-
1
-
-
0036364105
-
Immediate placement in extraction sites followed by immediate loading: A pilot study and case presentation
-
Aires I, Berger J. Immediate placement in extraction sites followed by immediate loading: a pilot study and case presentation. Implant Dent 2002; 11:87-94.
-
(2002)
Implant Dent
, vol.11
, pp. 87-94
-
-
Aires, I.1
Berger, J.2
-
2
-
-
0036618444
-
Immediate loading of single-tooth ITI implants in the anterior maxilla: A prospective 5-year pilot study
-
Andersen E, Haanaes HR, Knutsen BM. Immediate loading of single-tooth ITI implants in the anterior maxilla: a prospective 5-year pilot study. Clin Oral Implants Res 2002; 13:281-287.
-
(2002)
Clin Oral Implants Res
, vol.13
, pp. 281-287
-
-
Andersen, E.1
Haanaes, H.R.2
Knutsen, B.M.3
-
3
-
-
0031151465
-
Immediate loading of Brånemark implants in edentulous mandibles. A preliminary report
-
Balshi TJ, Wolfinger GJ. Immediate loading of Brånemark implants in edentulous mandibles. A preliminary report. Implant Dent 1997; 6:83-88.
-
(1997)
Implant Dent
, vol.6
, pp. 83-88
-
-
Balshi, T.J.1
Wolfinger, G.J.2
-
4
-
-
0033302136
-
Brånemark Novum. A new treatment concept for rehabilitation of the edentulous mandible preliminary results from a prospective clinical follow-up study
-
Brånemark PI, Engstrand P, Öhrnell LO, et al. Brånemark Novum. A new treatment concept for rehabilitation of the edentulous mandible preliminary results from a prospective clinical follow-up study. Clin Implant Dent Relat Res 1999; 1:2-16.
-
(1999)
Clin Implant Dent Relat Res
, vol.1
, pp. 2-16
-
-
Brånemark, P.I.1
Engstrand, P.2
Öhrnell, L.O.3
-
5
-
-
0035232768
-
Preliminary report of immediately loaded Altiva Natural Tooth Replacement dental implants
-
Buchs AU, Levine L, Moy P. Preliminary report of immediately loaded Altiva Natural Tooth Replacement dental implants. Clin Implant Dent Relat Res 2001; 3:97-106.
-
(2001)
Clin Implant Dent Relat Res
, vol.3
, pp. 97-106
-
-
Buchs, A.U.1
Levine, L.2
Moy, P.3
-
6
-
-
0035290094
-
Immediate loading of single-tooth implants: Immediate versus non-immediate implantation. A clinical report
-
Chaushu G, Chaushu S, Tzohar A, Dayan D. Immediate loading of single-tooth implants: immediate versus non-immediate implantation. A clinical report. Int J Oral Maxillofac Implants 2001; 16:267-272.
-
(2001)
Int J Oral Maxillofac Implants
, vol.16
, pp. 267-272
-
-
Chaushu, G.1
Chaushu, S.2
Tzohar, A.3
Dayan, D.4
-
7
-
-
0035407071
-
Implant-retained mandibular overdentures with Brånemark System MkII implants: A prospective comparative study between delayed and immediate loading
-
Chiapasco M, Abati S, Romeo E, Vogel G. Implant-retained mandibular overdentures with Brånemark System MkII implants: a prospective comparative study between delayed and immediate loading. Int J Oral Maxillofac Implants 2001; 16:537-546.
-
(2001)
Int J Oral Maxillofac Implants
, vol.16
, pp. 537-546
-
-
Chiapasco, M.1
Abati, S.2
Romeo, E.3
Vogel, G.4
-
8
-
-
0031061750
-
Implant-retained mandibular overdentures with immediate loading. A retrospective multicenter study on 226 consecutive cases
-
Chiapasco M, Gatti C, Rossi E, Haefliger W, Markwalder TH. Implant-retained mandibular overdentures with immediate loading. A retrospective multicenter study on 226 consecutive cases. Clin Oral Implants Res 1997; 8:48-57.
