-
1
-
-
0024865074
-
Simulating a just-in-time production system
-
Sarker B.R. Simulating a just-in-time production system. Computers and Industrial Engineering. 16:1989;127-137.
-
(1989)
Computers and Industrial Engineering
, vol.16
, pp. 127-137
-
-
Sarker, B.R.1
-
2
-
-
0000901840
-
Finite queues in series with exponential or erlang service times-a numerical approach
-
Hillier F.S., Roling R.W. Finite queues in series with exponential or erlang service times-a numerical approach. Operations Research. 14:1967;286-296.
-
(1967)
Operations Research
, vol.14
, pp. 286-296
-
-
Hillier, F.S.1
Roling, R.W.2
-
3
-
-
0020869039
-
A computer simulation study of manual flow lines
-
Hira D.S., Pandey P.C. A computer simulation study of manual flow lines. Journal of Manufacturing Systems. 2(2):1983;117-125.
-
(1983)
Journal of Manufacturing Systems
, vol.2
, Issue.2
, pp. 117-125
-
-
Hira, D.S.1
Pandey, P.C.2
-
4
-
-
0343313265
-
Analysis of the necessary conditions for implementing JIT production
-
St. Louis, MO
-
P.Y. Huang, Analysis of the necessary conditions for implementing JIT production, Zero Inventory Philosophy and Practice Seminar Proceedings, St. Louis, MO, (1984), pp. 24-29.
-
(1984)
Zero Inventory Philosophy and Practice Seminar Proceedings
, pp. 24-29
-
-
Huang, P.Y.1
-
5
-
-
84989486136
-
A simulation of the Japanese JIT techniques (with kanban) for multi-line, multi-stage production systems
-
Huang P.Y., Rees L.P., Taylor R.W. A simulation of the Japanese JIT techniques (with kanban) for multi-line, multi-stage production systems. Decision Science. 14:1983;326-344.
-
(1983)
Decision Science
, vol.14
, pp. 326-344
-
-
Huang, P.Y.1
Rees, L.P.2
Taylor, R.W.3
-
6
-
-
0022111332
-
Just in time (JIT) with kanban manufacturing system simulation on a microcomputer
-
Schroer B.J., Black J.T., Zhang S.X. Just in time (JIT) with kanban manufacturing system simulation on a microcomputer. Simulation. 45:1985;52-70.
-
(1985)
Simulation
, vol.45
, pp. 52-70
-
-
Schroer, B.J.1
Black, J.T.2
Zhang, S.X.3
-
7
-
-
0023365980
-
Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of lead-time
-
Rees L.P., Philipoom P.R., Taylor III B.W., Huang P.Y. Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of lead-time. IIE Transactions. 19(12):1987;199-207.
-
(1987)
IIE Transactions
, vol.19
, Issue.12
, pp. 199-207
-
-
Rees, L.P.1
Philipoom, P.R.2
Taylor B.W. III3
Huang, P.Y.4
-
8
-
-
0023859422
-
The effect of imbalance in a just-in-time production system: A simulation study
-
Sarker B.R., Harris R.D. The effect of imbalance in a just-in-time production system: A simulation study. International Journal of Production Research. 26(1):1988;1-18.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.1
, pp. 1-18
-
-
Sarker, B.R.1
Harris, R.D.2
-
9
-
-
0024748621
-
The performance of push and pull systems: A simulation and comparative study
-
Sarker B.R., Fitzsimmons J.A. The performance of push and pull systems: A simulation and comparative study. International Journal of Production Research. 27(10):1989;1715-1731.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.10
, pp. 1715-1731
-
-
Sarker, B.R.1
Fitzsimmons, J.A.2
-
13
-
-
0027353436
-
Determining the number of kanbans in multi-item just-in-time system
-
Askin R.G., Mtwasi M.G., Goldberg J.B. Determining the number of kanbans in multi-item just-in-time system. IIE Transactions. 25(1):1993;89-98.
