메뉴 건너뛰기




Volumn 35, Issue 10, 2003, Pages 965-972

Analysis of workflow protocol adaptability in TestLAN production systems

Author keywords

[No Author keywords available]

Indexed keywords

INDUSTRIAL ENGINEERING; LOCAL AREA NETWORKS; NETWORK PROTOCOLS; PRODUCT DESIGN; PRODUCT DEVELOPMENT; RESOURCE ALLOCATION;

EID: 0041417613     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170309342348     Document Type: Article
Times cited : (5)

References (28)
  • 4
    • 0345920604 scopus 로고    scopus 로고
    • Usefulness of adaptive load sharing for parallel processing on networks of workstations
    • Clarke, S., and Dandamudi, S. P., 1999. Usefulness of adaptive load sharing for parallel processing on networks of workstations. Concurrency Practice & Experience, 11 (8):387–405.
    • (1999) Concurrency Practice & Experience , vol.11 , Issue.8 , pp. 387-405
    • Clarke, S.1    Dandamudi, S.P.2
  • 5
    • 0032662236 scopus 로고    scopus 로고
    • Dynamic dispatching rule-pairs for multitasking workers in JIT production systems
    • Cochran, J. K., and Horng, H. C., 1999. Dynamic dispatching rule-pairs for multitasking workers in JIT production systems. International Journal of Production Research, 37 (10):2175–2190.
    • (1999) International Journal of Production Research , vol.37 , Issue.10 , pp. 2175-2190
    • Cochran, J.K.1    Horng, H.C.2
  • 7
    • 0028590749 scopus 로고
    • Real-time distributed scheduling of heterarchical manufacturing systems
    • Duffie, N. A., and Prabhu, V., 1994. Real-time distributed scheduling of heterarchical manufacturing systems. Journal of Manufacturing Systems, 13 (2):94–107.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.2 , pp. 94-107
    • Duffie, N.A.1    Prabhu, V.2
  • 8
    • 25544443281 scopus 로고
    • Introduction to the cluster on machine learning approaches to scheduling
    • Erengüç, S. S., 1994. Introduction to the cluster on machine learning approaches to scheduling. IEEE Transactions on Engineering Management, 41 (2):107
    • (1994) IEEE Transactions on Engineering Management , vol.41 , Issue.2 , pp. 107
    • Erengüç, S.S.1
  • 10
    • 0032290684 scopus 로고    scopus 로고
    • Client-server model of integrated production facilities
    • Esfarjani, K., and Nof, S. Y., 1998. Client-server model of integrated production facilities. International Journal of Production Research, 36 (12):3295–3321.
    • (1998) International Journal of Production Research , vol.36 , Issue.12 , pp. 3295-3321
    • Esfarjani, K.1    Nof, S.Y.2
  • 11
    • 0030085559 scopus 로고    scopus 로고
    • A GRASP for scheduling printed wiring board assembly
    • Feo, T. A., Bard, J. F., and Holland, S. D., 1996. A GRASP for scheduling printed wiring board assembly. IIE Transactions, 28 (2):155–165.
    • (1996) IIE Transactions , vol.28 , Issue.2 , pp. 155-165
    • Feo, T.A.1    Bard, J.F.2    Holland, S.D.3
  • 14
    • 0000432419 scopus 로고
    • Adaptive coordination of a learning team
    • Lounamaa, P. H., and March, J. G., 1987. Adaptive coordination of a learning team. Management Science, 33 (1):107–123.
    • (1987) Management Science , vol.33 , Issue.1 , pp. 107-123
    • Lounamaa, P.H.1    March, J.G.2
  • 15
    • 0002618173 scopus 로고    scopus 로고
    • From efficiency to flexibility: The strategic use of information in the airline industry
    • Monteiro, L., and Macdonald, S., 1996. From efficiency to flexibility:the strategic use of information in the airline industry. Journal of Strategic Information Systems, 5 (3):169–188.
    • (1996) Journal of Strategic Information Systems , vol.5 , Issue.3 , pp. 169-188