-
(1997)
Clin Oral Implants Res
, vol.8
, pp. 48-57
-
-
Chiapasco, M.1
Gatti, C.2
Rossi, E.3
Haefliger, W.4
Markwalder, T.H.5
-
9
-
-
0035748705
-
The Hong Kong Bridge Protocol. Immediate loading of mandibular Brånemark fixtures using a fixed provisional prosthesis: Preliminary results
-
Chow J, Hui E, Liu J, et al. The Hong Kong Bridge Protocol. Immediate loading of mandibular Brånemark fixtures using a fixed provisional prosthesis: preliminary results. Clin Implant Dent Relat Res 2001; 3:166-174.
-
(2001)
Clin Implant Dent Relat Res
, vol.3
, pp. 166-174
-
-
Chow, J.1
Hui, E.2
Liu, J.3
-
10
-
-
0035228432
-
Immediate loading of implant-fixed mandibular prostheses: A prospective 18-month follow-up clinical study - Preliminary report
-
Colomina LE. Immediate loading of implant-fixed mandibular prostheses: a prospective 18-month follow-up clinical study - preliminary report. Implant Dent 2001; 10:23-29.
-
(2001)
Implant Dent
, vol.10
, pp. 23-29
-
-
Colomina, L.E.1
-
11
-
-
0035291732
-
A multicenter 12-month evaluation of single-tooth implants restored 3 weeks after 1-stage surgery
-
Cooper L, Felton D, Kugelberg C, et al. A multicenter 12-month evaluation of single-tooth implants restored 3 weeks after 1-stage surgery. Int J Oral Maxillofac Implants 2001; 16:182-192.
-
(2001)
Int J Oral Maxillofac Implants
, vol.16
, pp. 182-192
-
-
Cooper, L.1
Felton, D.2
Kugelberg, C.3
-
12
-
-
0036632724
-
Immediate mandibular rehabilitation with endosseous implants: Simultaneous extraction, implant placement, and loading
-
Cooper LF, Rahman A, Moriarty J, Chaffee N, Sacco D. Immediate mandibular rehabilitation with endosseous implants: simultaneous extraction, implant placement, and loading. Int J Oral Maxillofac Implants 2002; 17:517-525.
-
(2002)
Int J Oral Maxillofac Implants
, vol.17
, pp. 517-525
-
-
Cooper, L.F.1
Rahman, A.2
Moriarty, J.3
Chaffee, N.4
Sacco, D.5
-
13
-
-
0035748589
-
Fixed mandibular restorations on three early-loaded regular platform Brånemark implants
-
De Bruyn H, Kisch J, Collaert B, Linden U, Nilner K, Dvarsater L. Fixed mandibular restorations on three early-loaded regular platform Brånemark implants. Clin Implant Dent Relat Res 2001; 3:176-184.
-
(2001)
Clin Implant Dent Relat Res
, vol.3
, pp. 176-184
-
-
De Bruyn, H.1
Kisch, J.2
Collaert, B.3
Linden, U.4
Nilner, K.5
Dvarsater, L.6
-
14
-
-
0034139628
-
Immediate functional loading of Brånemark single tooth implants
-
Ericsson I, Nilsson H, Lindh T, Nilner K, Randow K. Immediate functional loading of Brånemark single tooth implants. Clin Oral Implants Res 2000; 11:26-33.
-
(2000)
Clin Oral Implants Res
, vol.11
, pp. 26-33
-
-
Ericsson, I.1
Nilsson, H.2
Lindh, T.3
Nilner, K.4
Randow, K.5
-
15
-
-
0028511668
-
Clinical and radiographical features of submerged and non-submerged implants
-
Ericsson I, Randow K, Glantz PO, Lindhe J, Nilner K. Clinical and radiographical features of submerged and non-submerged implants. Clin Oral Implants Res 1994; 5:185-189.
-
(1994)
Clin Oral Implants Res
, vol.5
, pp. 185-189
-
-
Ericsson, I.1
Randow, K.2
Glantz, P.O.3
Lindhe, J.4
Nilner, K.5
-
16
-
-
0034574960
-
Early functional loading of Brånemark dental implants. 5-year clinical follow-up study
-
Ericsson I, Randow K, Nilner K, Peterson A. Early functional loading of Brånemark dental implants. 5-year clinical follow-up study. Clin Implant Dent Relat Res 2000; 2:70-77.
