Resource-constrained project scheduling with renewable and non -renewable resources and time-resource tradeoffs
-
NUDTASOMBOON N, RANDHAWA S U. Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs [J]. Computers and-Industrial Engineering, 1997, 32(l): 227-242.
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.1
, pp. 277-242
-
-
Nudtasomboon, N.1
Randhawa, S.U.2
-
3
-
-
0032210246
-
A branch - and - bound procedure for the resource -constrained project scheduling problem with generalized precedence relations
-
DE REYCK B, HERROELEN W. A branch - and - bound procedure for the resource -constrained project scheduling problem with generalized precedence relations [J]. European Journal of Operational Research, 2000, 111(1): 152 -174.
-
(2000)
European Journal of Operational Research
, vol.111
, Issue.1
, pp. 152-174
-
-
de Reyck, B.1
Herroelen, W.2
-
4
-
-
0032736579
-
Resource-constrained project scheduling: notation, classification, models, and methods
-
BRUCKER P, DREXL A, et al. Resource-constrained project scheduling: notation, classification, models, and methods [J]. European Journal of Operational Research, 1999, 112(1): 3-41.
-
(1999)
European Journal of Operational Research
, vol.112
, Issue.1
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
-
5
-
-
0038188890
-
Constraint propagation and decomposition techniques for highly disjunctive and highly cumulative project scheduling problems
-
PHILIPPE B, CLAUDE LE P. Constraint propagation and decomposition techniques for highly disjunctive and highly cumulative project scheduling problems [J]. Constraints, 2000, 5(1/2): 119-139.
-
(2000)
Constraints
, vol.5
, Issue.1-2
, pp. 119-139
-
-
Philippe, B.1
Claude, L.P.2
-
6
-
-
0036182335
-
A constraint-based method for project scheduling with time windows
-
ODDI A, SMITH S F. A constraint-based method for project scheduling with time windows [J]. Journal of Heuristics, 2002, 8(1): 109-136.
-
(2002)
Journal of Heuristics
, vol.8
, Issue.1
, pp. 109-136
-
-
Oddi, A.1
Smith, S.F.2
-
7
-
-
0012442701
-
Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource -constrained project scheduling
-
FRANCK B, NEUMANN K, SCHWINDT C. Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource -constrained project scheduling [J]. OR-Spektrum, 2001, 23(3): 297-324.
-
(2001)
OR-Spektrum
, vol.23
, Issue.3
, pp. 297-324
-
-
Franck, B.1
Neumann, K.2
Schwindt, C.3
-
8
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
-
KOLISH R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation [J]. European Journal of Operational Research, 1996, 90: 320-333.
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 320-333
-
-
Kolish, R.1
-
9
-
-
0035612930
-
Project scheduling with multiple modes: A genetic algorithm
-
HARTMANN S. Project scheduling with multiple modes: A genetic algorithm [J]. Annals of Operations Research, 2001, 102(1-4): 111-135.
-
(2001)
Annals of Operations Research
, vol.102
, Issue.1-4
, pp. 111-135
-
-
Hartmann, S.1
|