메뉴 건너뛰기




Volumn 3, Issue , 1999, Pages 175-185

Quantitative selection of inspection plans

Author keywords

[No Author keywords available]

Indexed keywords

ENGINEERING RESEARCH; INSPECTION; PROBABILITY DISTRIBUTIONS; SIMULATED ANNEALING;

EID: 0043136078     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/DETC99/DTM-8759     Document Type: Conference Paper
Times cited : (14)

References (28)
  • 2
    • 0021376008 scopus 로고
    • 1/2Economic Selection of Quality of Manufactured Product
    • 1/2 Technometrics 26
    • Bisgaard, S., W. G. Hunter and L. Pallesen (1984) 1/2Economic Selection of Quality of Manufactured Product. 1/2 Technometrics 26, pp. 9-18.
    • (1984) , pp. 9-18
    • Bisgaard, S.1    Hunter, W. G.2    Pallesen, L.3
  • 3
    • 0024607249 scopus 로고
    • 1/2Economic Selection of a Process Level under Acceptance Sampling by Variables
    • Carlsson, O. (1989) 1/2Economic Selection of a Process Level under Acceptance Sampling by Variables. 1/2 Engineering Costs and Production Economics 16, pp. 69-78.
    • (1989) 1/2 Engineering Costs and Production Economics , vol.16 , pp. 69-78
    • Carlsson, O.1
  • 4
    • 0023315289 scopus 로고
    • 1/2Strategic Allocation of Inspection Effort in a Serial, Multi-Product Production System
    • Chakravarty, A. K. and A. Shtub (1987) 1/2Strategic Allocation of Inspection Effort in a Serial, Multi-Product Production System. 1/2 HE Transactions 19(1), pp. 13-22.
    • (1987) 1/2 HE Transactions , vol.19 , Issue.1 , pp. 13-22
    • Chakravarty, A. K.1    Shtub, A.2
  • 5
    • 0030412884 scopus 로고    scopus 로고
    • 1/2Selection of the Optimal Precision Level and Target Value for a Production Process; The Lower-Specification-Limit Case
    • Chen, S.-L. and K.-J. Chung (1996) 1/2Selection of the Optimal Precision Level and Target Value for a Production Process; The Lower-Specification-Limit Case. 1/2 HE Transactions 28, pp. 979-985.
    • (1996) 1/2 HE Transactions , vol.28 , pp. 979-985
    • Chen, S.-L.1    Chung, K.-J.2
  • 9
    • 0030716696 scopus 로고    scopus 로고
    • 1/2Swept Envelopes of Cutting Tools in Integrated Machine and Workpiece Error Budgeting
    • Frey, D. D., K. N. Otto and W. Pflager (1997) 1/2Swept Envelopes of Cutting Tools in Integrated Machine and Workpiece Error Budgeting. 1/2 CIRP Annals - Manufacturing Technology 46(1), pp. 475-480.
    • (1997) 1/2 CIRP Annals - Manufacturing Technology , vol.46 , Issue.1 , pp. 475-480
    • Frey, D. D.1    Otto, K. N.2    Pflager, W.3
  • 10
    • 0032051013 scopus 로고    scopus 로고
    • 1/2Generalized 3-D Tolerance Analysis of Mechanical Assemblies with Small Kinematic Adjustments
    • Gao, J., K. W. Chase and S. P. Magleby (1998) 1/2Generalized 3-D Tolerance Analysis of Mechanical Assemblies with Small Kinematic Adjustments. 1/2 HE Transactions 30, pp. 367-377.
    • (1998) 1/2 HE Transactions , vol.30 , pp. 367-377
    • Gao, J.1    Chase, K. W.2    Magleby, S. P.3
  • 11
    • 0031364986 scopus 로고    scopus 로고
    • 1/2Double-Stage Inspection for Screening Multi-Characteristic Items
    • Greenshtein, E. and G. Rabinowitz (1997) 1/2Double-Stage Inspection for Screening Multi-Characteristic Items.' Transactions 29, pp. 1057-1061.
    • (1997) Transactions , vol.29 , pp. 1057-1061
    • Greenshtein, E.1    Rabinowitz, G.2
  • 13
    • 0017542244 scopus 로고
    • 1/2Determining the Most Profitable Target Value for a Production Process
    • Hunter, W. G. and C. P. Kartha (1977) 1/2Determining the Most Profitable Target Value for a Production Process. 1/2 Journal of Quality Technology) 9, pp. 16-25.
    • (1977) 1/2 Journal of Quality Technology) , vol.9 , pp. 16-25
    • Hunter, W. G.1    Kartha, C. P.2
  • 17
    • 0021462572 scopus 로고
    • 1/2The Effects of Variability in Inspection Error
    • Menzefricke, E. (1984) 1/2The Effects of Variability in Inspection Error. 1/2 Journal of Quality Technology 16, pp. 131- 135.
    • (1984) 1/2 Journal of Quality Technology , vol.16 , pp. 131-135
    • Menzefricke, E.1
  • 19
    • 0031356641 scopus 로고    scopus 로고
    • 1/2Optimal and Heuristic Inspection Schedules for Multistage Production Systems. 1/2 1/2
    • Rabinowitz, G. and H. Emmons (1997) 1/2Optimal and Heuristic Inspection Schedules for Multistage Production Systems. 1/2 1/2//^ Transactions 29, pp. 1063-1071.
    • (1997) Transactions , vol.29 , pp. 1063-1071
    • Rabinowitz, G.1    Emmons, H.2
  • 21
    • 85101438899 scopus 로고    scopus 로고
    • 1/2 IBM Research July 29, 1998. (White Paper). JJ HE J9 1/2'IOn Interpreting Key 185
    • Srinivasan, V. (1998) Characteristics. 1/2 IBM Research July 29, 1998. (White Paper). JJ HE J9 1/2'IOn Interpreting Key 185
    • (1998) Characteristics
    • Srinivasan, V.1
  • 23
    • 0031094404 scopus 로고    scopus 로고
    • 1/2Constrained threedimensional component layout using simulated annealing. 1/2 Journal of Mechanical Design
    • Szykman, S. and J. Cagan (1997) 1/2Constrained threedimensional component layout using simulated annealing. 1/2 Journal of Mechanical Design, Transactions of the ASME 119(1), pp. 28-35.
    • (1997) Transactions of the ASME , vol.119 , Issue.1 , pp. 28-35
    • Szykman, S.1    Cagan, J.2
  • 24
    • 85101446230 scopus 로고    scopus 로고
    • 1/2A Mathematical Framework for the Key Characteristics Process
    • 1/2 Research in Engineering Design Theory Applications and Concurrent Engineering, (submitted November 1998)
    • Thornton, A. C. (1998a) 1/2A Mathematical Framework for the Key Characteristics Process. 1/2 Research in Engineering Design - Theory Applications and Concurrent Engineering, (submitted November 1998).
    • (1998)
    • Thornton, A. C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.