-
1
-
-
0041047350
-
Re-engineering reviewed
-
2 July
-
Anon (1994), "Re-engineering reviewed", The Economist, 2 July, p. 66.
-
(1994)
The Economist
, pp. 66
-
-
-
2
-
-
0004002628
-
-
Addison-Wesley, Reading, MA
-
Argyris, C. and Schon, D. (1978), Organizational Learning: A Theory of Action Perspective, Addison-Wesley, Reading, MA.
-
(1978)
Organizational Learning: A Theory of Action Perspective
-
-
Argyris, C.1
Schon, D.2
-
4
-
-
21844504132
-
Re-engineering at American Express: The travel services group's work in process
-
Ballou, R.H. (1995), "Re-engineering at American Express: the travel services group's work in process", Interfaces, Vol. 25, pp. 22-9.
-
(1995)
Interfaces
, vol.25
, pp. 22-29
-
-
Ballou, R.H.1
-
5
-
-
0027631971
-
Does total quality management equal organizational learning?
-
July
-
Barrow, J.W. (1993), "Does total quality management equal organizational learning?", Quality Progress, July, pp. 39-43.
-
(1993)
Quality Progress
, pp. 39-43
-
-
Barrow, J.W.1
-
6
-
-
0026859891
-
Who should set CEO pay? - The press? Congress? Shareholders?
-
Brownstein, A.R. and Panner, M.J. (1992). "Who should set CEO pay? - the press? Congress? Shareholders?", Harvard Business Review, Vol. 70 No. 3, pp. 28-36.
-
(1992)
Harvard Business Review
, vol.70
, Issue.3
, pp. 28-36
-
-
Brownstein, A.R.1
Panner, M.J.2
-
7
-
-
84986077157
-
A learning process model to achieve continuous improvement and innovation
-
Buckler, B. (1996), "A learning process model to achieve continuous improvement and innovation', The Learning Organization, Vol. 3 No. 3, pp. 31-9.
-
(1996)
The Learning Organization
, vol.3
, Issue.3
, pp. 31-39
-
-
Buckler, B.1
-
9
-
-
0001798041
-
The horizontal organization
-
December
-
Byrne, J. (1993), "The horizontal organization", Business Weekly, December, Vol. 20, pp. 44-9.
-
(1993)
Business Weekly
, vol.20
, pp. 44-49
-
-
Byrne, J.1
-
10
-
-
0345413075
-
Quality assurance in the construction industry
-
Chan, A.P.C. (1996), "Quality assurance in the construction industry", Architectural Science Review, Vol. 39, pp. 107-12.
-
(1996)
Architectural Science Review
, vol.39
, pp. 107-112
-
-
Chan, A.P.C.1
-
12
-
-
2542451037
-
Business process reengineering: Nirvana or nemesis for Europe?
-
Coulson-Thomas, C.J. (Ed.), Kogan Page, London
-
Coulson-Thomas, C.J. (1994), "Business process reengineering: nirvana or nemesis for Europe?", in Coulson-Thomas, C.J. (Ed.), Business Process Reengineering: Myth and Reality, Kogan Page, London, pp. 17-39.
-
(1994)
Business Process Reengineering: Myth and Reality
, pp. 17-39
-
-
Coulson-Thomas, C.J.1
-
14
-
-
0027630926
-
Building a learning organization
-
July-August
-
Garvin, D. (1993), "Building a learning organization", Harvard Business Review, July-August, pp. 78-91.
-
(1993)
Harvard Business Review
, pp. 78-91
-
-
Garvin, D.1
-
15
-
-
0026933050
-
ADR, TQM, partnering and other management fantasies
-
Griffis, B. (1992), "ADR, TQM, partnering and other management fantasies", ASCE Journal of Professional Issues in Engineering Education and Practice, Vol. 118 No. 4, pp. 331-44
-
(1992)
ASCE Journal of Professional Issues in Engineering Education and Practice
, vol.118
, Issue.4
, pp. 331-344
-
-
Griffis, B.1
-
18
-
-
0003959960
-
-
Harvard Business School, Boston, MA
-
Hamel, G. and Prahalad, C.K. (1994), Competing for the Future, Harvard Business School, Boston, MA, p. 166.
-
(1994)
Competing for the Future
, pp. 166
-
-
Hamel, G.1
Prahalad, C.K.2
-
19
-
-
43949165743
-
Reengineering the corporation: A manifesto for business revolution
-
New York, NY
-
Hammer, M. and Champy, J. (1993), "Reengineering the corporation: a manifesto for business revolution", Harper Business, New York, NY.
