • Hsieh, T.Y. (1998) Impact of subcontracting on site productivity: lessons learned in Taiwan. Journal of Construction Engineering and Management, 124(2), 91-100.
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.2 , pp. 91-100
    • Hsieh, T.Y.1
  • 25
    • 1142275707 scopus 로고
    • Applied earned value for project control
    • St. Augustine, Trinidad and Tobago
    • Moselhi, O. (1993) Applied earned value for project control, in Proceedings of the International Symposium of CIB W-65, St. Augustine, Trinidad & Tobago, pp. 869-79.
    • (1993) Proceedings of the International Symposium of CIB W-65 , pp. 869-879
    • Moselhi, O.1
  • 29
    • 1142299974 scopus 로고    scopus 로고
    • Primavera Project Planner (P3) Primavera Systems, Inc, Bala Cynwyd, PA
    • Primavera Project Planner (P3) (1999) Reference Manual Version 3.0, Primavera Systems, Inc, Bala Cynwyd, PA.
    • (1999) Reference Manual Version 3.0
  • 31
    • 84929979974 scopus 로고
    • Project control techniques, project controls: Needs and solutions
    • ASCE, New York, NY
    • Riggs, L.S. (1987) Project control techniques, project controls: needs and solutions, in Proceedings of Specialty Conference, ASCE, New York, NY, pp. 11-25.
    • (1987) Proceedings of Specialty Conference , pp. 11-25
    • Riggs, L.S.1
  • 37
    • 0027610716 scopus 로고
    • Construction decision support system for delay analysis
    • Yates, J.K. (1993) Construction decision support system for delay analysis. Journal of Construction Engineering and Management, 119(2), 226-44.
    • (1993) Journal of Construction Engineering and Management , vol.119 , Issue.2 , pp. 226-244
    • Yates, J.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.