-
(2000)
Clin Implant Dent Relat Res
, vol.2
, pp. 70-77
-
-
Ericsson, I.1
Randow, K.2
Nilner, K.3
Peterson, A.4
-
17
-
-
0031243162
-
Some clinical and radiographical features of submerged and non-submerged titanium implants. A 5-year follow-up study
-
Ericsson I, Randow K, Nilner K, Petersson A. Some clinical and radiographical features of submerged and non-submerged titanium implants. A 5-year follow-up study. Clin Oral Implants Res 1997; 8:422-426.
-
(1997)
Clin Oral Implants Res
, vol.8
, pp. 422-426
-
-
Ericsson, I.1
Randow, K.2
Nilner, K.3
Petersson, A.4
-
18
-
-
0036715925
-
Early intraoral splinting and loading of one-stage dental implants in the edentulous mandible: Literature review and case report
-
Exbrayat P. Early intraoral splinting and loading of one-stage dental implants in the edentulous mandible: literature review and case report. Pract Proc Aesthet Dent 2002; 14:529-536.
-
(2002)
Pract Proc Aesthet Dent
, vol.14
, pp. 529-536
-
-
Exbrayat, P.1
-
19
-
-
0035350613
-
Immediate loading of implants with fixed restorations in the completely edentulous mandible: Report of 27 patients from a private practice
-
Ganeles J, Rosenberg MM, Holt RL, Reichman LH. Immediate loading of implants with fixed restorations in the completely edentulous mandible: report of 27 patients from a private practice. Int J Oral Maxillofac Implants 2001; 16:418-426.
-
(2001)
Int J Oral Maxillofac Implants
, vol.16
, pp. 418-426
-
-
Ganeles, J.1
Rosenberg, M.M.2
Holt, R.L.3
Reichman, L.H.4
-
20
-
-
0034186403
-
Implant-retained mandibular overdentures with immediate loading. A prospective study of ITI implants
-
Gatti C, Haefliger W, Chiapasco M. Implant-retained mandibular overdentures with immediate loading. A prospective study of ITI implants. Int J Oral Maxillofac Implants 2000; 15:383-388.
-
(2000)
Int J Oral Maxillofac Implants
, vol.15
, pp. 383-388
-
-
Gatti, C.1
Haefliger, W.2
Chiapasco, M.3
-
21
-
-
0035748966
-
Immediate occlusal loading of Brånemark implants applied in various jawbone regions: A prospective, 1-year clinical study
-
Glauser R, Ree A, Lundgren A, Gottlow J, Hammerle CH, Scharer P. Immediate occlusal loading of Brånemark implants applied in various jawbone regions: a prospective, 1-year clinical study. Clin Implant Dent Relat Res 2001; 3:204-213.
-
(2001)
Clin Implant Dent Relat Res
, vol.3
, pp. 204-213
-
-
Glauser, R.1
Ree, A.2
Lundgren, A.3
Gottlow, J.4
Hammerle, C.H.5
Scharer, P.6
-
22
-
-
0035756677
-
Immediate functional loading of immediate implants in edentulous arches: Two-year results
-
Grunder U. Immediate functional loading of immediate implants in edentulous arches: two-year results. Int J Periodontics Restorative Dent 2001; 21:545-551.
-
(2001)
Int J Periodontics Restorative Dent
, vol.21
, pp. 545-551
-
-
Grunder, U.1
-
23
-
-
0034584224
-
Single-stage, immediate loading, and flapless surgery
-
Hahn J. Single-stage, immediate loading, and flapless surgery. J Oral Implantol 2000; 26:193-198.
-
(2000)
J Oral Implantol
, vol.26
, pp. 193-198
-
-
Hahn, J.1
-
24
-
-
0035224741
-
Immediate provisional for single-tooth implant replacement with Bråemark system: Preliminary report
-
Hui E, Chow J, Li D, Liu J, Wat P, Law H. Immediate provisional for single-tooth implant replacement with Bråemark system: preliminary report. Clin Implant Dent Relat Res 2001; 3:79-86.
