-
1
-
-
0346967201
-
Scheduling stochastic jobs with a two-room distribution on two parallel machines
-
E.G. Coffman, M. Hofri, G. Weiss, Scheduling stochastic jobs with a two-room distribution on two parallel machines, Probab. Engnr. Informat. Sci. 35 (1989) 164-176.
-
(1989)
Probab. Engnr. Informat. Sci.
, vol.35
, pp. 164-176
-
-
Coffman, E.G.1
Hofri, M.2
Weiss, G.3
-
2
-
-
0346967199
-
Heuristics in industrial stochastic job-shop scheduling
-
April 20, Ben-Gurion University of the Negev, Beer-Sheva, 3.2.1
-
D. Golenko-Ginzburg, Sh. Kesler, Heuristics in industrial stochastic job-shop scheduling, Proceedings of the 8th Conference of Industrial Engineering and Management, April 20, Ben-Gurion University of the Negev, Beer-Sheva, 3.2.1., (1994), pp. 1-6.
-
(1994)
Proceedings of the 8th Conference of Industrial Engineering and Management
, pp. 1-6
-
-
Golenko-Ginzburg, D.1
Kesler, Sh.2
-
3
-
-
0006668942
-
Industrial job-shop scheduling with random operations and different priorities
-
D. Golenko-Ginzburg, Sh. Kesler, Z. Landsman, Industrial job-shop scheduling with random operations and different priorities, Int. J. of Prod. Econ. 40 (1995) 185-195.
-
(1995)
Int. J. of Prod. Econ.
, vol.40
, pp. 185-195
-
-
Golenko-Ginzburg, D.1
Kesler, Sh.2
Landsman, Z.3
-
4
-
-
0025494667
-
On the optimal order of M machines in tandem
-
C.C. Huang, G. Weiss, On the optimal order of M machines in tandem, Oper. Res. Lett. 9 (1990) 299-303.
-
(1990)
Oper. Res. Lett.
, vol.9
, pp. 299-303
-
-
Huang, C.C.1
Weiss, G.2
-
5
-
-
0019899745
-
Minimizing the expected makespan in stochastic flow shops
-
M. Pinedo, Minimizing the expected makespan in stochastic flow shops, Oper. Res. 30 (1982) 148-162.
-
(1982)
Oper. Res.
, vol.30
, pp. 148-162
-
-
Pinedo, M.1
-
6
-
-
0020748381
-
Stochastic scheduling with release dates and due dates
-
M. Pinedo, Stochastic scheduling with release dates and due dates, Oper. Res. 31 (1983) 559-572.
-
(1983)
Oper. Res.
, vol.31
, pp. 559-572
-
-
Pinedo, M.1
-
7
-
-
0018516179
-
Scheduling of stochastic tasks on two parallel processors
-
M. Pinedo, G. Weiss, Scheduling of stochastic tasks on two parallel processors, Naval Res. Logistics Quarterly 26 (1979) 527-535.
-
(1979)
Naval Res. Logistics Quarterly
, vol.26
, pp. 527-535
-
-
Pinedo, M.1
Weiss, G.2
-
8
-
-
0023455917
-
The largest variance first policy in some stochastic scheduling problems
-
M. Pinedo, G. Weiss, The largest variance first policy in some stochastic scheduling problems, Oper. Res. 35 (1987) 884-891.
-
(1987)
Oper. Res.
, vol.35
, pp. 884-891
-
-
Pinedo, M.1
Weiss, G.2
-
9
-
-
0022778635
-
Scheduling jobs with stochastically ordered processing times on parallel machines to minimize expected flow time
-
R.R. Weber, P. Varaiya, J. Warland, Scheduling jobs with stochastically ordered processing times on parallel machines to minimize expected flow time, J. Appl. Probab. 23 (1986) 841-847.
-
(1986)
J. Appl. Probab.
, vol.23
, pp. 841-847
-
-
Weber, R.R.1
Varaiya, P.2
Warland, J.3
-
10
-
-
0020100028
-
Scheduling jobs with stochastic processing requirements on parallel machines to minimize makespan of flow times
-
R.R. Weber, Scheduling jobs with stochastic processing requirements on parallel machines to minimize makespan of flow times, J. Appl. Probab. 19 (1982) 167-182.
-
(1982)
J. Appl. Probab.
, vol.19
, pp. 167-182
-
-
Weber, R.R.1
-
12
-
-
0347598060
-
-
Graduate School of Management, Faculty of Economics and Politics, Monash University, Clayton, Victoria, Australia (internal report)
-
C. White, Factory control systems. Graduate School of Management, Faculty of Economics and Politics, Monash University, Clayton, Victoria, Australia (internal report).
-
Factory Control Systems
-
-
White, C.1
|