-
(1993)
Harper Business
-
-
Hammer, M.1
Champy, J.2
-
23
-
-
0002245489
-
Re-engineering manufacturing processes through simulation modelling
-
Irani, Z., Hlupic, V., Baldwin, L.P. and Love, P.E.D. (1999), "Re-engineering manufacturing processes through simulation modelling", Logistics Information Management.
-
(1999)
Logistics Information Management.
-
-
Irani, Z.1
Hlupic, V.2
Baldwin, L.P.3
Love, P.E.D.4
-
24
-
-
79959628100
-
Human factors in the Australian construction industry: Towards total quality management
-
Jaafari, A. (1996), "Human factors in the Australian construction industry: towards total quality management", Australian Journal of Management, Vol.21 No. 2, pp. 159-85.
-
(1996)
Australian Journal of Management
, vol.21
, Issue.2
, pp. 159-185
-
-
Jaafari, A.1
-
26
-
-
0002605368
-
Re-thinking organizational design
-
Keidel, R.W. (1994), "Re-thinking organizational design", The Academy of Management Executive, Vol. 8 No. 4, pp. 12-30.
-
(1994)
The Academy of Management Executive
, vol.8
, Issue.4
, pp. 12-30
-
-
Keidel, R.W.1
-
27
-
-
0346726258
-
Reengineering repercussions
-
King, J. (1993), "Reengineering repercussions", Computerworld, Vol. 27 No. 26, p. 149.
-
(1993)
Computerworld
, vol.27
, Issue.26
, pp. 149
-
-
King, J.1
-
28
-
-
0003982763
-
-
Free Press, New York, NY
-
Kotter, J.P. and Haskett, J.L. (1992), Corporate Culture and Performance, Free Press, New York, NY.
-
(1992)
Corporate Culture and Performance
-
-
Kotter, J.P.1
Haskett, J.L.2
-
30
-
-
0031078052
-
Short-termism and the appraisal of AMT capital projects in the US and UK
-
Lefley, F. and Sarkis, J. (1997), "Short-termism and the appraisal of AMT capital projects in the US and UK, International Journal of Production Research, Vol. 35 No. 2, pp. 341-55.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.2
, pp. 341-355
-
-
Lefley, F.1
Sarkis, J.2
-
31
-
-
0031163927
-
Process reengineering: A review of enablers
-
Love, P.E.D. and Gunasekaran, A. (1997),"Process reengineering: a review of enablers", International Journal of Production Economics, Vol. 50 No. 2/3, pp. 183-97.
-
(1997)
International Journal of Production Economics
, vol.50
, Issue.2-3
, pp. 183-197
-
-
Love, P.E.D.1
Gunasekaran, A.2
-
32
-
-
84986135358
-
From BPR to CPR -conceptualizing re-engineering in construction
-
Love, P.E.D. and Li, H. (1998), "From BPR to CPR -conceptualizing re-engineering in construction", Business Process Management Journal, Vol. 4 No. 4, pp. 291-306.
-
(1998)
Business Process Management Journal
, vol.4
, Issue.4
, pp. 291-306
-
-
Love, P.E.D.1
Li, H.2
-
33
-
-
0031649165
-
Improving the competitiveness of manufacturing companies through continuous incremental change
-
Love, P.E.D., Gunasekaran A. and Li, H. (1998a), "Improving the competitiveness of manufacturing companies through continuous incremental change", The International Bi-Monthly for Total Quality Management: TQM Magazine, Vol. 10 No. 3, pp. 177-85.
-
(1998)
The International Bi-monthly for Total Quality Management: TQM Magazine
, vol.10
, Issue.3
, pp. 177-185
-
-
Love, P.E.D.1
Gunasekaran, A.2
Li, H.3
-
34
-
-
0032347324
-
Putting an engine into re-engineering toward a process based organization
-
Love, P.E.D., Gunasekaran, A. and Li, H. (1998b), "Putting an engine into re-engineering toward a process based organization", International Journal of Operations & Production Management, Vol. 18 No. 9, pp. 937-49
-
(1998)
International Journal of Operations & Production Management
, vol.18
, Issue.9
, pp. 937-949
-
-
Love, P.E.D.1
Gunasekaran, A.2
Li, H.3
-
35
-
-
9344228400
-
Knocking down walls and building bridges - Overcoming the problems associated with quality certification
-
Love, P.E.D. and Li, H. (1999), "Knocking down walls and building bridges - overcoming the problems associated with quality certification", Construction Management and Economics.