-
(2001)
Clin Implant Dent Relat Res
, vol.3
, pp. 79-86
-
-
Hui, E.1
Chow, J.2
Li, D.3
Liu, J.4
Wat, P.5
Law, H.6
-
25
-
-
0036048495
-
Immediate loading of osseotite implants: Two-year results
-
Ibanez JC, Jalbout ZN. Immediate loading of osseotite implants: two-year results. Implant Dent 2002; 11:128-36.
-
(2002)
Implant Dent
, vol.11
, pp. 128-136
-
-
Ibanez, J.C.1
Jalbout, Z.N.2
-
26
-
-
0034183762
-
Immediate loading of implants in partially and fully edentulous jaws. A series of 27 case reports
-
Jaffin RA, Kumar A, Berman CL. Immediate loading of implants in partially and fully edentulous jaws. A series of 27 case reports. J Periodontol 2000; 71:833-838.
-
(2000)
J Periodontol
, vol.71
, pp. 833-838
-
-
Jaffin, R.A.1
Kumar, A.2
Berman, C.L.3
-
27
-
-
0032233311
-
A prospective multicenter study evaluating loading of osseotite implants two months after placement: One-year results
-
Lazzara RJ, Porter SS, Testori T, Galante J, Zetterqvist L. A prospective multicenter study evaluating loading of osseotite implants two months after placement: one-year results. J Esthet Dent 1998; 10:280-289.
-
(1998)
J Esthet Dent
, vol.10
, pp. 280-289
-
-
Lazzara, R.J.1
Porter, S.S.2
Testori, T.3
Galante, J.4
Zetterqvist, L.5
-
28
-
-
0042961795
-
Das TPS-schraubeimplantat nach siebenjåhriger anwendung
-
Ledermann PD. Das TPS-schraubeimplantat nach siebenjåhriger anwendung. Quintessenz 1984; 30:1-11.
-
(1984)
Quintessenz
, vol.30
, pp. 1-11
-
-
Ledermann, P.D.1
-
29
-
-
0025582810
-
Immediate loading of cylinder implants with overdentures in the mandibular symphysis: The titanium plasma-sprayed screw technique
-
Lefkove MD, Beals RP. Immediate loading of cylinder implants with overdentures in the mandibular symphysis: the titanium plasma-sprayed screw technique. J Oral Implantol 1990; 16:265-271.
-
(1990)
J Oral Implantol
, vol.16
, pp. 265-271
-
-
Lefkove, M.D.1
Beals, R.P.2
-
30
-
-
0034574209
-
Immediate function of Brånemark implants in the esthetic zone: A retrospective clinical study with 6 months to 4 years of follow-up
-
Maló P, Rangert B, Dvärsäter L. Immediate function of Brånemark implants in the esthetic zone: a retrospective clinical study with 6 months to 4 years of follow-up. Clin Implant Dent Relat Res 2000; 2:138-146.
-
(2000)
Clin Implant Dent Relat Res
, vol.2
, pp. 138-146
-
-
Maló, P.1
Rangert, B.2
Dvärsäter, L.3
-
31
-
-
0034574211
-
Measurements comparing the initial stability of five designs of dental implants: A human cadaver study
-
O'Sullivan D, Sennerby L, Meredith N. Measurements comparing the initial stability of five designs of dental implants: a human cadaver study. Clin Implant Dent Relat Res 2000; 2:85-92.
-
(2000)
Clin Implant Dent Relat Res
, vol.2
, pp. 85-92
-
-
O'Sullivan, D.1
Sennerby, L.2
Meredith, N.3
-
32
-
-
0035235832
-
One-year prospective evaluation of the early loading of unsplinted conical Brånemark fixtures with mandibular overdentures immediately following surgery
-
Payne A, Tawse-Smith A, Kumare R, Thomson M. One-year prospective evaluation of the early loading of unsplinted conical Brånemark fixtures with mandibular overdentures immediately following surgery. Clin Implant Dent Relat Res 2001; 3:9-19.
-
(2001)
Clin Implant Dent Relat Res
, vol.3
, pp. 9-19
-
-
Payne, A.1
Tawse-Smith, A.2
Kumare, R.3
Thomson, M.4
-
33
-
-
0036042935
-
Immediate restoration of multiple tooth implants for aesthetic implant restorations
-
Petrungaro PS. Immediate restoration of multiple tooth implants for aesthetic implant restorations. Implant Dent 2002; 11:118-127.
