Volumn 41, Issue 5, 2003, Pages 981-994

Scheduling complex job shops using disjunctive graphs: A cycle elimination procedure

Author keywords

[No Author keywords available]

Indexed keywords

GRAPH THEORY; HEURISTIC METHODS; JOB ANALYSIS; MATHEMATICAL MODELS; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0242364617     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540210163009     Document Type: Article
Times cited : (29)

References (21)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • ADAMS, J., BALAS, E. and ZAWACK, D., 1988, The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391-401.
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0001507294 scopus 로고
    • Batching and scheduling job shop on batch and discrete processors
    • AHMADI, J. H., AHMADI, R. H., DASU, S. and TANG, C. S., 1992, Batching and scheduling job shop on batch and discrete processors. Operations Research, 40, 750-763.
    • (1992) Operations Research , vol.40 , pp. 750-763
    • Ahmadi, J.H.1    Ahmadi, R.H.2    Dasu, S.3    Tang, C.S.4
  • 3
    • 0029195265 scopus 로고
    • The one-machine problem with delayed precedence constraints and its use in job shop scheduling
    • BALAS, E., LENSTRA, J. K. and VAZACOPOULOS, A., 1995, The one-machine problem with delayed precedence constraints and its use in job shop scheduling. Management Science, 41, 94-109.
    • (1995) Management Science , vol.41 , pp. 94-109
    • Balas, E.1    Lenstra, J.K.2    Vazacopoulos, A.3
  • 7
    • 0030151057 scopus 로고    scopus 로고
    • Machine criticality measures and subproblem solution procedures in shifting bottleneck methods: A computational study
    • HOLTSCLAW, H. H. and UZSOY, R., 1996, Machine criticality measures and subproblem solution procedures in shifting bottleneck methods: a computational study. Journal of Operational Research Society, 47, 666-677.
    • (1996) Journal of Operational Research Society , vol.47 , pp. 666-677
    • Holtsclaw, H.H.1    Uzsoy, R.2
  • 8
    • 0031383019 scopus 로고    scopus 로고
    • Production sequencing problem with reentrant work flows and sequence dependent setup times
    • HWANG, H. and SUN, J. U., 1997, Production sequencing problem with reentrant work flows and sequence dependent setup times. Computers & Industrial Engineering, 33, 773-776.
    • (1997) Computers & Industrial Engineering , vol.33 , pp. 773-776
    • Hwang, H.1    Sun, J.U.2
  • 10
    • 0030232128 scopus 로고    scopus 로고
    • Mean flow time minimization in reentrant job shops with a hub
    • KUBIAK, W., Lou, S. X. C. and WANG, Y., 1996, Mean flow time minimization in reentrant job shops with a hub. Operations Research, 44, 764-776.
    • (1996) Operations Research , vol.44 , pp. 764-776
    • Kubiak, W.1    Lou, S.X.C.2    Wang, Y.3
  • 11
    • 0032804081 scopus 로고    scopus 로고
    • Minimizing makespan on a single batch processing machine with dynamic job arrivals
    • LEE, C. Y. and UZSOY, R., 1999, Minimizing makespan on a single batch processing machine with dynamic job arrivals. International Journal of Production Research, 37, 219-236.
    • (1999) International Journal of Production Research , vol.37 , pp. 219-236
    • Lee, C.Y.1    Uzsoy, R.2
  • 12
    • 0034428049 scopus 로고    scopus 로고
    • Maximizing delivery performance in semiconductor wafer fabs
    • J. A. Joines, R. R. Barton, K. Kang and P. A. Fishwick (eds)
    • MASON, S. J. and FOWLER, J. W., 2000, Maximizing delivery performance in semiconductor wafer fabs. In J. A. Joines, R. R. Barton, K. Kang and P. A. Fishwick (eds), Proceedings of the 2000 Winter Simulation Conference, pp. 1458-1463.
    • (2000) Proceedings of the 2000 Winter Simulation Conference , pp. 1458-1463
    • Mason, S.J.1    Fowler, J.W.2
  • 13
    • 0042622980 scopus 로고    scopus 로고
    • A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
    • MASON, S. J., FOWLER, J. W. and CARLYLE, W. M., 2002a, A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops. Journal of Scheduling, 5(3), 247-262.
    • (2002) Journal of Scheduling , vol.5 , Issue.3 , pp. 247-262
    • Mason, S.J.1    Fowler, J.W.2    Carlyle, W.M.3
  • 18
    • 0033079535 scopus 로고    scopus 로고
    • A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop
    • PINEDO, M. L. and SINGER, M., 1999, A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. Naval Research Logistics, 46, 1-17.
    • (1999) Naval Research Logistics , vol.46 , pp. 1-17
    • Pinedo, M.L.1    Singer, M.2
  • 20
    • 0029387205 scopus 로고
    • Scheduling batch processing machines with incompatible job families
    • UZSOY, R., 1995, Scheduling batch processing machines with incompatible job families. International Journal of Production Research, 33, 2685-2708.
    • (1995) International Journal of Production Research , vol.33 , pp. 2685-2708
    • Uzsoy, R.1
  • 21
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part 1: System characteristics, performance evaluation and production planning
    • UZSOY, R., LEE, C. Y. and MARTIN-VEGA, L. A., 1992, A review of production planning and scheduling models in the semiconductor industry part 1: system characteristics, performance evaluation and production planning. IIE Transactions, 24, 47-60.
    • (1992) IIE Transactions , vol.24 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.