-
(1993)
IIE Transactions
, vol.25
, Issue.1
, pp. 89-98
-
-
Askin, R.G.1
Mtwasi, M.G.2
Goldberg, J.B.3
-
15
-
-
0001586244
-
Simulation constructs for computer - integrated just In time production systems: An object - oriented approach
-
Horng H., Cochran J.K. Simulation constructs for computer - integrated just In time production systems: an object - oriented approach. International Computer Integrated Manufacturing. 11(2):1998;130-141.
-
(1998)
International Computer Integrated Manufacturing
, vol.11
, Issue.2
, pp. 130-141
-
-
Horng, H.1
Cochran, J.K.2
-
16
-
-
0023168266
-
Optimization of a complex flow line for printed circuit board fabrication by computer simulation
-
Lin L., Cochran J.K. Optimization of a complex flow line for printed circuit board fabrication by computer simulation. Journal of Manufacturing Systems. 6:1987;47-57.
-
(1987)
Journal of Manufacturing Systems
, vol.6
, pp. 47-57
-
-
Lin, L.1
Cochran, J.K.2
-
17
-
-
0010848654
-
An examination of routing flexibility for small batch assembly of printed circuit boards
-
Taylor D., Gravers R.J. An examination of routing flexibility for small batch assembly of printed circuit boards. International Journal Production Research. 28(11):1990;2117-2135.
-
(1990)
International Journal Production Research
, vol.28
, Issue.11
, pp. 2117-2135
-
-
Taylor, D.1
Gravers, R.J.2
-
19
-
-
0342878252
-
Designing a surface mount technology line with simulation
-
December
-
A.S. Kiran, Designing a surface mount technology line with simulation, Industrial Engineering, December (1993), 56-58.
-
(1993)
Industrial Engineering
, pp. 56-58
-
-
Kiran, A.S.1
-
20
-
-
0343313254
-
Comparative study of heuristics for optimal printed circuit board assembly
-
IEEE, New York
-
K.M. Nelson, L.T. Wille, Comparative study of heuristics for optimal printed circuit board assembly, Southcan/95 Conference, Conference Record (cat.no.95 CH35773), IEEE, New York, 1995.
-
(1995)
Southcan/95 Conference, Conference Record (Cat.no.95 CH35773)
-
-
Nelson, K.M.1
Wille, L.T.2
-
21
-
-
0031374664
-
A bicriteria model for loading on PCB assembly machines
-
Rajkumar K., Narendran T.T. A bicriteria model for loading on PCB assembly machines. Production Planning and Control. 8(8):1997;743-752.
-
(1997)
Production Planning and Control
, vol.8
, Issue.8
, pp. 743-752
-
-
Rajkumar, K.1
Narendran, T.T.2
-
22
-
-
0000814799
-
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process
-
Kim Y.D., Lim H.G., Park M.W. Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process. European Journal of Operational Research. 91:1996;124-143.
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 124-143
-
-
Kim, Y.D.1
Lim, H.G.2
Park, M.W.3
-
23
-
-
0032021554
-
A genetic algorithm approach to scheduling PCBs on a single machine
-
Malmon O.Z., Braha D. A genetic algorithm approach to scheduling PCBs on a single machine. International Journal of Production Research. 36(3):1998;761-784.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.3
, pp. 761-784
-
-
Malmon, O.Z.1
Braha, D.2
-
25
-
-
0032117098
-
A heuristic for sequencing PCB assembly to minimize set-up times
-
Rajkumar K., Narendran T.T. A heuristic for sequencing PCB assembly to minimize set-up times. Production Planning and Control. 9(5):1998;465-476.
-
(1998)
Production Planning and Control
, vol.9
, Issue.5
, pp. 465-476
-
-
Rajkumar, K.1
Narendran, T.T.2
-
27
-
-
0016518731
-
The construction and implementation of metamodels
-
R.W. Blanning, The construction and implementation of metamodels, Simulation (1975) 177-184.