-
(2002)
Implant Dent
, vol.11
, pp. 118-127
-
-
Petrungaro, P.S.1
-
34
-
-
0036631918
-
Effects of immediate loading with threaded hydroxyapatite-coated root-form implants on single premolar replacements: A preliminary report
-
Proussaefs P, Kan J, Lozada J, Kleinman A, Farnos A. Effects of immediate loading with threaded hydroxyapatite-coated root-form implants on single premolar replacements: a preliminary report. Int J Oral Maxillofac Implants 2002; 17:567-572.
-
(2002)
Int J Oral Maxillofac Implants
, vol.17
, pp. 567-572
-
-
Proussaefs, P.1
Kan, J.2
Lozada, J.3
Kleinman, A.4
Farnos, A.5
-
35
-
-
0035316194
-
Immediate loading of single root form implants with the use of a custom acrylic stent
-
Proussaefs P, Lozada J. Immediate loading of single root form implants with the use of a custom acrylic stent. J Prosthet Dent 2001; 85:382-385.
-
(2001)
J Prosthet Dent
, vol.85
, pp. 382-385
-
-
Proussaefs, P.1
Lozada, J.2
-
36
-
-
0033072986
-
Immediate functional loading of Brånemark dental implants. An 18-month clinical follow-up study
-
Randow K, Ericsson I, Nilner K, Petersson A, Glantz PO. Immediate functional loading of Brånemark dental implants. An 18-month clinical follow-up study. Clin Oral Implants Res 1999; 10:8-15.
-
(1999)
Clin Oral Implants Res
, vol.10
, pp. 8-15
-
-
Randow, K.1
Ericsson, I.2
Nilner, K.3
Petersson, A.4
Glantz, P.O.5
-
37
-
-
0348017064
-
A comparative clinical investigation of 2 early loaded ITI dental implants supporting an overdenture in the mandible
-
Roynesdal A-K, Amundrud B, Hannaes H. A comparative clinical investigation of 2 early loaded ITI dental implants supporting an overdenture in the mandible. Int J Oral Maxillofac Implants 2001; 16:246-251.
-
(2001)
Int J Oral Maxillofac Implants
, vol.16
, pp. 246-251
-
-
Roynesdal, A.-K.1
Amundrud, B.2
Hannaes, H.3
-
38
-
-
0036483796
-
Peri-implant tissue response of immediately loaded, threaded, HA-coated implants: 1-Year results
-
Rungcharassaeng K, Lozada JL, Kan JY, Kim JS, Campagni WV, Munoz CA. Peri-implant tissue response of immediately loaded, threaded, HA-coated implants: 1-year results. J Prosthet Dent 2002; 87:173-181.
-
(2002)
J Prosthet Dent
, vol.87
, pp. 173-181
-
-
Rungcharassaeng, K.1
Lozada, J.L.2
Kan, J.Y.3
Kim, J.S.4
Campagni, W.V.5
Munoz, C.A.6
-
39
-
-
0034578106
-
Use of immediately loaded press-fit cylinder implants in oral reconstruction
-
Schaner PJ II, Kraut RA. Use of immediately loaded press-fit cylinder implants in oral reconstruction. Implant Dent 2000; 9:76-82.
-
(2000)
Implant Dent
, vol.9
, pp. 76-82
-
-
Schaner P.J. II1
Kraut, R.A.2
-
40
-
-
0042072188
-
Brånemark implants loaded with fixed provisional prostheses at fixture placement. Nine-year follow-up
-
Schnitman PA. Brånemark implants loaded with fixed provisional prostheses at fixture placement. Nine-year follow-up. J Oral Implantol 1995; 21:234.
-
(1995)
J Oral Implantol
, vol.21
, pp. 234
-
-
Schnitman, P.A.1
-
41
-
-
0025618219
-
Immediate fixed interim prostheses supported by 2-stage threaded implants. Methodology and results
-
Schnitman PA, Wöhrle PS, Rubenstein JE. Immediate fixed interim prostheses supported by 2-stage threaded implants. Methodology and results. J Oral Implantol 1990; 16:96-105.