    • Monteiro, L.1    Macdonald, S.2
  • 18
    • 0031165072 scopus 로고    scopus 로고
    • Dynamic selection of dispatching rules for manufacturing system scheduling
    • Pierreval, H., and Mebarki, N., 1997. Dynamic selection of dispatching rules for manufacturing system scheduling. International Journal of Production Research, 35 (6):1575–1591.
    • (1997) International Journal of Production Research , vol.35 , Issue.6 , pp. 1575-1591
    • Pierreval, H.1    Mebarki, N.2
  • 20
    • 0027699991 scopus 로고
    • An efficient dynamic dispatching rule for scheduling in a job shop
    • Raghu, T. S., and Rajendran, C., 1993. An efficient dynamic dispatching rule for scheduling in a job shop. International Journal of Production Economics, 32 (3):301–313.
    • (1993) International Journal of Production Economics , vol.32 , Issue.3 , pp. 301-313
    • Raghu, T.S.1    Rajendran, C.2
  • 21
    • 0023419094 scopus 로고
    • A distributed scheduling method for computer integrated manufacturing: The use of local area networks in cellular systems
    • Shaw, M. J., 1987. A distributed scheduling method for computer integrated manufacturing:the use of local area networks in cellular systems. International Journal of Production Research, 25 (9):1285–1303.
    • (1987) International Journal of Production Research , vol.25 , Issue.9 , pp. 1285-1303
    • Shaw, M.J.1
  • 22
    • 0012595570 scopus 로고
    • FMS scheduling as cooperative problem solving
    • Shaw, M. J., 1989. FMS scheduling as cooperative problem solving. Annuals of Operations Research, 17 (1/4):323–346.
    • (1989) Annuals of Operations Research , vol.17 , Issue.1-4 , pp. 323-346
    • Shaw, M.J.1
  • 24
    • 0034504179 scopus 로고    scopus 로고
    • Distributed artificial intelligence for FMS scheduling, control and design support
    • Trentesaux, D., Pesin, P., and Tahon, C., 2000. Distributed artificial intelligence for FMS scheduling, control and design support. Journal of Intelligence Manufacturing, 11 (6):573–589.
    • (2000) Journal of Intelligence Manufacturing , vol.11 , Issue.6 , pp. 573-589
    • Trentesaux, D.1    Pesin, P.2    Tahon, C.3
  • 25
    • 0004250813 scopus 로고
    • West Lafayette, IN: School of Industrial Engineering, Purdue University, Research memorandum, no 95–7
    • Williams, N. P., and Nof, S. Y., 1995. TestLAN:an approach to integrated testing system design, West Lafayette, IN:School of Industrial Engineering, Purdue University. Research memorandum, no 95–7
    • (1995) TestLAN: An approach to integrated testing system design
    • Williams, N.P.1    Nof, S.Y.2
  • 26
    • 85023912888 scopus 로고    scopus 로고
    • West Lafayette, IN: School of Industrial Engineering, Purdue University, Research memorandum, no 98–6
    • Williams, N. P., and Nof, S. Y., 1998. User manual for the TestLAN simulator, West Lafayette, IN:School of Industrial Engineering, Purdue University. Research memorandum, no 98–6
    • (1998) User manual for the TestLAN simulator
    • Williams, N.P.1    Nof, S.Y.2
  • 28
    • 0037146393 scopus 로고    scopus 로고
    • TestLAN approach and protocols for the integration of distributed assembly and test networks
    • Williams, N. P., Liu, Y., and Nof, S. Y., 2002. TestLAN approach and protocols for the integration of distributed assembly and test networks. International Journal of Production Research, 40 (17):4505–4522.
    • (2002) International Journal of Production Research , vol.40 , Issue.17 , pp. 4505-4522
    • Williams, N.P.1    Liu, Y.2    Nof, S.Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.