-
(1975)
Simulation
, pp. 177-184
-
-
Blanning, R.W.1
-
28
-
-
0018430630
-
Regression metamodels for generalizing simulation results
-
J.P.C. Kleijnen, Regression metamodels for generalizing simulation results, IEEE Transactions on Systems, Man, and Cybernetics, SMC9 (2) (1979) 93-96.
-
(1979)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.SMC9
, Issue.2
, pp. 93-96
-
-
Kleijnen, J.P.C.1
-
30
-
-
0025675310
-
Simulation in manufacturing: A regression metamodel approach
-
Madu C.N. Simulation in manufacturing: a regression metamodel approach. Computers and Industrial Engineering. 18(3):1990;381-389.
-
(1990)
Computers and Industrial Engineering
, vol.18
, Issue.3
, pp. 381-389
-
-
Madu, C.N.1
-
32
-
-
0009859316
-
Simulation optimization: A comprehensive review on theory and applications
-
Bilkent University, Ankara, Turkey
-
E. Tekin, I. Sabuncuoglu, Simulation optimization: A comprehensive review on theory and applications, Technical report, Bilkent University, Ankara, Turkey, 1998.
-
(1998)
Technical Report
-
-
Tekin, E.1
Sabuncuoglu, I.2
-
33
-
-
85039061617
-
Metamodels for simulation input-output relations
-
in: J.J. Swain, D. Goldsman, R.C. Crain, J.R. Wilson (Eds.)
-
R.R. Barton, Metamodels for simulation input-output relations, in: J.J. Swain, D. Goldsman, R.C. Crain, J.R. Wilson (Eds.), Proceedings of the 1992 Winter Simulation Conference, 1992, pp. 289-299.
-
(1992)
Proceedings of the 1992 Winter Simulation Conference
, pp. 289-299
-
-
Barton, R.R.1
-
34
-
-
0026819893
-
Group screening and Taguchi design in the optimization of multi-echolen maintenance float simulation metamodels
-
Madu C.N., Kuei C. Group screening and Taguchi design in the optimization of multi-echolen maintenance float simulation metamodels. Computers and Operation Research. 19(3):1992;95-105.
-
(1992)
Computers and Operation Research
, vol.19
, Issue.3
, pp. 95-105
-
-
Madu, C.N.1
Kuei, C.2
-
35
-
-
0025659820
-
Estimating simulation metamodel parameters for unexpected shop floor real time events
-
Lin L., Cochran J.K. Estimating simulation metamodel parameters for unexpected shop floor real time events. Computers and Industrial Engineering. 19(1-4):1990;662-666.
-
(1990)
Computers and Industrial Engineering
, vol.19
, Issue.14
, pp. 662-666
-
-
Lin, L.1
Cochran, J.K.2
-
37
-
-
0030235039
-
Computer aided planning and design of manufacturing simulation experiments
-
Ozdemirel N.E., Yurttas G.Y., Koksal G. Computer aided planning and design of manufacturing simulation experiments. Simulation. 67(3):1996;171-191.
-
(1996)
Simulation
, vol.67
, Issue.3
, pp. 171-191
-
-
Ozdemirel, N.E.1
Yurttas, G.Y.2
Koksal, G.3
-
38
-
-
0022130884
-
Validating the simulation metamodel: Some practical approaches
-
L.W. Friedman, H.H. Friedman, Validating the simulation metamodel: Some practical approaches, Simulation (1985), 144-146.
-
(1985)
Simulation
, pp. 144-146
-
-
Friedman, L.W.1
Friedman, H.H.2
-
40
-
-
0025474435
-
Vrieze, Metamodeling and experimental design: Case study of the greenhouse effect
-
Rotmans J. Vrieze, Metamodeling and experimental design: case study of the greenhouse effect. European Journal of Operational Research. 47:1990;317-329.
-
(1990)
European Journal of Operational Research
, vol.47
, pp. 317-329
-
-
Rotmans, J.1
|