-
(1990)
J Oral Implantol
, vol.16
, pp. 96-105
-
-
Schnitman, P.A.1
Wöhrle, P.S.2
Rubenstein, J.E.3
-
42
-
-
0031178276
-
Ten-year results for Brånemark implants immediately loaded with fixed prostheses at implant placement
-
Schnitman PA, Wöhrle PS, Rubenstein JE, DaSilva JD, Wang NH. Ten-year results for Brånemark implants immediately loaded with fixed prostheses at implant placement. Int J Oral Maxillofac Implants 1997; 12:495-503.
-
(1997)
Int J Oral Maxillofac Implants
, vol.12
, pp. 495-503
-
-
Schnitman, P.A.1
Wöhrle, P.S.2
Rubenstein, J.E.3
DaSilva, J.D.4
Wang, N.H.5
-
43
-
-
0017970047
-
Tierexperimente zur frage der einheilung des Tübinger Sofortimplantates
-
Schulte W, Kleineikenscheidt H, Lindner K, et al. Tierexperimente zur frage der einheilung des Tübinger Sofortimplantates. Dtsch Zahnartzl Z 1978; 33:326-331.
-
(1978)
Dtsch Zahnartzl Z
, vol.33
, pp. 326-331
-
-
Schulte, W.1
Kleineikenscheidt, H.2
Lindner, K.3
-
44
-
-
0035495525
-
Immediate loading of dental implants in the edentulous mandible: A preliminary case report from an international prospective multicenter study
-
Siddiqui AA, Ismail JY, Kukunas S. Immediate loading of dental implants in the edentulous mandible: a preliminary case report from an international prospective multicenter study. Compend Contin Educ Dent 2000; 22:867-870, 873-874
-
(2000)
Compend Contin Educ Dent
, vol.22
, pp. 867-870
-
-
Siddiqui, A.A.1
Ismail, J.Y.2
Kukunas, S.3
-
45
-
-
0031136510
-
Immediate loading of threaded implants at stage 1 surgery in edentulous arches. Ten consecutive case reports with 1- to 5-year data
-
Tarnow DP, Emtiaz S, Classi A. Immediate loading of threaded implants at stage 1 surgery in edentulous arches. Ten consecutive case reports with 1- to 5-year data. Int J Oral Maxillofac Implants 1997; 12:319-324.
-
(1997)
Int J Oral Maxillofac Implants
, vol.12
, pp. 319-324
-
-
Tarnow, D.P.1
Emtiaz, S.2
Classi, A.3
-
46
-
-
0036365690
-
Early loading of unsplinted implants supporting mandibular overdentures using a one-stage operative procedure with two different implant systems: A 2-year report
-
Tawse-Smith A, Payne AG, Kumara R, Thomson WM. Early loading of unsplinted implants supporting mandibular overdentures using a one-stage operative procedure with two different implant systems: a 2-year report. Clin Implant Dent Relat Res 2002; 4:33-42.
-
(2002)
Clin Implant Dent Relat Res
, vol.4
, pp. 33-42
-
-
Tawse-Smith, A.1
Payne, A.G.2
Kumara, R.3
Thomson, W.M.4
-
47
-
-
0035749825
-
One-stage operative procedure using two different implant systems: A prospective study on implant overdentures in the edentulous mandible
-
Tawse-Smith A, Perio C, Payne AG, Kumara R, Thomson WM. One-stage operative procedure using two different implant systems: a prospective study on implant overdentures in the edentulous mandible. Clin Implant Dent Relat Res 2001; 3:185-193.
-
(2001)
Clin Implant Dent Relat Res
, vol.3
, pp. 185-193
-
-
Tawse-Smith, A.1
Perio, C.2
Payne, A.G.3
Kumara, R.4
Thomson, W.M.5
-
48
-
-
0032196403
-
Single tooth replacement in the aeshetic zone with immediate provisionalization: Fourteen consecutive case reports
-
Wöhrle P. Single tooth replacement in the aeshetic zone with immediate provisionalization: fourteen consecutive case reports. Pract Periodontics Aesthet Dent 1998; 9:1107-1114.
-
(1998)
Pract Periodontics Aesthet Dent
, vol.9
, pp. 1107-1114
-
-
Wöhrle, P.1
|