-
(1999)
Construction Management and Economics
-
-
Love, P.E.D.1
Li, H.2
-
36
-
-
0033096295
-
Rework: A symptom of a dysfunctional supply-chain
-
Love, P.E.D., Li, H. and Mandal, P. (1999a), "Rework: a symptom of a dysfunctional supply-chain", European Journal of Purchasing and Supply Management, No. 5 Vol. 1, pp. 1-11.
-
(1999)
European Journal of Purchasing and Supply Management
, vol.1
, Issue.5
, pp. 1-11
-
-
Love, P.E.D.1
Li, H.2
Mandal, P.3
-
37
-
-
2042443603
-
The propagation of rework benchmark metrics for construction
-
Love, P.E.D., Smith, J. and Li, H. (1999b), "The propagation of rework benchmark metrics for construction", International Journal of Quality & Reliability Management, Vol. 7 No. 16.
-
(1999)
International Journal of Quality & Reliability Management
, vol.7
, Issue.16
-
-
Love, P.E.D.1
Smith, J.2
Li, H.3
-
38
-
-
5844337041
-
Quality management systems: A study of authority and empowerment
-
Low, S.P. and Chan, F.M. (1998), "Quality management systems: a study of authority and empowerment", Building Research and Information, Vol. 25 No. 3, pp.158-69.
-
(1998)
Building Research and Information
, vol.25
, Issue.3
, pp. 158-169
-
-
Low, S.P.1
Chan, F.M.2
-
39
-
-
0003566314
-
-
AMACOM, New York, NY
-
Manganelli, R. and Klein, M.M. (1994), The Reengineering Handbook: A Step-by-step Guide to Business Transformation, AMACOM, New York, NY.
-
(1994)
The Reengineering Handbook: A Step-by-step Guide to Business Transformation
-
-
Manganelli, R.1
Klein, M.M.2
-
40
-
-
84955781722
-
Factors affecting the implementation and success of TQM
-
Mann, R. and Kehoe, D. (1996), "Factors affecting the implementation and success of TQM", International Journal of Quality & Reliability Management, Vol. 12 No. 1, pp. 11-23.
-
(1996)
International Journal of Quality & Reliability Management
, vol.12
, Issue.1
, pp. 11-23
-
-
Mann, R.1
Kehoe, D.2
-
41
-
-
9344254866
-
Change management in the French steel industry
-
Coulson-Thomas, C.J. (Ed.), Kogan Page, London
-
Maier, M. (1994), "Change management in the French steel industry", in Coulson-Thomas, C.J. (Ed.), Business Process Re-engineering: Myth and Reality, Kogan Page, London, pp. 174-82.
-
(1994)
Business Process Re-engineering: Myth and Reality
, pp. 174-182
-
-
Maier, M.1
-
42
-
-
0030386098
-
Options for applying BPR in the Australian construction industry
-
Mohamed, S. and Tucker, S.N. (1996), "Options for applying BPR in the Australian construction industry", International Journal of Project Management, Vol. 14 No. 6, pp. 379-85.
-
(1996)
International Journal of Project Management
, vol.14
, Issue.6
, pp. 379-385
-
-
Mohamed, S.1
Tucker, S.N.2
-
43
-
-
9344220428
-
The relationship between quality management practices and learning: In the Australian retail hardware sector
-
Faculty of Business and Economics, Department of Management, Monash University, Melbourne
-
Morrison, M. and Terzvioski, M. (1998), "The relationship between quality management practices and learning: in the Australian retail hardware sector", Working Paper 31/98, Faculty of Business and Economics, Department of Management, Monash University, Melbourne.
-
(1998)
Working Paper
, vol.31
, Issue.98
-
-
Morrison, M.1
Terzvioski, M.2
-
46
-
-
0442311689
-
Quality management in civil and structural engineering consulting
-
Oakland, J.S. and Aldridge, A.J. (1996), "Quality management in civil and structural engineering consulting", International Journal of Quality & Reliability Management, Vol. 12 No. 3, pp. 32-48.
-
(1996)
International Journal of Quality & Reliability Management
, vol.12
, Issue.3
, pp. 32-48
-
-
Oakland, J.S.1
Aldridge, A.J.2
-
47
-
-
0003479326
-
-
Asia Pacific Edition, Butterworth-Heinemann, Port Melbourne
-
Oakland, J.S. and Sohal, A.S. (1996), Total Quality Management - Text with Cases, Asia Pacific Edition, Butterworth-Heinemann, Port Melbourne.
