-
1
-
-
0011746296
-
On solving a large-scale resource reallocation problem in production planning
-
Proceedings of a Joint German/USA Conference. Hagen, Germany, 25-26 June 1992
-
C. Dillenberger, L.F. Escudero, A. Wollensak, Wu. Zhang, On solving a large-scale resource reallocation problem in production planning. In: Operations Research in Production Planning and Control, Proceedings of a Joint German/USA Conference. Hagen, Germany, 25-26 June 1992, (1993) 105-119.
-
(1993)
Operations Research in Production Planning and Control
, pp. 105-119
-
-
Dillenberger, C.1
Escudero, L.F.2
Wollensak, A.3
Zhang, Wu.4
-
2
-
-
0031338250
-
Job-shop resource scheduling via simulating random operations
-
D. Golenko-Ginzburg, A. Gonik, Job-shop resource scheduling via simulating random operations, J. Math. Comput. Simulation 44 (1997) 427-440.
-
(1997)
J. Math. Comput. Simulation
, vol.44
, pp. 427-440
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
3
-
-
0030735291
-
Stochastic network project scheduling with non-consumable limited resources
-
D. Golenko-Ginzburg, A. Gonik, Stochastic network project scheduling with non-consumable limited resources, Int. J. Prod. Econ. 48 (1997) 29-37.
-
(1997)
Int. J. Prod. Econ.
, vol.48
, pp. 29-37
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
4
-
-
0032120296
-
A heuristic for network project scheduling with random activity durations depending on the resource reallocation
-
D. Golenko-Ginzburg, A. Gonik, A heuristic for network project scheduling with random activity durations depending on the resource reallocation, Int. J. Prod. Econ. 55 (1998) 149-162.
-
(1998)
Int. J. Prod. Econ.
, vol.55
, pp. 149-162
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
5
-
-
0000623498
-
Hierarchical control of semi-automated production systems
-
D. Golenko-Ginzburg, Z. Sinuany-Stern, Hierarchical control of semi-automated production systems, Prod. Plan. Control 4 (4) (1993) 361-370.
-
(1993)
Prod. Plan. Control
, vol.4
, Issue.4
, pp. 361-370
-
-
Golenko-Ginzburg, D.1
Sinuany-Stern, Z.2
-
6
-
-
0028462456
-
Kanban Systems as a manufacturing control system with feedback
-
A.A. Pervozvanskiy, I.Ye. Sheynis, Kanban Systems as a manufacturing control system with feedback, J. Comput. Syst. Sci. Int. 32 (4) (1994) 153-157.
-
(1994)
J. Comput. Syst. Sci. Int.
, vol.32
, Issue.4
, pp. 153-157
-
-
Pervozvanskiy, A.A.1
Sheynis, I.Ye.2
-
7
-
-
0038654496
-
Why projects are always late: A rational based on simulation of a PERT/CPM network
-
R.I. Shoenberger, Why projects are always late: a rational based on simulation of a PERT/CPM network, Interfaces 11 (5) (1981) 66-70.
-
(1981)
Interfaces
, vol.11
, Issue.5
, pp. 66-70
-
-
Shoenberger, R.I.1
-
8
-
-
0003480493
-
-
Prentice-hall, Englewood Cliffs, NJ
-
A. Shtub, J. Bard, S. Globerson, Project Management: Engineering, Technology and Implementation, Prentice-hall, Englewood Cliffs, NJ, 1994.
-
(1994)
Project Management: Engineering, Technology and Implementation
-
-
Shtub, A.1
Bard, J.2
Globerson, S.3
|