-
(1996)
Total Quality Management - Text with Cases
-
-
Oakland, J.S.1
Sohal, A.S.2
-
49
-
-
0030153334
-
Broadening visions of business process re-engineering
-
Omega
-
Peppard, J. (1996), "Broadening visions of business process re-engineering", International Journal of Management Science, Omega, Vol. 24 No. 3, pp. 255-70
-
(1996)
International Journal of Management Science
, vol.24
, Issue.3
, pp. 255-270
-
-
Peppard, J.1
-
50
-
-
0030530697
-
Beyond process: TQM content and firm performance
-
Reed, R., Lemak, D.J. and Montgomery, J.C. (1996), "Beyond process: TQM content and firm performance", Academy of Management Review, Vol. 21 No. 1, pp. 173-202.
-
(1996)
Academy of Management Review
, vol.21
, Issue.1
, pp. 173-202
-
-
Reed, R.1
Lemak, D.J.2
Montgomery, J.C.3
-
52
-
-
0000457953
-
An empirical study of capital budgeting practices for strategic investments in CIM technologies
-
Slagmulder, R., Bruggeman, E. and Wassenhove, L.-V. (1995), "An empirical study of capital budgeting practices for strategic investments in CIM technologies", International Journal of Production Economics, Vol. 40 No. 2/3, pp. 121-52.
-
(1995)
International Journal of Production Economics
, vol.40
, Issue.2-3
, pp. 121-152
-
-
Slagmulder, R.1
Bruggeman, E.2
Wassenhove, L.-V.3
-
53
-
-
84986086966
-
Strategic needs analysis: Searching for viable solutions
-
School of Construction and Earth Sciences, Oxford Centre for Real Estate Management, Oxford Brookes University, 2-3 September
-
Smith, J., Jackson, N. and Wyatt, R. (1998), "Strategic needs analysis: searching for viable solutions", Proceedings of the Construction and Building Research Conference (COBRA), School of Construction and Earth Sciences, Oxford Centre for Real Estate Management, Oxford Brookes University, 2-3 September, pp. 7-21.
-
(1998)
Proceedings of the Construction and Building Research Conference (COBRA)
, pp. 7-21
-
-
Smith, J.1
Jackson, N.2
Wyatt, R.3
-
54
-
-
9344265111
-
Code of tendering for the construction industry
-
Code of Tendering, July
-
State Government of New South (1996), "Code of tendering for the construction industry", Capital Procurement Manual, Code of Tendering, July, pp. 9-10.
-
(1996)
Capital Procurement Manual
, pp. 9-10
-
-
-
55
-
-
0042443571
-
Re-engineering - A wonder drug for the 90s?
-
Coulson-Thomas, C., Kogan Page, London
-
Talwar, R. (1994), "Re-engineering - a wonder drug for the 90s?", in Coulson-Thomas, C., Business Process Re-engineering: Myth and Reality, Kogan Page, London, pp. 40-59.
-
(1994)
Business Process Re-engineering: Myth and Reality
, pp. 40-59
-
-
Talwar, R.1
-
56
-
-
0003770903
-
-
May, CSIRO, DBCE DOC 96/29 (M)
-
Tucker, S.N., Love, P.E.D, Tilley, P.A., Salomonsson, G.S., MacSporran, C. and Mohamed, S. (1996), Perspectives of Construction Contractors Communication and Performance Practices: Pilot Survey Report, May, CSIRO, DBCE DOC 96/29 (M).
-
(1996)
Perspectives of Construction Contractors Communication and Performance Practices: Pilot Survey Report
-
-
Tucker, S.N.1
Love, P.E.D.2
Tilley, P.A.3
Salomonsson, G.S.4
MacSporran, C.5
Mohamed, S.6
-
57
-
-
3543122917
-
JIT and TQM: A case for joint implementation
-
Vuppalapati, K., Ahire, S.L and Gupta, T. (1996), "JIT and TQM: a case for joint implementation", International Journal of Operations & Production Management, Vol. 15 No 5, pp. 84-94.
-
(1996)
International Journal of Operations & Production Management
, vol.15
, Issue.5
, pp. 84-94
-
-
Vuppalapati, K.1
Ahire, S.L.2
Gupta, T.3
-
58
-
-
9344267089
-
Quality management systems used by quantity surveying practices in New Zealand
-
Wilkinson, S. (1997), "Quality management systems used by quantity surveying practices in New Zealand", Asia Pacific Building and Construction Management Journal, Vol. 3 No.1, pp. 8-12.
-
(1997)
Asia Pacific Building and Construction Management Journal
, vol.3
, Issue.1
, pp. 8-12
-
-
Wilkinson, S.1
|